Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

Saudi Arabia
South Africa
UAE
Egypt
Kenya

Europe

France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico
USA
Canada

Latin America

Brazil
Colombia
Ecuador
Peru
Low-voltage
Instruments and Meters
EV Charging
Telecom & Data Center
Buildings
Products
Solutions
Project References
Corporate Reports
CHINT Global
CHINT's Insights
Careers
Locate Us
Contact Us
Call Us +65 6329 3110
Email Us sales.apac@chint.com
Privacy Policy
Online Services

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
Saudi Arabia
South Africa
UAE
Egypt
Kenya
France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom
Mexico
USA
Canada
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

Sunlight: Innovation Challenge at COVID-19 Pandemic

AUG 25, 2020

COVID-19 pandemic has created unprecedented challenges globally on many aspects. Food insecurity is real in Singapore. At the height of 'circuit breaker' measure (CBM), many fast track work need to be carried out for important infrastructure, such as Jurong Port to meet demand of storage of reefer container from overseas supply. SUNLIGHT Electrical, a CHINT company is humbled to provide switchboards to distribute electrical energy.

To be ready with the infrastructure, electrical switchboards to distribute energy within the new area in the port is vital and needed to be delivered and installed in the shortest time ever. SUNLIGHT, a bespoke name for switchboardswith 50 years' experience is able to provide many switchboards within the stipulated time.

Many countries are faced with lockdown, getting supplies with commitment to meet stringent delivery time was not easy; especially for raw material of copper and steel, assorted components such as circuit breakers.

Beyond engineering competence, SUNLIGHT is able to harness IT and logistic from reputable suppliers whom can meet the stringent requirement and reliability.

Besides man-hour saving at site, remote FAT allows complying to regulations of no travel to avoid risks of contracting potential virus. The learning allows for further innovation to develop PPVC and expended use of digital IT.

SUNLIGHT is humbled to be selected by established partner M/s Visionic Engineering for this urgent project and given the opportunity to work with innovation and strong collaboration.

Digital IT and PPVC were applied to ensure quality is not compromised on other necessity, mainly time element. Remote FAT connecting to SUNLIGHT Singapore, SUNLIGHT Vietnam, Consultant, Contractor, LEW, and Owner; using IT networks and gadgets allowed the FAT to be carried out on time. Purpose built frames, enable the modular switchboards to be pre-assembled and pre-fabricated as complete switchboards, eliminating the need of conventional site assembly work. Meeting this challenge during the height of high COVID-19 infection, would easily reduce 6 man-day for the Contractor.

The Latest
JULY 22, 2026 CHINT Global Journey: Highlights from Around the World

For decades, CHINT has been steadfastly building its global footprint, evolving from early international expansion into a truly global enterprise with end-to-end industrial capabilities. Today, our business reaches over 140 countries and regions, supported by more than 30 manufacturing bases and 4 global R&D centers worldwide. With over 70% local talent across our overseas teams, we have built robust industrial resilience through global delivery and localized service, empowering comprehensive power system implementations with our full value-chain capabilities. Join us as we journey through some of CHINT's most remarkable moments across the globe.

JULY 7, 2026 Meeting Europe's Evolving Grid Needs: CHINT Highlights Its Resilient and Future-Ready Solutions for the AI Era at Intersolar Europe 2026

Munich, Germany, June 23–25 – As Europe continues to accelerate its energy transition, the industry's focus is increasingly shifting beyond renewable generation capacity toward grid resilience, system flexibility, and infrastructure modernization.

JULY 3, 2026 Meeting Europe's Evolving Grid Needs: CHINT Highlights Its Resilient and Future-Ready Solutions for the AI Era at Intersolar Europe 2026

这是一个新闻组件模板,创建新的news请右上角create,或者复制此模板后move重新编辑配置

JULY 3, 2026 CHINT Electrics Releases Its First Climate-Related Financial Information Disclosure Report, Delivering on Its "Dual Carbon" Commitments Through Reliable Action

CHINT Electrics released its first TCFD-aligned climate-related financial disclosure report, highlighting climate governance, risk management, carbon targets, and its commitment to sustainable development.

JULY 3, 2026 CHINT and Alibaba Cloud Forge Strategic Partnership: Driving Dual Empowerment in the AI Computing Era and Co-Expanding Global Markets

这是一个新闻组件模板,创建新的news请右上角create,或者复制此模板后move重新编辑配置

JULY 3, 2026 Invisible Assurance: The Reliable Backbone of a Training Centre

这是一个新闻组件模板,创建新的news请右上角create,或者复制此模板后move重新编辑配置

JUNE 4, 2026 Powering Innovation, Join the 3rd CHINT Cup Now

Apply for the 2026 CHINT Cup Youth Innovation Contest and compete in green development, smart electrical, and tech innovation tracks for global awards and incubation support.

JUNE 2, 2026 Powering Clean Energy in the Andes | CHINT Supports Renewable Project in Peru

CHINT supports ENGIE’s Intipampa Wind Power Station in Peru with a 75MVA 138kV power transformer, enabling reliable clean energy delivery in the Andes.

MAY 26, 2026 CHINT Electrics: 2025 Sustainability Report

Explore CHINT Electrics’ 2025 Sustainability Report, highlighting ESG strategy, carbon neutrality goals, green innovation, responsible governance, and global sustainable development progress.

MAY 25, 2026 CHINT Electrics Releases Its First Climate-Related Financial Information Disclosure Report, Delivering on Its "Dual Carbon" Commitments Through Reliable Action

CHINT Electrics released its first TCFD-aligned climate-related financial disclosure report, highlighting climate governance, risk management, carbon targets, and its commitment to sustainable development.