Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore

Middle East & Africa

Kenya
Saudi Arabia
South Africa
United Arab Emirates

Europe

France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom

Latin America

Brazil
Colombia
Ecuador
Peru

North America

Canada
Mexico
United States

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Kenya
Saudi Arabia
South Africa
United Arab Emirates
France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom
Brazil
Colombia
Ecuador
Peru
Canada
Mexico
United States

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

The Roof of The Gas Station Becomes a Photovoltaic Power Station -- The First Project of Astronergy and Sinopec Has Officially Opened

FEB 14, 2019

Due to environmental pollution raising rate, green energy has recently turned into a global trend. It is a consensus that green energy gradually replaces traditional kerosene power generation. Among the green energies, solar photovoltaic power generation is favored for its advantages of energy saving, environmental protection, safety, practicality and aesthetics. Distributed photovoltaic power generation is supported by national policies because it does not occupy land and can make full use of idle resources of buildings. With the rapid development of photovoltaic industry, the concept of new energy gradually permeates into all walks of life. At the same time, more and more enterprises realize the importance of energy conservation and environmental protection and have started their own green process. Sinopec is one of the main representatives of this process.

Astronergy and Sinopec’s first project of is Hangzhou Nanhuan Road petrol station. Located at the intersection of Jucai Road and Nanhuan Road (No.1568 Nanhuan Road Binjiang district), the gas station covers are made of steel with double columns. The roof is made of color steel tile with a total area of 630m squared. In this project unit, a total of 8 series of components are installed, each of which is equipped with 22 285Wp polysilicon components. Total 176 pieces are installed with a total capacity of 50.16kwp. Besides, a 50kW series inverter is configured and it is connected to the power grid in the way of "self-use & surplus power online".

Astronergy has projects application everywhere in Hangzhou, just like the Hangzhou South & East Railway Stations, the civic center, Xiaoshan Airport, Ganglong City, HIK Vision, HAEP and even snack explorer Be & Cheery. The strategic cooperation with Geely and Cainiao Network is advancing in full swing. In Shaoxing, from CenturyMart to Hengwei Roca, Zhuji Xinnongdu International Trade City, Astronergy has established business cooperation with many commercial real estate projects.

The Latest
JULY 3, 2026 Meeting Europe's Evolving Grid Needs: CHINT Highlights Its Resilient and Future-Ready Solutions for the AI Era at Intersolar Europe 2026

Munich, Germany, June 23–25 – As Europe continues to accelerate its energy transition, the industry's focus is increasingly shifting beyond renewable generation capacity toward grid resilience, system flexibility, and infrastructure modernization.

JULY 3, 2026 Zhejiang CHINT Electrics Releases 2025 TNFD Report: Building a Solid Foundation for Green Development Through Reliable Practices

In 2021, President Xi Jinping delivered an important speech at the Leaders' Summit of the 15th meeting of the Conference of the Parties to the Convention on Biological Diversity (COP15), noting that "Lucid waters and lush mountains are invaluable assets.

JULY 3, 2026 CHINT and Alibaba Cloud Forge Strategic Partnership: Driving Dual Empowerment in the AI Computing Era and Co-Expanding Global Markets

In June, CHINT Group and Alibaba Cloud have officially signed a comprehensive strategic cooperation agreement. The two companies will establish a deep partnership based on mutual empowerment, focusing on three core areas: Artificial Intelligence (AI) large models, cloud and data center infrastructure, and joint global market expansion. This collaboration aims to accelerate the integration and development of smart energy and AI technology.

JULY 3, 2026 Invisible Assurance: The Reliable Backbone of a Training Centre

In Valencia, Spain, an ordinary yet remarkable vocational training centre is quietly orchestrating a delicate balance between temperature and power.

JULY 2, 2026 CHINT Appeared at SNEC 2026: Integrating High, Medium and Low Voltage to Smartly Shape a Green Power Future

On June 3rd, the 19th International Solar Photovoltaic and Smart Energy Conference and Expo (SNEC 2026) grandly opened at the National Exhibition and Convention Center in Shanghai.

JUNE 4, 2026 Powering Innovation, Join the 3rd CHINT Cup Now

Apply for the 2026 CHINT Cup Youth Innovation Contest and compete in green development, smart electrical, and tech innovation tracks for global awards and incubation support.

JUNE 2, 2026 Powering Clean Energy in the Andes | CHINT Supports Renewable Project in Peru

CHINT supports ENGIE’s Intipampa Wind Power Station in Peru with a 75MVA 138kV power transformer, enabling reliable clean energy delivery in the Andes.

MAY 26, 2026 CHINT Electrics: 2025 Sustainability Report

Explore CHINT Electrics’ 2025 Sustainability Report, highlighting ESG strategy, carbon neutrality goals, green innovation, responsible governance, and global sustainable development progress.

MAY 25, 2026 CHINT Electrics Releases Its First Climate-Related Financial Information Disclosure Report, Delivering on Its "Dual Carbon" Commitments Through Reliable Action

CHINT Electrics released its first TCFD-aligned climate-related financial disclosure report, highlighting climate governance, risk management, carbon targets, and its commitment to sustainable development.

MAY 13, 2026 Empowering the Next Generation of AI Infrastructure with Unmatched Speed

Discover how NOARK Electric delivered a same-day quote and fast-tracked transformers and switchboards for a major AI data center project in North America.