Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore

Middle East & Africa

Kenya
Saudi Arabia
South Africa
United Arab Emirates

Europe

France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom

Latin America

Brazil
Colombia
Ecuador
Peru

North America

Canada
Mexico
United States

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Kenya
Saudi Arabia
South Africa
United Arab Emirates
France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom
Brazil
Colombia
Ecuador
Peru
Canada
Mexico
United States

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT's first substation project as EPC contractor in Kuwait

SEP 17, 2019

CHINT T&D has announced the partnership with Public Authority for Housing Welfare (PAHW) of Kuwait by signing an EPC contract on Mutlaa substation project with 6 132kV substations in design, construction, installation and commissioning, marking the first step into substation EPC sector as a Chinese private enterprise in Kuwait.

 

Muneera Al Omraan, director of contract dept. of PAHW attended the signing ceremony together with Chen Chengjian, president of CHINT T&D. The general manager of PAHW warmly welcomed CHINT T&D team and congratulated to the project.

 

Rome was not built in a day. CHINT T&D has laid solid foundation for this incredible achievement over years. As early as 2014, CHINT T&D passed the qualified examination of Ministry of Electricity and Water (MEW), setting foot on the road to compete with European, American, Japanese and Korean enterprises.

 

From 2015, CHINT T&D provided equipment for dozens of substation projects of Kuwait Oil Company (KOC), MEW and PAHW, supplying and making use of more than 300 bays of GIS and several power transformers, ensuring the local living and industrial production of electricity and enhancing CHINT brand with high quality and service reputation.

 

In the support and guidance of this signing, Cheng Yongru, Commercial Counsellor of the Embassy of China in Kuwait, accompanied by Chen Chengjian, president of CHINT T&D, paid a business visit to the well-running Wafra project, where CHINT T&D offered full set of 132kV GIS with modular, miniaturization and maintainable features. Counsellor Cheng congratulated CHINT T&D on the successful signing of the EPC contract. He praised the quality of CHINT T&D products and expressed his wishes of stable and long-term development to CHINT.

The Latest
MAY 13, 2026 Empowering the Next Generation of AI Infrastructure with Unmatched Speed

Discover how NOARK Electric delivered a same-day quote and fast-tracked transformers and switchboards for a major AI data center project in North America.

MAY 6, 2026 CHINT Electrics Q1 Report of 2026 & Annual Report of 2025

CHINT Electrics Q1 2026 report highlights growth in smart electrics and green energy, advancing digital and zero-carbon solutions while expanding global markets.

MAY 6, 2026 CHINT Validates Industry-Leading 60Hz 800kvar Capacitor Unit and 145kV GIS for High-Demand Grid Applications

CHINT’s 60Hz 800kvar capacitor unit and 145kV GIS pass KEMA & C2-class tests, proving reliable performance, superior switching, and technical strength for high-demand global power grids.

APRIL 30, 2026 Powering Central Asia’s Green Future: CHINT Delivers MV Skid Solution for MASDAR Bukhara 250MW Solar PV Plant

CHINT delivers an integrated MV skid solution for the MASDAR Bukhara 250MW Solar PV Plant, supporting reliable solar-plus-storage power in Uzbekistan.

APRIL 27, 2026 165-ton Transformer Successfully Shipped: CHINT Sets a New Paradigm for Global Heavy-Duty Delivery

CHINT successfully shipped a 165-ton 400kV transformer to Spain using an innovative MAFI trailer and RoRo vessel solution, setting a new benchmark for safe, efficient global heavy-duty equipment delivery.

APRIL 13, 2026 CHINT Showcased Its Largest Presence at FEICON 2026 and Announces Local Assembly of Air Circuit Breaker in Brazil

CHINT showcased its largest FEICON 2026 presence in Brazil, unveiling new power solutions and announcing local Air Circuit Breaker assembly for faster supply.

MARCH 31, 2026 Off-Grid Solar Street Lighting — Soran–Khlefan Tunnel and Mountain Road Safety Upgrade

Discover how an off-grid solar street lighting project in the Soran–Khlefan tunnel and mountain roads of Iraq improved visibility, road safety, and mobility with more than 20 solar-powered lighting poles built for remote, harsh environments.

MARCH 30, 2026 Powering the Future of Rotterdam’s EV Hub

NOARK ACBs ensure safe, reliable low-voltage protection for Rotterdam’s heavy-duty EV charging hub, delivering stable performance in harsh port environments.

MARCH 26, 2026 Enhanced CHINT Customer Service Network: Available Now in Asia-Pacific Region

CHINT launches upgraded Asia-Pacific customer service network with end-to-end support, multilingual access, and expert technical service for efficient global operations.

MARCH 24, 2026 Be Yourself, Everyone is Boundless! A Look Back at International Women's Day from Headquarters

CHINT celebrated International Women’s Day with flowers, blind boxes, and heartfelt activities, reflecting its commitment to DEI and women’s empowerment globally.