Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN

Europe

France
Italy
Spain
Turkey
Kazakhstan
Netherlands
United Kingdom

North America

Mexico

Latin America

Brazil
Colombia
Ecuador
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
France
Italy
Spain
Turkey
Kazakhstan
Netherlands
United Kingdom
Mexico
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT Accelerated to Protecting the Heart of Mexican Wind Farm

MAR 13, 2023

the-Heart-of-Mexican-Wind-Farm-20230313
the-Heart-of-Mexican-Wind-Farm-20230313
the Heart of Mexican Wind Farm 20230313

Recently, there was news from CHINT Mexico: The 400kV replacement transformer supplied by CHINT to the Reynosa Wind Farm has been successfully running since it was installed and commissioned in November 2022. 

The Reynosa Wind Farm is one of the largest wind power projects in Mexico and Latin America, developed and constructed by Zuma Energia. It is located near the city of Reynosa in the state of Tamaulipas, Mexico, and has a total installed capacity of 424MW with 123 wind turbines and annual average utilization hours of over 4100 hours.

At the beginning of 2022, two 400kV transformers at the Reynosa Wind Farm malfunctioned, leading to a complete halt of the wind farm’s power generation. Besides facing significant losses due to the power outage each day, there was also a constant risk of widespread power outages.

CHINT was invited to conduct a survey and provide a solution to the problem. As we all know, the main transformer is the “heart” of the substation and is crucial for the safe and stable operation of the power grid. Its reliability is of utmost importance for the safe and stable operation of the substation.

Upon learning about the background of the project, CHINT Mexico immediately organized transformer engineers to conduct on-site inspections and establish a special team. After multiple rounds of consultations and discussions, CHINT prioritized customer interests and project timeline, and ultimately proposed a solution that involved both component repair and complete replacement of the transformer.

Under this plan, CHINT would first provide components for repair to restore the transformer’s power supply, saving power generation and reducing losses. Meanwhile, CHINT would also supply a brand new 400kV replacement transformer with a delivery period of 120 days, ensuring the long-term stable power generation needs of the customer.

the-Heart-of-Mexican-Wind -Farm-20230313-1
the-Heart-of-Mexican-Wind -Farm-20230313-1
the Heart of Mexican Wind Farm 20230313 1

Within 120 days, from design to production; within 56 days, the new transformer was transported from Shanghai to Mexico; and within more than 30 days, the replacement installation and commissioning were successfully completed. All of these achievements are a result of the tireless efforts and contributions of every CHINT employee.

CHINT has always insisted on “customer-centric” principles, continuously improving delivery standards, and winning high praise through action. With CHINT’s “acceleration,” we have made a new contribution to the Mexican power market.

the-Heart-of-Mexican-Wind-Farm-20230313-2
the-Heart-of-Mexican-Wind-Farm-20230313-2
the Heart of Mexican Wind Farm 20230313 2
The Latest
AUGUST 29, 2025 CHINT Colombia: The evolution of a commitment to the energy of the future

CHINT Colombia opens its Bogotá office to boost innovation, clean energy, and sustainable growth, driving the country’s energy transition.

AUGUST 22, 2025 Did you know?People at CHINT Highlights the Voices of Progress

Did you know? Behind every innovation and every connection are people who make it happen.

AUGUST 14, 2025 CHINT Lights Up the Caribbean with Smart Metering

CHINT’s Wi-SUN smart metering transforms a Caribbean island’s power grid, boosting efficiency, cutting losses, and enabling real-time remote control.

AUGUST 5, 2025 CHINT Appoint Legend as Master Distributor For Low Voltage Products in Australia and New Zealand

CHINT appoints Legend Corporation as master distributor of LV products in Australia & NZ, boosting access to quality electrical solutions via CABAC.

AUGUST 5, 2025 Boîtiers STA & NOARK: Powering Reliability Across Public and Private Sectors

Boîtiers STA partners with NOARK to deliver safe, high-performance power solutions for hospitals, parks, and public sectors across Canada.

AUGUST 5, 2025 Did you know - From Components to Integrated Systems

CHINT scales smart manufacturing globally—delivering high to low voltage solutions with localized production, digital innovation, and green factories.

JULY 24, 2025 Countdown Begins: CHINT Cool Season 2025 Launches August 1!

Join CHINT Cool Season 2025 (Aug 1–Oct 31): global promos, new tech, rewards & events for electricians, installers & builders. Don’t miss out!

JULY 21, 2025 CHINT Breaks South China Smart Tech Hub in Foshan

CHINT breaks ground on a $70M Smart Innovation Park in Foshan, China, driving green energy, smart grid tech, and next-gen manufacturing across South China.

JULY 21, 2025 CHINT Building the Power Backbone of Urban Transit in Malaysia

CHINT supports MRT Corp in Malaysia with scalable low-voltage solutions, ensuring reliable, future-ready power for over 100 urban rail stations.

JULY 21, 2025 Did You Know? CHINT Global Manufacturing

Explore CHINT’s global manufacturing network with 30+ smart factories in 10+ countries, driving agile, localized power solutions worldwide.