Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam

Middle East & Africa

Saudi Arabia
South Africa
UAE
Egypt
Kenya

Europe

France
Kazakhstan
Netherlands
Italy
Spain
Turkey
United Kingdom

North America

Mexico
USA
Canada

Latin America

Brazil
Colombia
Ecuador
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam
Saudi Arabia
South Africa
UAE
Egypt
Kenya
France
Kazakhstan
Netherlands
Italy
Spain
Turkey
United Kingdom
Mexico
USA
Canada
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

The Roof of The Gas Station Becomes a Photovoltaic Power Station -- The First Project of Astronergy and Sinopec Has Officially Opened

FEB 14, 2019

Due to environmental pollution raising rate, green energy has recently turned into a global trend. It is a consensus that green energy gradually replaces traditional kerosene power generation. Among the green energies, solar photovoltaic power generation is favored for its advantages of energy saving, environmental protection, safety, practicality and aesthetics. Distributed photovoltaic power generation is supported by national policies because it does not occupy land and can make full use of idle resources of buildings. With the rapid development of photovoltaic industry, the concept of new energy gradually permeates into all walks of life. At the same time, more and more enterprises realize the importance of energy conservation and environmental protection and have started their own green process. Sinopec is one of the main representatives of this process.

Astronergy and Sinopec’s first project of is Hangzhou Nanhuan Road petrol station. Located at the intersection of Jucai Road and Nanhuan Road (No.1568 Nanhuan Road Binjiang district), the gas station covers are made of steel with double columns. The roof is made of color steel tile with a total area of 630m squared. In this project unit, a total of 8 series of components are installed, each of which is equipped with 22 285Wp polysilicon components. Total 176 pieces are installed with a total capacity of 50.16kwp. Besides, a 50kW series inverter is configured and it is connected to the power grid in the way of "self-use & surplus power online".

Astronergy has projects application everywhere in Hangzhou, just like the Hangzhou South & East Railway Stations, the civic center, Xiaoshan Airport, Ganglong City, HIK Vision, HAEP and even snack explorer Be & Cheery. The strategic cooperation with Geely and Cainiao Network is advancing in full swing. In Shaoxing, from CenturyMart to Hengwei Roca, Zhuji Xinnongdu International Trade City, Astronergy has established business cooperation with many commercial real estate projects.

The Latest
MARCH 31, 2026 Off-Grid Solar Street Lighting — Soran–Khlefan Tunnel and Mountain Road Safety Upgrade

Discover how an off-grid solar street lighting project in the Soran–Khlefan tunnel and mountain roads of Iraq improved visibility, road safety, and mobility with more than 20 solar-powered lighting poles built for remote, harsh environments.

MARCH 30, 2026 Powering the Future of Rotterdam’s EV Hub

NOARK ACBs ensure safe, reliable low-voltage protection for Rotterdam’s heavy-duty EV charging hub, delivering stable performance in harsh port environments.

MARCH 26, 2026 Enhanced CHINT Customer Service Network: Available Now in Asia-Pacific Region

CHINT launches upgraded Asia-Pacific customer service network with end-to-end support, multilingual access, and expert technical service for efficient global operations.

MARCH 24, 2026 Be Yourself, Everyone is Boundless! A Look Back at International Women's Day from Headquarters

CHINT celebrated International Women’s Day with flowers, blind boxes, and heartfelt activities, reflecting its commitment to DEI and women’s empowerment globally.

MARCH 2, 2026 Embedding Sustainability into Long-Term Growth: CHINT Group’s Key ESG Achievements of 2025

CHINT Group advances its 2030 ESG strategy in 2025 with SBTi targets, green supply chain innovation, top ESG ratings, and scalable zero-carbon solutions.

MARCH 2, 2026 CHINT Successfully Delivers First EMS Project in Vietnam, Enabling Smart Energy Management at NTCT

CHINT delivers its first EMS project in Vietnam, upgrading NTCT with smart low-voltage distribution and digital energy management for scalable campus efficiency.

MARCH 2, 2026 CHINT Group 2026 New Year Conference : Green & Intelligent Synergy

CHINT’s 2026 New Year Conference highlights Green & Intelligent Synergy, AI First strategy, and 185B RMB revenue, driving global growth and innovation.

JANUARY 30, 2026 A Deep Dive into CHINT Green Energy Solutions White Paper 2025

Explore CHINT’s Green Energy Solutions White Paper 2025, highlighting decarbonization pathways, smart grids, energy storage, and zero-carbon solutions.

JANUARY 30, 2026 CHINT Secures SBTi Validation, Anchoring Global Climate Action in Science

CHINT earns SBTi validation, joining 10,000+ firms with science-based climate targets and advancing zero-carbon factories, green products, and PV+ solutions.

JANUARY 29, 2026 A Review of CHINT Brand Award Highlights in 2025: Green Innovation Drives Brand Value Growth

In 2025, CHINT earned top global brand and ESG honors, showcasing leadership in green innovation, digitalization, and sustainable energy solutions worldwide.