Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore

Middle East & Africa

Kenya
Saudi Arabia
South Africa
United Arab Emirates

Europe

France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom

Latin America

Brazil
Colombia
Ecuador
Peru

North America

Canada
Mexico
United States

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Kenya
Saudi Arabia
South Africa
United Arab Emirates
France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom
Brazil
Colombia
Ecuador
Peru
Canada
Mexico
United States

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

Sunlight: Innovation Challenge at COVID-19 Pandemic

AUG 25, 2020

COVID-19 pandemic has created unprecedented challenges globally on many aspects. Food insecurity is real in Singapore. At the height of 'circuit breaker' measure (CBM), many fast track work need to be carried out for important infrastructure, such as Jurong Port to meet demand of storage of reefer container from overseas supply. SUNLIGHT Electrical, a CHINT company is humbled to provide switchboards to distribute electrical energy.

To be ready with the infrastructure, electrical switchboards to distribute energy within the new area in the port is vital and needed to be delivered and installed in the shortest time ever. SUNLIGHT, a bespoke name for switchboardswith 50 years' experience is able to provide many switchboards within the stipulated time.

Many countries are faced with lockdown, getting supplies with commitment to meet stringent delivery time was not easy; especially for raw material of copper and steel, assorted components such as circuit breakers.

Beyond engineering competence, SUNLIGHT is able to harness IT and logistic from reputable suppliers whom can meet the stringent requirement and reliability.

Besides man-hour saving at site, remote FAT allows complying to regulations of no travel to avoid risks of contracting potential virus. The learning allows for further innovation to develop PPVC and expended use of digital IT.

SUNLIGHT is humbled to be selected by established partner M/s Visionic Engineering for this urgent project and given the opportunity to work with innovation and strong collaboration.

Digital IT and PPVC were applied to ensure quality is not compromised on other necessity, mainly time element. Remote FAT connecting to SUNLIGHT Singapore, SUNLIGHT Vietnam, Consultant, Contractor, LEW, and Owner; using IT networks and gadgets allowed the FAT to be carried out on time. Purpose built frames, enable the modular switchboards to be pre-assembled and pre-fabricated as complete switchboards, eliminating the need of conventional site assembly work. Meeting this challenge during the height of high COVID-19 infection, would easily reduce 6 man-day for the Contractor.

The Latest
JUNE 4, 2026 Powering Innovation, Join the 3rd CHINT Cup Now

Apply for the 2026 CHINT Cup Youth Innovation Contest and compete in green development, smart electrical, and tech innovation tracks for global awards and incubation support.

JUNE 2, 2026 Powering Clean Energy in the Andes | CHINT Supports Renewable Project in Peru

CHINT supports ENGIE’s Intipampa Wind Power Station in Peru with a 75MVA 138kV power transformer, enabling reliable clean energy delivery in the Andes.

MAY 26, 2026 CHINT Electrics: 2025 Sustainability Report

Explore CHINT Electrics’ 2025 Sustainability Report, highlighting ESG strategy, carbon neutrality goals, green innovation, responsible governance, and global sustainable development progress.

MAY 25, 2026 CHINT Electrics Releases Its First Climate-Related Financial Information Disclosure Report, Delivering on Its "Dual Carbon" Commitments Through Reliable Action

CHINT Electrics released its first TCFD-aligned climate-related financial disclosure report, highlighting climate governance, risk management, carbon targets, and its commitment to sustainable development.

MAY 13, 2026 Empowering the Next Generation of AI Infrastructure with Unmatched Speed

Discover how NOARK Electric delivered a same-day quote and fast-tracked transformers and switchboards for a major AI data center project in North America.

MAY 6, 2026 CHINT Electrics Q1 Report of 2026 & Annual Report of 2025

CHINT Electrics Q1 2026 report highlights growth in smart electrics and green energy, advancing digital and zero-carbon solutions while expanding global markets.

MAY 6, 2026 CHINT Validates Industry-Leading 60Hz 800kvar Capacitor Unit and 145kV GIS for High-Demand Grid Applications

CHINT’s 60Hz 800kvar capacitor unit and 145kV GIS pass KEMA & C2-class tests, proving reliable performance, superior switching, and technical strength for high-demand global power grids.

APRIL 30, 2026 Powering Central Asia’s Green Future: CHINT Delivers MV Skid Solution for MASDAR Bukhara 250MW Solar PV Plant

CHINT delivers an integrated MV skid solution for the MASDAR Bukhara 250MW Solar PV Plant, supporting reliable solar-plus-storage power in Uzbekistan.

APRIL 27, 2026 165-ton Transformer Successfully Shipped: CHINT Sets a New Paradigm for Global Heavy-Duty Delivery

CHINT successfully shipped a 165-ton 400kV transformer to Spain using an innovative MAFI trailer and RoRo vessel solution, setting a new benchmark for safe, efficient global heavy-duty equipment delivery.

APRIL 13, 2026 CHINT Showcased Its Largest Presence at FEICON 2026 and Announces Local Assembly of Air Circuit Breaker in Brazil

CHINT showcased its largest FEICON 2026 presence in Brazil, unveiling new power solutions and announcing local Air Circuit Breaker assembly for faster supply.