Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam

Middle East & Africa

Saudi Arabia
South Africa
UAE
Egypt
Kenya

Europe

France
Kazakhstan
Netherlands
Italy
Spain
Turkey
United Kingdom

North America

Mexico
USA
Canada

Latin America

Brazil
Colombia
Ecuador
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam
Saudi Arabia
South Africa
UAE
Egypt
Kenya
France
Kazakhstan
Netherlands
Italy
Spain
Turkey
United Kingdom
Mexico
USA
Canada
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

What Does An Advanced R&D Laboratory Look Like?

APR 28, 2024

What Does An Advanced RD Laboratory Look Like-20240428-1
What Does An Advanced RD Laboratory Look Like-20240428-1
What Does An Advanced RD Laboratory Look Like 20240428 1

Table of Contents

  1. A Look into a Modern R&D Laboratory
  2. Main Equipment of CHINT Process Engineering Center
  3. Key Areas of CHINT Process Engineering Center
  4. Main Competence of CHINT Process Engineering Center
  5. What Does An Advanced R&D Laboratory Look Like?

Extensive R&D is critical for the success of a business. The crux of any new product is conducive research and development of prototypes before heading toward mass production. This is why many manufacturers have dedicated R&D laboratories, which allow them to develop and test products. This article gives an in-depth look into CHINT Process Engineering Center as an advanced R&D laboratory.

A Look into a Modern R&D Laboratory

An advanced R&D laboratory typically provides state-of-the-art facilities for producing new and innovative products. CHINT Process Engineering Center is a prime example of what an advanced modern-day R&D laboratory should be. It is set up to:

Capture Industry Focus

CHINT Process Engineering Center is intended to become a focal point for the industry. This R&D laboratory serves as a platform for sharing knowledge, fostering collaboration, and driving innovation within the sector.

Gain Insight into Market Changes

The Process Engineering Center is set up to gain a deeper understanding of the market. By researching and developing existing products, CHINT can foresee and respond to market changes more effectively.

Offer Tailor-Made Solutions

CHINT Process Engineering Center provides tailored solutions to meet specific needs. It ensures that the solutions provided are highly relevant and can deliver tangible benefits to the clients.

Main Equipment of CHINT Process Engineering Center

In order to capture industry focus, gain market insights, and offer tailored solutions, CHINT Process Engineering Center is equipped with various advanced devices. The CNC machining center can quickly process and machine different materials into a myriad of shapes. CNC engraving machine is designed for special functional parts of low-voltage electrical appliances, such as PA46 plastic, POM, and PA66, with an accuracy of 0.02mm. The microengraving machine is designed to process double-layer circuit plates for electronic products. The processing of a complex circuit plate can be completed in approximately 3 hours. Other equipment includes the spring machine, laser cutting machine, turning-milling machine, etc.

Key Areas of CHINT Process Engineering Center

CHINT Process Engineering Center has segmented areas designed for different purposes:

Material Storage Area

At the heart of the center’s logistics and inventory management is the material storage area. Materials needed for the production process are stored in this area. The materials are organized and labeled. There are over 200 materials ready for use in prototyping at all times.

3D Printing Area

The 3D printing area houses state-of-the-art 3D printers capable of rendering layer-upon-layer manufacturing technologies that can shape different objects based on computerized digital models. They reduce the need for extensive mechanical processing parts or steps, delivering the required part with minimal processing time.

Office Area

The filter processing area is another key area for the processing of plates and the assembly of partial products. It largely contributes to precision processing. After the prototyping process, the prototype will be sent to the laboratory center immediately for further testing and verification.

Fitter Processing Area

The filter processing area is another key area for the processing of plates and the assembly of partial products. It largely contributes to precision processing. After the prototyping process, the prototype will be sent to the laboratory center immediately for further testing and verification.

Main Competence of CHINT Process Engineering Center

With advanced equipment and comprehensive functional areas, CHINT Process Engineering Center presents two main competencies:

Rapid Manufacturing

CHINT Process Engineering Center is capable of rapid manufacturing. A fresh technical solution can be sent to the center directly from the design department and transformed into the corresponding object quickly. Even for a new 300-component circuit breaker, it takes no more than one week to perfectly restore the design, create a highly precise first-generation product and put it into tests immediately.

Comprehensive Manufacturing Technologies

The Process Engineering Center covers advanced manufacturing technologies for low-voltage electrical appliances. Whether the structural verification and reliability testing in the initial stage or the customer prototype display in the later stage, CHINT not only makes sure it meets the existing high requirements in the market but also pursues excellence and constantly refreshes the best results achieved.

What Does An Advanced R&D Laboratory Look Like?

It can be easily concluded that an advanced R&D lab should have advanced equipment and comprehensive functional areas that make R&D viable. Manufacturers should have a clear understanding of why they set up an R&D laboratory and what their R&D laboratories are capable of. CHINT Process Engineering Center is a prime example of such practices. At CHINT, our manufacturing equipment, materials, technical teams, and processing areas all ensure that our final products are developed economically with meticulous craftsmanship. Visit our website to learn more about our R&D capabilities and innovative offerings.

The Latest
FEBRUARY 14, 2026 Designing with IEC 61439-Compliant Switchgear for Better LV Assembly Performance

Designing an IEC switchboard is necessary for every operation, whether industrial or commercial. Acquiring IEC 61439 design verification for MDBs is important.

FEBRUARY 13, 2026 How Smart Meters Help Optimize Building Energy Use

Great building energy management makes use of smart meters to gauge energy consumption. Learn why smart metering is a sign of good energy monitoring practice.

FEBRUARY 12, 2026 Selecting the Right Control Components for High-Inrush Loads

Learn how to choose the proper control components like MCCB, overload relay, and contactors used in high inrush load for motor protection.

FEBRUARY 3, 2026 Using SCADA Integration to Improve Power Quality

Learn how SCADA integration transforms power quality management in industrial facilities using intelligent controllers, metering systems, and remote monitoring.

FEBRUARY 2, 2026 How Integrated Power Systems Improve Reliability in Industrial Operations

Learn how integrated power systems with power transformers, MV switchgears, and MCCBs help industrial operations by improving reliability and reducing downtime.

DECEMBER 17, 2025 Understanding Power Losses: How Modern Switchgear Mitigates Inefficiency

Learn how power quality devices, LV switchgear, and shunt reactor solutions cut energy waste and improve electrical performance.

DECEMBER 15, 2025 Power Components for Solar and Storage Equipment

Discover the functions of the different specialized DC components and how these work together to protect, isolate, and measure solar and storage systems.

DECEMBER 12, 2025 Designing Turnkey Substations: From Specification to Commissioning

Learn how EPC teams use MV switchgear, HV switchgear, AIS, and HV MCCB to design efficient turnkey substations from spec to commissioning.

DECEMBER 10, 2025 Preventing Electrical Fires in Multi-Unit Buildings

Learn practical ways to improve electrical fire safety in multi-unit buildings with modern electrical safety devices and layered protection.

DECEMBER 8, 2025 Integrating Renewable Energy into Existing Grid Networks

Integrate renewables smoothly with modern power transformer solutions that stabilize voltage, support bidirectional flow, and strengthen grid reliability for clean energy growth.