Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore

Middle East & Africa

Kenya
Saudi Arabia
South Africa
United Arab Emirates

Europe

France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom

Latin America

Brazil
Colombia
Ecuador
Peru

North America

Canada
Mexico
United States

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Kenya
Saudi Arabia
South Africa
United Arab Emirates
France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom
Brazil
Colombia
Ecuador
Peru
Canada
Mexico
United States

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

The Power Story That Happened in Afghanistan

APR 20, 2021

Let’s share a story from a CHINT salesperson of Afghanistan. 

It’s from the WeChat Moments of CHINT Global salesperson of Afghanistan. With a major in science and engineering. she is straightforward, without being sensational at all, but the story makes people understand why an enterprise travelling abroad can overcome difficulties and persist in serving local customers.

She said: "Some time ago, we discussed the overall project schedule with local customers. They told us sincerely: "This project is very important to our country and benefits many people in several provinces. Although the project's completion date is the end of next year, we want to complete the project as soon as possible and so that everyone can use the electricity soon!" 

After hearing this, I was deeply touched and the whole South Asia sales team decided to take this project as the top priority to promote production. At that time, the shipping volume surged and reached almost full capacity, but the customer had finally booked a shipping space. We urgently formulated a plan to work overtime to load our products and finally caught up on shipping schedules. 

Countless people are working hard to help this country, and they all hope that Afghanistan will get better and better. I sincerely wish all the Afghan people I know and don’t know can live better and better! " 

Behind the story is that at the end of 2020, when a wholesale of CHINT electrical equipment was shipped to Afghanistan, the logistics warehouse was overloaded. The customer made great efforts to get the shipping space, hoping for urgent delivery. CHINT responded quickly. Factories all over the country worked overtime overnight to get ready for product packaging, transportation, logistics and customs affairs, and finally successfully caught up with the shipping date. The whole process was hurried but well-organized, which demonstrated the professionalism and efficiency of CHINT as always, and was highly appreciated by the customer. 

For a long time, due to the complex terrain, the scattered rural communities and unstable security conditions, the expansion of the power grid has been extremely difficult, thus the lack of electricity has long plagued Afghanistan. The CHINT Global Asia Pacific team deeply felt the most urgent needs of local customers and people. 

"Go to customers!" CHINT successfully signed the power system upgrade project of the Afghan National Grid with local EPC partners, and provided 220kV and 110kV primary equipment for the project. After 16 months of hard work, the project completed the entire process of pre-planning, preparation, design, and successful shipment. During the period, faced with many difficulties such as tight delivery time, heavy tasks, and blocked transportation, the CHINT team timely adopted the cross-production line resource allocation method for resource allocation and replenishment, which promoted the smooth implementation of the project. 

In this project, CHINT broke many records of its global monomer projects. Among them, the 220kV capacitor bank made a zero breakthrough globally. After the project is completed and put into operation, it will serve the power transmission and distribution systems and substations in many provinces in eastern Afghanistan, improve the existing system, expand the backbone of the country’s power grid and provide conditions for future grid expansion, which positively affect the local economic and social development, greatly facilitating the lives of local people.

"Wish everyone can use the electricity as soon as possible!"

“Wish all the Afghan people I know and don’t know can live better and better!”

The sincere wishes of the local customers in Afghanistan are in our hearts. The mission of the Chinese electric manufacturing enterprises is in our shoulders. The road ahead is not easy, and changing the predicament has never been easy. The journey of CHINT's global development is, in a sense, a history of accumulating customer trust.

The Latest
MAY 13, 2026 Empowering the Next Generation of AI Infrastructure with Unmatched Speed

Discover how NOARK Electric delivered a same-day quote and fast-tracked transformers and switchboards for a major AI data center project in North America.

MAY 6, 2026 CHINT Validates Industry-Leading 60Hz 800kvar Capacitor Unit and 145kV GIS for High-Demand Grid Applications

CHINT’s 60Hz 800kvar capacitor unit and 145kV GIS pass KEMA & C2-class tests, proving reliable performance, superior switching, and technical strength for high-demand global power grids.

MAY 6, 2026 CHINT Electrics Q1 Report of 2026 & Annual Report of 2025

CHINT Electrics Q1 2026 report highlights growth in smart electrics and green energy, advancing digital and zero-carbon solutions while expanding global markets.

APRIL 30, 2026 Powering Central Asia’s Green Future: CHINT Delivers MV Skid Solution for MASDAR Bukhara 250MW Solar PV Plant

CHINT delivers an integrated MV skid solution for the MASDAR Bukhara 250MW Solar PV Plant, supporting reliable solar-plus-storage power in Uzbekistan.

APRIL 27, 2026 165-ton Transformer Successfully Shipped: CHINT Sets a New Paradigm for Global Heavy-Duty Delivery

CHINT successfully shipped a 165-ton 400kV transformer to Spain using an innovative MAFI trailer and RoRo vessel solution, setting a new benchmark for safe, efficient global heavy-duty equipment delivery.

APRIL 13, 2026 CHINT Showcased Its Largest Presence at FEICON 2026 and Announces Local Assembly of Air Circuit Breaker in Brazil

CHINT showcased its largest FEICON 2026 presence in Brazil, unveiling new power solutions and announcing local Air Circuit Breaker assembly for faster supply.

MARCH 31, 2026 Off-Grid Solar Street Lighting — Soran–Khlefan Tunnel and Mountain Road Safety Upgrade

Discover how an off-grid solar street lighting project in the Soran–Khlefan tunnel and mountain roads of Iraq improved visibility, road safety, and mobility with more than 20 solar-powered lighting poles built for remote, harsh environments.

MARCH 30, 2026 Powering the Future of Rotterdam’s EV Hub

NOARK ACBs ensure safe, reliable low-voltage protection for Rotterdam’s heavy-duty EV charging hub, delivering stable performance in harsh port environments.

MARCH 26, 2026 Enhanced CHINT Customer Service Network: Available Now in Asia-Pacific Region

CHINT launches upgraded Asia-Pacific customer service network with end-to-end support, multilingual access, and expert technical service for efficient global operations.

MARCH 24, 2026 Be Yourself, Everyone is Boundless! A Look Back at International Women's Day from Headquarters

CHINT celebrated International Women’s Day with flowers, blind boxes, and heartfelt activities, reflecting its commitment to DEI and women’s empowerment globally.