Por favor, insira palavras-chave para pesquisar

Global |EN

Escolha seu país e idioma

Ásia-Pacífico

Austrália e Nova Zelândia
Índia
Indonésia
Coréia
Malásia
Filipinas
Cingapura
Cingapura (Luz do Sol)
Vietnã

Oriente Médio e África

CHINT-EGEMAC
Arábia Saudita
África do Sul
Emirados Árabes Unidos
CHINT AJLAN
Egypt
Kenya

Europa

França
Cazaquistão
Holanda
Itália
Espanha
Peru
Reino Unido

América do Norte

México

América latina

Brasil
Colômbia
Equador
Peru
Energia solar fotovoltaica e ESS residencial
Solução de energia solar residencial

Escolha seu país e idioma

Austrália e Nova Zelândia
Índia
Indonésia
Coréia
Malásia
Filipinas
Cingapura
Cingapura (Luz do Sol)
Vietnã
CHINT-EGEMAC
Arábia Saudita
África do Sul
Emirados Árabes Unidos
CHINT AJLAN
Egypt
Kenya
França
Cazaquistão
Holanda
Itália
Espanha
Peru
Reino Unido
México
Brasil
Colômbia
Equador
Peru

Por favor, insira palavras-chave para pesquisar

Seu termo de pesquisa contém palavras restritas. Por favor, use outras palavras.

The Lowest Altitude Hotel in the World Get Ready for the Opening

JAN 3, 2019

The lowest altitude hotel in the world Get ready for the opening!

 

Shanghai, Nov.15 - InterContinental Shanghai Wonderland held a press conference to announce its opening. The 88-metre-deep hotel, clinging to a cliff in a quarry, has been named one of the world's top 10 architectural wonders along with Dubai’s Burj AI Arab Hotel.

When Shimao Group who has successfully built landmarks in more than 10 cities all over the world decided to build a five-star hotel in the abandoned quarry of Sheshan Mountain in 2006, the world's lowest altitude hotel has attracted numerous people's attention and got a nickname, "deep chasm hotel".

 

Twelve years later, the deep chasm hotel which is has been widely anticipated still holds the veil to cover its face from the public. The opening date has already been changed many times; why is the construction taking so long? Well, because it is extremely difficult to build such type of hotel!

 

The complexity of the project, including the sophisticated details of the design drawing, the various difficulties faced during the construction process and the strict requirements of equipment has made a history in architecture. Now, after overcoming different obstacles and impediments, the hotel underground, Shanghai's new landmark has finally been unveiled.

 

In the process of construction, Shimao Group not only implemented the highest standard requirements, but has also carried out a very strict quality control of its partners. As the power distribution equipment supplier of the hotel, CHINT electric participated in the construction of this special building with a full set of low-voltage power distribution equipment. Located below the horizon, the environment of the hotel is very special, which means the requirement of the reliability and security of power distribution operation is very high. CHINT bears the burden of the electrical technology design, manufacturing and equipment installation. After adopting a multi-process special anticorrosive treatment in the process, CHINT has improved the anticorrosive performance of equipment by more than 50%. By means of many technical innovation design and simulation analysis, CHINT also optimized the structure of the equipment to ensure that the equipment has a level 9 seismic capacity.

 

At present, all the equipment in the hotel has been in operation smoothly and will provide power safety for tourists from all over the world.

 

CHINT is committed to providing the world with safe, reliable and stable electrical equipment and clean energy solutions. After more than 30 years of growth, CHINT has evolved from Asia's largest LV apparatus supplier to lead global electrical equipment as well as an integrated supplier with various fields of expertise ranging from power generation, storage, transmission, transformation, distribution to terminal consumption.

The Latest
DECEMBER 25, 2025 CHINT Enhances EV Charging Safety with Advanced Protection Solution in France

CHINT boosts EV charging safety in France with protection solutions, raising short-circuit capacity to 30kA while cutting costs.

DECEMBER 23, 2025 Did you know - CHINT MCBs Deliver Compact Design with Global-Scale Performance

CHINT MCBs combine design with globally certified performance, delivering reliable safety and consistent quality for residential, commercial, and industrial use.

DECEMBER 4, 2025 CHINT Repeats Honor: Listed on The Watchlist 2026 as ESG Champion

CHINT Group is named an ESG Champion at Bloomberg Green’s Watchlist 2026, highlighting its innovation, clean energy achievements, and leadership in China’s green transition.

DECEMBER 3, 2025 CHINT Empowers Global Channel Partners through Knowledge, Community, and Industry Growth

CHINT strengthens global channel partnerships with training, community programs, and industry events across 20+ countries, empowering professionals in energy and electrification.

NOVEMBER 28, 2025 CHINT Accelerates Delivery of 5000A Main Switchboard for Cambodia Manufacturing Facility

CHINT delivers a fully assembled 5000A MSB for a Cambodia facility in just 10 weeks, achieving fast-track procurement, rapid assembly, and zero-rework performance.

NOVEMBER 26, 2025 Did you know - People at CHINT

Discover how CHINT’s people drive innovation, build strong teams, and power sustainable energy solutions worldwide through passion, expertise, and collaboration.

NOVEMBER 26, 2025 Did you know - CHINT continues to strengthen trust through solid governance, and rising ESG performance

CHINT strengthens global trust with certified excellence, improved ESG performance, and strong governance powered by diverse, empowered teams worldwide.

NOVEMBER 26, 2025 Did you know - CHINT makes sustainability part of everything we do

CHINT drives a greener future with eco-friendly energy solutions, smart low-carbon factories, and empowered global teams advancing sustainability worldwide.

NOVEMBER 20, 2025 Global Graphene Trends and the Future of the Industry

Global Graphene Innovation 2025: Breakthrough Achievements, Industry Trends, and the Future of Large-Scale Applications Unveiled in Wenzhou

NOVEMBER 3, 2025 CHINT Delivers Critical Power Transformers for ARUBA's IT3 Data Center Expansion in Italy

CHINT powers Italy's ARUBA IT3 data center with 132/15 kV transformers. Ensuring resilient, stable power for critical cloud infrastructure.