Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam

Middle East & Africa

Saudi Arabia
South Africa
UAE
Egypt
Kenya

Europe

France
Kazakhstan
Netherlands
Italy
Spain
Turkey
United Kingdom

North America

Mexico
USA
Canada

Latin America

Brazil
Colombia
Ecuador
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam
Saudi Arabia
South Africa
UAE
Egypt
Kenya
France
Kazakhstan
Netherlands
Italy
Spain
Turkey
United Kingdom
Mexico
USA
Canada
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT Singapore Realized Cross-Border E-FAT

JUL 22, 2022

The pandemic has disrupted regular business in most of the world in the past two years. When customized equipment needs to be inspected by the customer before leaving the factory, traditionally an on-site factory acceptance test will be conducted. The delays in customer approval will inevitably affect the project completion progress for the end-user.

To respond to the customer’s needs, CHINT Singapore adopted the innovative Electronic-Factory Acceptance Test (E-FAT) to first verify equipment specifications and conduct customized tests that reflect customer usage scenarios. Through virtual connectivity with engineers on-site, customers can fully verify the status of the products and tests in real-time without flying to factories overseas, improving customers’ purchasing efficiency, and bringing them a positive buying experience.

And most recently, the CHINT Singapore HV team and customer participated in an E-FAT at the CHINT transformer production line. In order to ensure a real-time experience with the customer, we put up the detailed measurements from instruments, status, and video of the equipment in the testing environment on the near 360-degree LED screen, ensuring the entire E-FAT process is smooth and transparent.

In the E-FAT, customers were able to verify the performance and quality that were specified by observation of the parameters that were recorded on calibrated instruments. These checks ensured that the equipment purchased such as the oil-immersed transformers, dry-type transformers, and gas-insulated switchgear (GIS) will perform reliably and with minimal environmental footprint. The factory and the local team carried out the tests based on procedures and standards one after another and the owners were happy with the final results. 

In the post-epidemic era, the construction of new infrastructure is rapid with digitalization becoming a priority for enterprises to deliver high-quality solutions for a smarter world. With the new mode of E-FAT, CHINT Global will utilize it when needed to improve the efficiency and convenience of factory acceptance to empower the industry.

The Latest
MARCH 31, 2026 Off-Grid Solar Street Lighting — Soran–Khlefan Tunnel and Mountain Road Safety Upgrade

Discover how an off-grid solar street lighting project in the Soran–Khlefan tunnel and mountain roads of Iraq improved visibility, road safety, and mobility with more than 20 solar-powered lighting poles built for remote, harsh environments.

MARCH 30, 2026 Powering the Future of Rotterdam’s EV Hub

NOARK ACBs ensure safe, reliable low-voltage protection for Rotterdam’s heavy-duty EV charging hub, delivering stable performance in harsh port environments.

MARCH 26, 2026 Enhanced CHINT Customer Service Network: Available Now in Asia-Pacific Region

CHINT launches upgraded Asia-Pacific customer service network with end-to-end support, multilingual access, and expert technical service for efficient global operations.

MARCH 24, 2026 Be Yourself, Everyone is Boundless! A Look Back at International Women's Day from Headquarters

CHINT celebrated International Women’s Day with flowers, blind boxes, and heartfelt activities, reflecting its commitment to DEI and women’s empowerment globally.

MARCH 2, 2026 Embedding Sustainability into Long-Term Growth: CHINT Group’s Key ESG Achievements of 2025

CHINT Group advances its 2030 ESG strategy in 2025 with SBTi targets, green supply chain innovation, top ESG ratings, and scalable zero-carbon solutions.

MARCH 2, 2026 CHINT Group 2026 New Year Conference : Green & Intelligent Synergy

CHINT’s 2026 New Year Conference highlights Green & Intelligent Synergy, AI First strategy, and 185B RMB revenue, driving global growth and innovation.

MARCH 2, 2026 CHINT Successfully Delivers First EMS Project in Vietnam, Enabling Smart Energy Management at NTCT

CHINT delivers its first EMS project in Vietnam, upgrading NTCT with smart low-voltage distribution and digital energy management for scalable campus efficiency.

JANUARY 30, 2026 CHINT Secures SBTi Validation, Anchoring Global Climate Action in Science

CHINT earns SBTi validation, joining 10,000+ firms with science-based climate targets and advancing zero-carbon factories, green products, and PV+ solutions.

JANUARY 30, 2026 A Deep Dive into CHINT Green Energy Solutions White Paper 2025

Explore CHINT’s Green Energy Solutions White Paper 2025, highlighting decarbonization pathways, smart grids, energy storage, and zero-carbon solutions.

JANUARY 29, 2026 A Review of CHINT Brand Award Highlights in 2025: Green Innovation Drives Brand Value Growth

In 2025, CHINT earned top global brand and ESG honors, showcasing leadership in green innovation, digitalization, and sustainable energy solutions worldwide.