Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN

Europe

France
Kazakhstan
Netherlands
Italy
Spain
Turkey
United Kingdom

North America

Mexico

Latin America

Brazil
Colombia
Ecuador
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
France
Kazakhstan
Netherlands
Italy
Spain
Turkey
United Kingdom
Mexico
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

Trace Course – Interface Brief of Electrical Software elec calc

APR 29, 2022

elec calcTM is a software package that enables the calculation of low voltage and high voltage electrical installations produced by TraceSoftware International (TSI), a France company established in 1987. It has the special functions of one line diagram model design, automatic sizing, power and load calculation, power protection option, manufacturer database, document output and printing, etc., providing accurate electrical system calculation and analysis solutions for domestic and foreign power bureau, power engineering companies, power design institutes, panel factories, as well as industrial users such as construction and ships.

It is the second tutorial of the Trace Course and the interface of the software will be introduced in detail.

The screenshot below shows the main sections of the software interface:

           1.Quick access bar

           2.Ribbon

           3.Drawing area

           4.Library

           5.Data area

1. Quick Access bar

It includes commands “New project”, “Open project”, “Save”, “Undo”, “Redo”.

2. Ribbon

It includes ribbons “EC” “Home” “Configuration” “BIM” and “Support”. “EC” ribbon opens the user interfaces From “Home” ribbon, main and generic actions can be done, relative to project design.

3. Drawing area

In this area, one-line diagram is created.

4. Library

It includes all saved standard schematics, available for all projects, without being specific to the current project.

5. Data area

This section shows all data of components inserted in drawing areas, as well as the results of the performed calculations. When activating the data entering view, the data area will have the following appearance:

The Latest
AUGUST 29, 2025 CHINT Colombia: The evolution of a commitment to the energy of the future

CHINT Colombia opens its Bogotá office to boost innovation, clean energy, and sustainable growth, driving the country’s energy transition.

AUGUST 22, 2025 Did you know?People at CHINT Highlights the Voices of Progress

Did you know? Behind every innovation and every connection are people who make it happen.

AUGUST 14, 2025 CHINT Lights Up the Caribbean with Smart Metering

CHINT’s Wi-SUN smart metering transforms a Caribbean island’s power grid, boosting efficiency, cutting losses, and enabling real-time remote control.

AUGUST 5, 2025 CHINT Appoint Legend as Master Distributor For Low Voltage Products in Australia and New Zealand

CHINT appoints Legend Corporation as master distributor of LV products in Australia & NZ, boosting access to quality electrical solutions via CABAC.

AUGUST 5, 2025 Boîtiers STA & NOARK: Powering Reliability Across Public and Private Sectors

Boîtiers STA partners with NOARK to deliver safe, high-performance power solutions for hospitals, parks, and public sectors across Canada.

AUGUST 5, 2025 Did you know - From Components to Integrated Systems

CHINT scales smart manufacturing globally—delivering high to low voltage solutions with localized production, digital innovation, and green factories.

JULY 24, 2025 Countdown Begins: CHINT Cool Season 2025 Launches August 1!

Join CHINT Cool Season 2025 (Aug 1–Oct 31): global promos, new tech, rewards & events for electricians, installers & builders. Don’t miss out!

JULY 21, 2025 CHINT Building the Power Backbone of Urban Transit in Malaysia

CHINT supports MRT Corp in Malaysia with scalable low-voltage solutions, ensuring reliable, future-ready power for over 100 urban rail stations.

JULY 21, 2025 CHINT Breaks South China Smart Tech Hub in Foshan

CHINT breaks ground on a $70M Smart Innovation Park in Foshan, China, driving green energy, smart grid tech, and next-gen manufacturing across South China.

JULY 21, 2025 Did You Know? CHINT Global Manufacturing

Explore CHINT’s global manufacturing network with 30+ smart factories in 10+ countries, driving agile, localized power solutions worldwide.