Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Singapore (Sunlight)
Vietnam

West Asia and Africa

CHINT-EGEMAC
South Africa
UAE

Europe

Italy
Spain
Turkey

North America

Mexico

Latin America

Brazil
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
South Africa
UAE
Italy
Spain
Turkey
Mexico
Brazil
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

454MW TOPCon! CHINT Won Bid for Brazil Vista Alegre PV Station

MARCH 20, 2023

for-Brazil-Vista-Alegre-PV-Station-20240320
for-Brazil-Vista-Alegre-PV-Station-20240320
for Brazil Vista Alegre PV Station 20240320

Recently, CHINT Astronergy won the bid for the 902MW Vista Alegre photovoltaic power plant project of Atlas Renewable Energy in Brazil, and will supply 454MW of ASTRO N modules. This unlocks a new chapter for CHINT Astronergy’s journey with its N-type modules.

Following the 355MW Walla Walla photovoltaic power plant project in Australia, this is the largest single N-type TOPCon order to date for CHINT Astronergy, and will also become its largest TOPCon project in Brazil.

The ASTRO N series modules are the latest products of CHINT Astronergy’s focus on the development trend of N-type TOPCon cell technology. Since their release in April 2022, customers from all over the world have been making inquiries, and the product has left footprints across the globe. The Vista Alegre photovoltaic project is located in the state of Minas Geras in southeastern Brazil, which has the most cities in Brazil and is also a state with high energy consumption.

Brazil, located near the equator, has an average annual sunshine duration of over 3,000 hours, and 80% of its territory is in tropical regions. The hot climate is highly compatible with the ASTRO N series photovoltaic modules supplied by CHINT Astronergy.

The ASTRO N series modules are based on N-type TOPCon cell technology, combining multiple technologies such as N-type large silicon wafers, high reliability packaging, super non-destructive laser cutting, multi-busbar + half-cell design, optimized frames + double-layer high-transparency glass, etc., with a module efficiency of up to 22%+.

In addition to higher efficiency and power, the ASTRO N series modules also have the characteristic of a lower temperature coefficient. Currently, the temperature coefficient of conventional PERC modules in the industry is -0.35%, while the temperature decay of ASTRO N is as low as -0.29%.

This means that for every degree increase in temperature, compared with conventional PERC modules, the power loss of ASTRO N decreases by 0.06%, which will bring higher power generation efficiency in high-temperature environments.

Atlas Renewable Energy is an important business partner of CHINT Astronergy in South America, and the cooperation between the two companies extends throughout the region. The Vista Alegre project is the tenth large-scale power station project that CHINT Astronergy has collaborated on with Atlas.

As a world-renowned renewable energy investment company, Atlas Renewable Energy is building numerous renewable energy projects worldwide, with an installed capacity of 2.3GW in operation and approximately 3.5GW in contracted projects under development, construction, and operation.

The Vista Alegre photovoltaic power plant project will help accelerate the renewable energy transition process in Minas Geras, Brazil and create an inclusive, resilient, and low-carbon energy system.

for-Brazil-Vista-Alegre-PV-Station-20240320-1
for-Brazil-Vista-Alegre-PV-Station-20240320-1
for Brazil Vista Alegre PV Station 20240320 1

CHINT 81MW SOL DO FUTURO

The successful bid for the n-type TOPCon project in Brazil is a new demonstration of CHINT Astronergy’s n-type TOPCon strength in the South American market, following its success in the Australian and European markets. 

Based on the accumulation of its TOPCon cell technology capabilities and its predictions for the future photovoltaic market, CHINT Astronergy will continue to increase its research and development and production capacity investments in TOPCon. This will enable the company to provide more efficient and environmentally-friendly products to support the realization of a low-carbon future worldwide.

The Latest
NOVEMBER 25, 2024 CHINT First Three Quarters Report of 2024

On the evening of October 30, 2024, we released the report of the first three quarters of 2024.

NOVEMBER 19, 2024 The Consulate General of Brazil in Shanghai & APEX Visited CHINT

The joint delegation of the Consulate General of Brazil in Shanghai and APEX visited CHINT for further cooperation and investment in Brazil and CHINT.

NOVEMBER 12, 2024 Interview with Ms. Lily Zhang, President of CHINT Global

Check out this exclusive interview with Ms. Lily Zhang, President of CHINT Global.

NOVEMBER 5, 2024 CHINT and Shanghai Baoye Reached Strategic Cooperation

CHINT Global and Shanghai Baoye signed a strategic cooperation agreement, and started a dialogue around the fields of electric power, new energy, housing construction and industry in the global region, exchanged cooperation opportunities in-depth, and explored a new prospect of sea business.

NOVEMBER 1, 2024 CHINT 2024 Q3 New Product Express

Explore CHINT’s latest innovations for Q3 2024! Our cutting-edge solutions are designed to bring enhanced functionality, safety, and efficiency to your projects, whether in energy, telecommunications, or industrial applications.

NOVEMBER 1, 2024 CHINT Industry Solution – Telecom & Data Center

Come and explore the latest chapter of CHINT’s Industry Solution Series! This time, we’re shining a light on CHINT’s solutions for Telecom & Data center.

OCTOBER 29, 2024 Global Unity for Green Energy Acceleration: China, Europe, Africa

On October 19, the 2nd China-Europe-Africa Green Energy Development Forum with the theme of “Collaborate on Green Energy and Join Hands to Address Global Climate Change”, was held in Wenzhou, Zhejiang Province, China.

OCTOBER 28, 2024 40th Anniversary: CHINT’s Innovation and Global Impact

2024 Ou River Summit opened in Wenzhou from October 18 to 19, under the theme of “Green Forward”.

OCTOBER 18, 2024 Green Forward: Ou River Summit 2024 Preview

From green low-carbon technology to digital industry applications, from new power systems to strategies for clean energy development, from innovation incubation to the establishment of entrepreneurial platforms, from the 40th anniversary of CHINT to the path of evergreen private enterprises, a rich array of topics and cutting-edge discussions await… The 2024 Ou River Summit will be held in Wenzhou, Zhejiang, on October 18-19.

OCTOBER 18, 2024 CHINT Electrics Passed SA8000 Certification

On September 20, 2024, Zhejiang CHINT Electrics Co., Ltd. (CHINT Electrics) successfully passed the Social Accountability 8000 (SA8000) certification.