Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

Saudi Arabia
South Africa
UAE
Egypt
Kenya

Europe

France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico
USA
Canada

Latin America

Brazil
Colombia
Ecuador
Peru
Low-voltage
Instruments and Meters
EV Charging
Telecom & Data Center
Buildings
Products
Solutions
Project References
Corporate Reports
CHINT Global
CHINT's Insights
Careers
Locate Us
Contact Us
Call Us +65 6329 3110
Email Us sales.apac@chint.com
Privacy Policy
Online Services

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
Saudi Arabia
South Africa
UAE
Egypt
Kenya
France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom
Mexico
USA
Canada
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT Protects the Electricity Usage in Kuwait

APR 9, 2021

In 2019, an electrical breakdown happened to the Alstom GIS that has been operating in Kuwait for 25 years, which directly caused the local Omariya substation to lose power and could not supply power normally. In February 2020, CHINT received an inquiry from NCC (National Contracting Co. LTD.), the EPC contractor of the project, and immediately established an Omariya project team to ensure the efficient operation of all parts. From the cooperative design of with Alsoom, product quotation, contract signing, raw material production, to the on-site installation and commissioning of 25 132kV GIS with double-spaced busbars, CHINT has overcome various inconveniences caused by the epidemic in a short period of 5 months and successfully sent power.

The journey of a thousand miles begins with a single step. The successful signing of CHINT’s contract was not accomplished overnight. As early as 2014, CHINT passed the pre-qualification of the Ministry of Water and Electricity (MEW) of Kuwait, and embarked on the road of competing with companies in Europe, America, Japan and South Korea. Since 2015, CHINT has successively served as Kuwait Petroleum Corporation and National Hydropower Corporation, and have provided equipment for dozens of substation engineering projects such as the Ministry of Housing and Welfare, and have supplied more than 300 bay GIS and multiple power transformers and put them into use, which further guarantees the local people’s life and industrial production power, quality and service reputation. 

In 2019, CHINT successfully won the Mutlaa substation EPC project of the Housing and Welfare Department and became the first Chinese private enterprise to enter the general contracting market of Kuwait substation engineering. Now, through continuous learning and exploration of the local power grid, CHINT has successfully implemented the Omariya project, which has once again added a lot of meanings to the Chinese company in the Kuwait power market.

During the implementation of the project, CHINT's professionalism and product maturity have been highly recognized by customers. The local authoritative magazine in Kuwait carried out a large-scale report on the smooth implementation and significance of the project, which greatly enhanced CHINT's local brand image and laid the foundation for further expansion of the power market in Kuwait and the Middle East in the future.

The Latest
MAY 13, 2026 Empowering the Next Generation of AI Infrastructure with Unmatched Speed

Discover how NOARK Electric delivered a same-day quote and fast-tracked transformers and switchboards for a major AI data center project in North America.

MAY 6, 2026 CHINT Electrics Q1 Report of 2026 & Annual Report of 2025

CHINT Electrics Q1 2026 report highlights growth in smart electrics and green energy, advancing digital and zero-carbon solutions while expanding global markets.

MAY 6, 2026 CHINT Validates Industry-Leading 60Hz 800kvar Capacitor Unit and 145kV GIS for High-Demand Grid Applications

CHINT’s 60Hz 800kvar capacitor unit and 145kV GIS pass KEMA & C2-class tests, proving reliable performance, superior switching, and technical strength for high-demand global power grids.

APRIL 30, 2026 Powering Central Asia’s Green Future: CHINT Delivers MV Skid Solution for MASDAR Bukhara 250MW Solar PV Plant

CHINT delivers an integrated MV skid solution for the MASDAR Bukhara 250MW Solar PV Plant, supporting reliable solar-plus-storage power in Uzbekistan.

APRIL 27, 2026 165-ton Transformer Successfully Shipped: CHINT Sets a New Paradigm for Global Heavy-Duty Delivery

CHINT successfully shipped a 165-ton 400kV transformer to Spain using an innovative MAFI trailer and RoRo vessel solution, setting a new benchmark for safe, efficient global heavy-duty equipment delivery.

APRIL 13, 2026 CHINT Showcased Its Largest Presence at FEICON 2026 and Announces Local Assembly of Air Circuit Breaker in Brazil

CHINT showcased its largest FEICON 2026 presence in Brazil, unveiling new power solutions and announcing local Air Circuit Breaker assembly for faster supply.

MARCH 31, 2026 Off-Grid Solar Street Lighting — Soran–Khlefan Tunnel and Mountain Road Safety Upgrade

Discover how an off-grid solar street lighting project in the Soran–Khlefan tunnel and mountain roads of Iraq improved visibility, road safety, and mobility with more than 20 solar-powered lighting poles built for remote, harsh environments.

MARCH 30, 2026 Powering the Future of Rotterdam’s EV Hub

NOARK ACBs ensure safe, reliable low-voltage protection for Rotterdam’s heavy-duty EV charging hub, delivering stable performance in harsh port environments.

MARCH 26, 2026 Enhanced CHINT Customer Service Network: Available Now in Asia-Pacific Region

CHINT launches upgraded Asia-Pacific customer service network with end-to-end support, multilingual access, and expert technical service for efficient global operations.

MARCH 24, 2026 Be Yourself, Everyone is Boundless! A Look Back at International Women's Day from Headquarters

CHINT celebrated International Women’s Day with flowers, blind boxes, and heartfelt activities, reflecting its commitment to DEI and women’s empowerment globally.