Por favor, insira palavras-chave para pesquisar

Global |EN

Escolha seu país e idioma

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore

Middle East & Africa

Kenya
Saudi Arabia
South Africa
United Arab Emirates

Europe

France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom

Latin America

Brazil
Colombia
Ecuador
Peru

North America

Canada
Mexico
United States
Energia solar fotovoltaica e ESS residencial
Solução de energia solar residencial

Escolha seu país e idioma

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Kenya
Saudi Arabia
South Africa
United Arab Emirates
France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom
Brazil
Colombia
Ecuador
Peru
Canada
Mexico
United States

Por favor, insira palavras-chave para pesquisar

Seu termo de pesquisa contém palavras restritas. Por favor, use outras palavras.

CHINT Provides PV EPC+F for Biggest Firm in Latin America

SEP 14, 2022

Relying on the advantages of a localized platform and industrial chain, excellent product quality, and professional technical support services, CHINT was selected by a well-known business group in Latin America as the general contractor of its integrated rooftop photovoltaic power station.

In May 2021, the two parties jointly confirmed and signed the terms of cooperation. The first project has an installed capacity of 7.75MW including 7 integrated rooftop photovoltaic systems. CHINT will provide financing, product integration and supply, local import and installation services and power station operation and maintenance services.

The roof of the enterprise has a large effective area and a large proportion of load during the day. After exploring its roof structure and analyzing its load situation and absorbing capacity with digital methods, we contracted to build this distributed photovoltaic power station for the owner to help the enterprise in energy saving, carbon reduction, transformation and upgrading.

It took 14 months to complete the project, successfully passed the approval of the power company, and connected to the grid at full power.

The second phase of the company’s project was also reached a cooperative agreement in the first half of this year, with an installed capacity of 10MW on 10 complexes. Currently, the contract is being successfully implemented, and it is planned to be fully connected to the grid in the first quarter of 2023.

It is estimated that the total annual power generation of these two power stations will reach 25 million kWh, which can be 100% used by this enterprise. While saving electricity expenses, it can also enhance the corporate image and achieve green development.

CHINT Global Latin America team focuses on the development of the new energy market, breaking through the simple equipment buying and selling relationship, and opening up a turnkey consultative service model that provides users with smart integrated energy solutions and engineering installations, and helps owners to achieve energy saving and lowering costs.

The Latest
JUNE 4, 2026 Powering Innovation, Join the 3rd CHINT Cup Now

Apply for the 2026 CHINT Cup Youth Innovation Contest and compete in green development, smart electrical, and tech innovation tracks for global awards and incubation support.

JUNE 2, 2026 Powering Clean Energy in the Andes | CHINT Supports Renewable Project in Peru

CHINT supports ENGIE’s Intipampa Wind Power Station in Peru with a 75MVA 138kV power transformer, enabling reliable clean energy delivery in the Andes.

MAY 26, 2026 CHINT Electrics: 2025 Sustainability Report

Explore CHINT Electrics’ 2025 Sustainability Report, highlighting ESG strategy, carbon neutrality goals, green innovation, responsible governance, and global sustainable development progress.

MAY 25, 2026 CHINT Electrics Releases Its First Climate-Related Financial Information Disclosure Report, Delivering on Its "Dual Carbon" Commitments Through Reliable Action

CHINT Electrics released its first TCFD-aligned climate-related financial disclosure report, highlighting climate governance, risk management, carbon targets, and its commitment to sustainable development.

MAY 13, 2026 Empowering the Next Generation of AI Infrastructure with Unmatched Speed

Discover how NOARK Electric delivered a same-day quote and fast-tracked transformers and switchboards for a major AI data center project in North America.

MAY 6, 2026 CHINT Electrics Q1 Report of 2026 & Annual Report of 2025

CHINT Electrics Q1 2026 report highlights growth in smart electrics and green energy, advancing digital and zero-carbon solutions while expanding global markets.

MAY 6, 2026 CHINT Validates Industry-Leading 60Hz 800kvar Capacitor Unit and 145kV GIS for High-Demand Grid Applications

CHINT’s 60Hz 800kvar capacitor unit and 145kV GIS pass KEMA & C2-class tests, proving reliable performance, superior switching, and technical strength for high-demand global power grids.

APRIL 30, 2026 Powering Central Asia’s Green Future: CHINT Delivers MV Skid Solution for MASDAR Bukhara 250MW Solar PV Plant

CHINT delivers an integrated MV skid solution for the MASDAR Bukhara 250MW Solar PV Plant, supporting reliable solar-plus-storage power in Uzbekistan.

APRIL 27, 2026 165-ton Transformer Successfully Shipped: CHINT Sets a New Paradigm for Global Heavy-Duty Delivery

CHINT successfully shipped a 165-ton 400kV transformer to Spain using an innovative MAFI trailer and RoRo vessel solution, setting a new benchmark for safe, efficient global heavy-duty equipment delivery.

APRIL 13, 2026 CHINT Showcased Its Largest Presence at FEICON 2026 and Announces Local Assembly of Air Circuit Breaker in Brazil

CHINT showcased its largest FEICON 2026 presence in Brazil, unveiling new power solutions and announcing local Air Circuit Breaker assembly for faster supply.