Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

Saudi Arabia
South Africa
UAE
Egypt
Kenya

Europe

France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico
USA
Canada

Latin America

Brazil
Colombia
Ecuador
Peru
Low-voltage
Instruments and Meters
EV Charging
Telecom & Data Center
Buildings
Products
Solutions
Project References
Corporate Reports
CHINT Global
CHINT's Insights
Careers
Locate Us
Contact Us
Call Us +65 6329 3110
Email Us sales.apac@chint.com
Privacy Policy
Online Services

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
Saudi Arabia
South Africa
UAE
Egypt
Kenya
France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom
Mexico
USA
Canada
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT empowers power grid demonstration project in Vientiane

OCT 8, 2019

At the end of August, a delegation from Electricite du Laos (EDL) and Union Resources & Engineering Co., Ltd. (UREC) visited CHINT, warmly welcomed by Asia-Pacific team of CHINT overseas department.

Leaders of EDL & UREC highly praised CHINT for its outstanding performance in power grid modernization demonstration project in Vientiane, the capital of Laos. Since 2017, CHINT has cooperated with EDL & UREC for the first time to provide two power transformers for the 115kV power grid modernization project. This year, in the bidding of Dongphosy substation of 115kv power grid modernization project in Vientiane, CHINT won two power transformers and low-voltage cabinets / maintenance cabinets and other equipment projects by virtue of its cost-effective products and high-quality services. The overall scale of cooperation with customers was nearly 10 million RMB. At present, the equipment inspection of the project has been successfully completed.

Vientiane 115kV power grid modernization projects the key project of the Belt and Road, which will continue to build more than 22 substations for the city network to improve the quality of electricity consumption in Vientiane. In the next five years, Vientiane will continue to emerge new substation construction needs. CHINT will continue to provide high quality transmission and distribution products and solutions to our customers as an important EDL & UREC partner.

The Latest
JUNE 4, 2026 Powering Innovation, Join the 3rd CHINT Cup Now

Apply for the 2026 CHINT Cup Youth Innovation Contest and compete in green development, smart electrical, and tech innovation tracks for global awards and incubation support.

JUNE 2, 2026 Powering Clean Energy in the Andes | CHINT Supports Renewable Project in Peru

CHINT supports ENGIE’s Intipampa Wind Power Station in Peru with a 75MVA 138kV power transformer, enabling reliable clean energy delivery in the Andes.

MAY 26, 2026 CHINT Electrics: 2025 Sustainability Report

Explore CHINT Electrics’ 2025 Sustainability Report, highlighting ESG strategy, carbon neutrality goals, green innovation, responsible governance, and global sustainable development progress.

MAY 25, 2026 CHINT Electrics Releases Its First Climate-Related Financial Information Disclosure Report, Delivering on Its "Dual Carbon" Commitments Through Reliable Action

CHINT Electrics released its first TCFD-aligned climate-related financial disclosure report, highlighting climate governance, risk management, carbon targets, and its commitment to sustainable development.

MAY 13, 2026 Empowering the Next Generation of AI Infrastructure with Unmatched Speed

Discover how NOARK Electric delivered a same-day quote and fast-tracked transformers and switchboards for a major AI data center project in North America.

MAY 6, 2026 CHINT Electrics Q1 Report of 2026 & Annual Report of 2025

CHINT Electrics Q1 2026 report highlights growth in smart electrics and green energy, advancing digital and zero-carbon solutions while expanding global markets.

MAY 6, 2026 CHINT Validates Industry-Leading 60Hz 800kvar Capacitor Unit and 145kV GIS for High-Demand Grid Applications

CHINT’s 60Hz 800kvar capacitor unit and 145kV GIS pass KEMA & C2-class tests, proving reliable performance, superior switching, and technical strength for high-demand global power grids.

APRIL 30, 2026 Powering Central Asia’s Green Future: CHINT Delivers MV Skid Solution for MASDAR Bukhara 250MW Solar PV Plant

CHINT delivers an integrated MV skid solution for the MASDAR Bukhara 250MW Solar PV Plant, supporting reliable solar-plus-storage power in Uzbekistan.

APRIL 27, 2026 165-ton Transformer Successfully Shipped: CHINT Sets a New Paradigm for Global Heavy-Duty Delivery

CHINT successfully shipped a 165-ton 400kV transformer to Spain using an innovative MAFI trailer and RoRo vessel solution, setting a new benchmark for safe, efficient global heavy-duty equipment delivery.

APRIL 13, 2026 CHINT Showcased Its Largest Presence at FEICON 2026 and Announces Local Assembly of Air Circuit Breaker in Brazil

CHINT showcased its largest FEICON 2026 presence in Brazil, unveiling new power solutions and announcing local Air Circuit Breaker assembly for faster supply.