Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN

Europe

France
Kazakhstan
Netherlands
Italy
Spain
Turkey
United Kingdom

North America

Mexico

Latin America

Brazil
Colombia
Ecuador
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
France
Kazakhstan
Netherlands
Italy
Spain
Turkey
United Kingdom
Mexico
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

Trace Course – Interface Brief of Electrical Software elec calc

APR 29, 2022

elec calcTM is a software package that enables the calculation of low voltage and high voltage electrical installations produced by TraceSoftware International (TSI), a France company established in 1987. It has the special functions of one line diagram model design, automatic sizing, power and load calculation, power protection option, manufacturer database, document output and printing, etc., providing accurate electrical system calculation and analysis solutions for domestic and foreign power bureau, power engineering companies, power design institutes, panel factories, as well as industrial users such as construction and ships.

It is the second tutorial of the Trace Course and the interface of the software will be introduced in detail.

The screenshot below shows the main sections of the software interface:

           1.Quick access bar

           2.Ribbon

           3.Drawing area

           4.Library

           5.Data area

1. Quick Access bar

It includes commands “New project”, “Open project”, “Save”, “Undo”, “Redo”.

2. Ribbon

It includes ribbons “EC” “Home” “Configuration” “BIM” and “Support”. “EC” ribbon opens the user interfaces From “Home” ribbon, main and generic actions can be done, relative to project design.

3. Drawing area

In this area, one-line diagram is created.

4. Library

It includes all saved standard schematics, available for all projects, without being specific to the current project.

5. Data area

This section shows all data of components inserted in drawing areas, as well as the results of the performed calculations. When activating the data entering view, the data area will have the following appearance:

The Latest
OCTOBER 11, 2025 Did you Know CHINT? When Manufacturing Meets ESG

Discover how CHINT leads sustainable manufacturing through ESG—advancing green factories, people-focused initiatives, and responsible governance.

OCTOBER 11, 2025 CHINT Powers a Greener Future at Vietnamese International School

CHINT empowers a Vietnamese international school with an 86kWp solar rooftop system, cutting CO₂ emissions and inspiring eco-conscious education.

SEPTEMBER 23, 2025 CHINT Signs MoU with Prince Sattam bin Abdulaziz University to Advance Smart Energy Research and Innovation

CHINT signs MoU with Prince Sattam bin Abdulaziz University to drive smart energy research, innovation, and sustainable solutions in Saudi Arabia’s Vision 2030.

SEPTEMBER 19, 2025 Lighting Up the Rooftop of Africa: CHINT Anneng’s Journey of Light and Hope

CHINT Anneng’s PVSTAR brings clean solar power to Kenya, lighting homes, powering shops, and driving Africa’s green, sustainable future.

SEPTEMBER 9, 2025 CHINT Semi-Annual Report of 2025

CHINT 2025 Semi-Annual Report: H1 revenue $4.14B (+2.2%) and net profit +32.9%, led by smart electrics, green energy, and global expansion. Released Aug 27.

SEPTEMBER 9, 2025 CHINT Electric Earns EcoVadis Gold, Making a Leap from Bronze to Gold in One Year

CHINT Electric earns EcoVadis Gold Medal, up from Bronze in a year—top 5% globally for Environment, Labor & Human Rights, Ethics and Sustainable Procurement.

AUGUST 29, 2025 CHINT Colombia: The evolution of a commitment to the energy of the future

CHINT Colombia opens its Bogotá office to boost innovation, clean energy, and sustainable growth, driving the country’s energy transition.

AUGUST 22, 2025 Did you know?People at CHINT Highlights the Voices of Progress

Did you know? Behind every innovation and every connection are people who make it happen.

AUGUST 14, 2025 CHINT Lights Up the Caribbean with Smart Metering

CHINT’s Wi-SUN smart metering transforms a Caribbean island’s power grid, boosting efficiency, cutting losses, and enabling real-time remote control.

AUGUST 5, 2025 CHINT Appoint Legend as Master Distributor For Low Voltage Products in Australia and New Zealand

CHINT appoints Legend Corporation as master distributor of LV products in Australia & NZ, boosting access to quality electrical solutions via CABAC.