Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

Saudi Arabia
South Africa
UAE
Egypt
Kenya

Europe

France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico
USA
Canada

Latin America

Brazil
Colombia
Ecuador
Peru
Low-voltage
Instruments and Meters
EV Charging
Telecom & Data Center
Buildings
Products
Solutions
Project References
Corporate Reports
CHINT Global
CHINT's Insights
Careers
Locate Us
Contact Us
Call Us +65 6329 3110
Email Us sales.apac@chint.com
Privacy Policy
Online Services

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
Saudi Arabia
South Africa
UAE
Egypt
Kenya
France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom
Mexico
USA
Canada
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT Accelerated to Protecting the Heart of Mexican Wind Farm

MAR 13, 2023

the-Heart-of-Mexican-Wind-Farm-20230313
the-Heart-of-Mexican-Wind-Farm-20230313
the Heart of Mexican Wind Farm 20230313

Recently, there was news from CHINT Mexico: The 400kV replacement transformer supplied by CHINT to the Reynosa Wind Farm has been successfully running since it was installed and commissioned in November 2022. 

The Reynosa Wind Farm is one of the largest wind power projects in Mexico and Latin America, developed and constructed by Zuma Energia. It is located near the city of Reynosa in the state of Tamaulipas, Mexico, and has a total installed capacity of 424MW with 123 wind turbines and annual average utilization hours of over 4100 hours.

At the beginning of 2022, two 400kV transformers at the Reynosa Wind Farm malfunctioned, leading to a complete halt of the wind farm’s power generation. Besides facing significant losses due to the power outage each day, there was also a constant risk of widespread power outages.

CHINT was invited to conduct a survey and provide a solution to the problem. As we all know, the main transformer is the “heart” of the substation and is crucial for the safe and stable operation of the power grid. Its reliability is of utmost importance for the safe and stable operation of the substation.

Upon learning about the background of the project, CHINT Mexico immediately organized transformer engineers to conduct on-site inspections and establish a special team. After multiple rounds of consultations and discussions, CHINT prioritized customer interests and project timeline, and ultimately proposed a solution that involved both component repair and complete replacement of the transformer.

Under this plan, CHINT would first provide components for repair to restore the transformer’s power supply, saving power generation and reducing losses. Meanwhile, CHINT would also supply a brand new 400kV replacement transformer with a delivery period of 120 days, ensuring the long-term stable power generation needs of the customer.

the-Heart-of-Mexican-Wind -Farm-20230313-1
the-Heart-of-Mexican-Wind -Farm-20230313-1
the Heart of Mexican Wind Farm 20230313 1

Within 120 days, from design to production; within 56 days, the new transformer was transported from Shanghai to Mexico; and within more than 30 days, the replacement installation and commissioning were successfully completed. All of these achievements are a result of the tireless efforts and contributions of every CHINT employee.

CHINT has always insisted on “customer-centric” principles, continuously improving delivery standards, and winning high praise through action. With CHINT’s “acceleration,” we have made a new contribution to the Mexican power market.

the-Heart-of-Mexican-Wind-Farm-20230313-2
the-Heart-of-Mexican-Wind-Farm-20230313-2
the Heart of Mexican Wind Farm 20230313 2
The Latest
JULY 22, 2026 CHINT Global Journey: Highlights from Around the World

For decades, CHINT has been steadfastly building its global footprint, evolving from early international expansion into a truly global enterprise with end-to-end industrial capabilities. Today, our business reaches over 140 countries and regions, supported by more than 30 manufacturing bases and 4 global R&D centers worldwide. With over 70% local talent across our overseas teams, we have built robust industrial resilience through global delivery and localized service, empowering comprehensive power system implementations with our full value-chain capabilities. Join us as we journey through some of CHINT's most remarkable moments across the globe.

JULY 7, 2026 Meeting Europe's Evolving Grid Needs: CHINT Highlights Its Resilient and Future-Ready Solutions for the AI Era at Intersolar Europe 2026

Munich, Germany, June 23–25 – As Europe continues to accelerate its energy transition, the industry's focus is increasingly shifting beyond renewable generation capacity toward grid resilience, system flexibility, and infrastructure modernization.

JULY 3, 2026 Invisible Assurance: The Reliable Backbone of a Training Centre

这是一个新闻组件模板,创建新的news请右上角create,或者复制此模板后move重新编辑配置

JULY 3, 2026 CHINT and Alibaba Cloud Forge Strategic Partnership: Driving Dual Empowerment in the AI Computing Era and Co-Expanding Global Markets

这是一个新闻组件模板,创建新的news请右上角create,或者复制此模板后move重新编辑配置

JULY 3, 2026 Meeting Europe's Evolving Grid Needs: CHINT Highlights Its Resilient and Future-Ready Solutions for the AI Era at Intersolar Europe 2026

这是一个新闻组件模板,创建新的news请右上角create,或者复制此模板后move重新编辑配置

JULY 3, 2026 CHINT Electrics Releases Its First Climate-Related Financial Information Disclosure Report, Delivering on Its "Dual Carbon" Commitments Through Reliable Action

CHINT Electrics released its first TCFD-aligned climate-related financial disclosure report, highlighting climate governance, risk management, carbon targets, and its commitment to sustainable development.

JUNE 4, 2026 Powering Innovation, Join the 3rd CHINT Cup Now

Apply for the 2026 CHINT Cup Youth Innovation Contest and compete in green development, smart electrical, and tech innovation tracks for global awards and incubation support.

JUNE 2, 2026 Powering Clean Energy in the Andes | CHINT Supports Renewable Project in Peru

CHINT supports ENGIE’s Intipampa Wind Power Station in Peru with a 75MVA 138kV power transformer, enabling reliable clean energy delivery in the Andes.

MAY 26, 2026 CHINT Electrics: 2025 Sustainability Report

Explore CHINT Electrics’ 2025 Sustainability Report, highlighting ESG strategy, carbon neutrality goals, green innovation, responsible governance, and global sustainable development progress.

MAY 25, 2026 CHINT Electrics Releases Its First Climate-Related Financial Information Disclosure Report, Delivering on Its "Dual Carbon" Commitments Through Reliable Action

CHINT Electrics released its first TCFD-aligned climate-related financial disclosure report, highlighting climate governance, risk management, carbon targets, and its commitment to sustainable development.