Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore

Middle East & Africa

Kenya
Saudi Arabia
South Africa
United Arab Emirates

Europe

France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom

Latin America

Brazil
Colombia
Ecuador
Peru

North America

Canada
Mexico
United States

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Kenya
Saudi Arabia
South Africa
United Arab Emirates
France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom
Brazil
Colombia
Ecuador
Peru
Canada
Mexico
United States

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT empower the Hunutlu power plant in Turkey

NOV 5, 2019

With the advantages of product technology and price competition, CHINT's brand awareness in Turkey has been constantly improved. In the Hunutlu power plant this year, the largest project invested by China, CHINT provided on-site temporary distribution cabinet products and completed the business upgrade from single component product sales to low-voltage cabinet solution. Taking low-voltage cabinet products as the breakthrough, the project successfully helped CHINT products enter the list of suppliers of the project of Hunutlu power plant, which laid a solid foundation for CHINT to promote other industrial chains in the project.

The Hunutlu power plant project is a key link between China's "Belt and Road" Initiative and Turkey's "middle corridor" plan. With a total investment of about $1.7bn, it is the largest project invested by a Chinese company in Turkey this year, jointly developing and constructing by Shanghai Electric Power, subsidiary of State Power Investment Corporation Limited (SPIC), AVIC INTL and Turkish local shareholders.

The project, signed by President Xi during his visit to Turkey in June 2019, was officially launched in Adana Province in southern Turkey on September 22, 2019. It plans to build two 660MW ultra-supercritical generating units with a planned total installed capacity of 1,320MW. When into operation, it will be able to supply 9bn KWH of electricity annually.

The Latest
MAY 13, 2026 Empowering the Next Generation of AI Infrastructure with Unmatched Speed

Discover how NOARK Electric delivered a same-day quote and fast-tracked transformers and switchboards for a major AI data center project in North America.

MAY 6, 2026 CHINT Electrics Q1 Report of 2026 & Annual Report of 2025

CHINT Electrics Q1 2026 report highlights growth in smart electrics and green energy, advancing digital and zero-carbon solutions while expanding global markets.

MAY 6, 2026 CHINT Validates Industry-Leading 60Hz 800kvar Capacitor Unit and 145kV GIS for High-Demand Grid Applications

CHINT’s 60Hz 800kvar capacitor unit and 145kV GIS pass KEMA & C2-class tests, proving reliable performance, superior switching, and technical strength for high-demand global power grids.

APRIL 30, 2026 Powering Central Asia’s Green Future: CHINT Delivers MV Skid Solution for MASDAR Bukhara 250MW Solar PV Plant

CHINT delivers an integrated MV skid solution for the MASDAR Bukhara 250MW Solar PV Plant, supporting reliable solar-plus-storage power in Uzbekistan.

APRIL 27, 2026 165-ton Transformer Successfully Shipped: CHINT Sets a New Paradigm for Global Heavy-Duty Delivery

CHINT successfully shipped a 165-ton 400kV transformer to Spain using an innovative MAFI trailer and RoRo vessel solution, setting a new benchmark for safe, efficient global heavy-duty equipment delivery.

APRIL 13, 2026 CHINT Showcased Its Largest Presence at FEICON 2026 and Announces Local Assembly of Air Circuit Breaker in Brazil

CHINT showcased its largest FEICON 2026 presence in Brazil, unveiling new power solutions and announcing local Air Circuit Breaker assembly for faster supply.

MARCH 31, 2026 Off-Grid Solar Street Lighting — Soran–Khlefan Tunnel and Mountain Road Safety Upgrade

Discover how an off-grid solar street lighting project in the Soran–Khlefan tunnel and mountain roads of Iraq improved visibility, road safety, and mobility with more than 20 solar-powered lighting poles built for remote, harsh environments.

MARCH 30, 2026 Powering the Future of Rotterdam’s EV Hub

NOARK ACBs ensure safe, reliable low-voltage protection for Rotterdam’s heavy-duty EV charging hub, delivering stable performance in harsh port environments.

MARCH 26, 2026 Enhanced CHINT Customer Service Network: Available Now in Asia-Pacific Region

CHINT launches upgraded Asia-Pacific customer service network with end-to-end support, multilingual access, and expert technical service for efficient global operations.

MARCH 24, 2026 Be Yourself, Everyone is Boundless! A Look Back at International Women's Day from Headquarters

CHINT celebrated International Women’s Day with flowers, blind boxes, and heartfelt activities, reflecting its commitment to DEI and women’s empowerment globally.