Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore

Middle East & Africa

Kenya
Saudi Arabia
South Africa
United Arab Emirates

Europe

France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom

Latin America

Brazil
Colombia
Ecuador
Peru

North America

Canada
Mexico
United States
Low-voltage
Power Transmission and Distribution
Low Voltage Switchgear and Software
Instruments and Meters
Telecom & Data Center
Buildings
Products
Solutions
Project References
Corporate Reports
CHINT Global
CHINT's Insights
Careers
Locate Us
Contact Us
Call Us +91 1202 9750 57
Email Us marketing@chint.co.in
Privacy Policy
Online Services

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Kenya
Saudi Arabia
South Africa
United Arab Emirates
France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom
Brazil
Colombia
Ecuador
Peru
Canada
Mexico
United States

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT Provides Trail Powering Solution in Egypt

SEP 19, 2022

On March 28, 2022, Egypt’s Ramadan 10th City Railway Project was successfully opened to traffic. This is Egypt’s first electrified railway with AC power supply system. According to the project cooperation agreement signed with China Railway-AVIC International Consortium in 2017, CHINT provides electrical products such as distribution boxes, distribution cabinets, and low-voltage cabinets for the project. 

The two phases of the Egypt Railway project add up to a total of 12 stations. CHINT provides corresponding supporting facilities for each station, requiring a total of more than 220 low-voltage power distribution cabinets, more than 150 medium-voltage power distribution cabinets, more than 800 low-voltage power distribution boxes, and over 900 meters of closed-insulated busbars.

Innovation is the key to CHINT’s success in winning the Egypt Railway Project. From project negotiation to formal implementation, from drawing conversion, and technical communication, to plan promotion, production and supply assurance, the CHINT team continues to innovate and provide customized power products and technical solutions for the project.

 It is also a brand-new exploration of CHINT to pass the Egyptian technical standards to the domestic team, and then the domestic team will carry out the next step of content deepening and product design, so as to customize the needs of customers in the rail transit technology system. The team responsible for the drawing work of CHINT has designed tens of thousands of drawings according to feedback and needs and made targeted adjustments and optimizations according to customers’ reading habits.

Under the leadership of the Project Joint Management Department, the CHINT Egypt team overcame cognitive differences and technical differences, completed the emergency delivery under the epidemic, and realized multi-party collaborative operations.

It takes 4 hours for the round trip from CHINT Egypt to the project consortium office, which is the daily commute for the CHINT Egypt team. When encountering poor communication, the team gave full play to the advantages of operating in the local area for many years, took the initiative to take up the work of communication and connection, and helped to promote the overall progress of the project.

The 24kV medium-voltage cabinet in the Egypt Railway project is not a standard and conventional cabinet type. The matching of CHINT product structure and components needs to be pre-adjusted in the factory. The time given by the customer is very urgent. Under normal circumstances, the complete cycle of 30 pieces is 45 days, and the time given by the customer is 20 to 30 days for 140 pieces.

Facing the challenge, CHINT rose to the challenge, actively deployed domestic resources to the production line in Egypt, and stayed in the factory with colleagues from AVIC International Customer Department and Business Department from morning to night to ensure that the products were delivered on time.

In the Egypt railway project, CHINT successfully completed a number of tests on technical analysis, emergency production, emergency delivery, and other capabilities of transnational projects, accumulated management experience in large and complex overseas projects, improved project execution capabilities, and prepared for the follow-up “Made in China” project in China. The rail transit field went to sea smoothly, laying a solid foundation.

The Latest
AUGUST 5, 2026 CHINT Electric Secures China's First ETL Certification for North American Medium-Voltage Switchgear

Recently, CHINT ELECTRIC's independently developed NG7-38(Z) Series Metal Enclosed Gas Insulated Switchgear has successfully passed rigorous testing by Intertek ETL, earning the prestigious ETL North American certification. As the first medium-voltage switchgear product in China to receive this certification, it marks another breakthrough for CHINT in high-end electrical equipment manufacturing and serves as a "golden pass" to the North American and global high-end markets.

AUGUST 5, 2026 CHINT in the Oil and Gas Industry: Circuit & Motor Protection for Select Electrical’s Switchgear/MCC in ‘unreal’ timelines!”

Since being established in 1988 in Alberta, Select Electrical Enterprises Ltd. (SEEL), a privately owned electrical, automation and controls company, has been providing the electrical community with efficient service, through locations in Mayerthorpe, Alberta, and Stony Plain, Alberta where they manufacture custom VFD and control packages. SEEL prides itself on providing professional, personal, precise and reliable service. A high standard of support is provided to their clients, during and after a job is completed and Select Electrical strives to exceed client’s expectations.

AUGUST 5, 2026 Sustainability Prism | The Diverse "Innovation Equation" Behind "2026 The Workplace for ALL"

On July 29, Bloomberg Green Greater China announced its 2026 "The Workplace for ALL" list, and following a rigorous verification and comprehensive evaluation process, CHINT was recognized for the third consecutive year. The selection process, guided by rigorous international standards, highlights companies that excel in social responsibility, employee development, and fostering a sustainable culture of diversity and inclusion, positioning them as global leaders in talent cultivation and sustainable growth.

JULY 22, 2026 CHINT Global Journey: Highlights from Around the World

For decades, CHINT has been steadfastly building its global footprint, evolving from early international expansion into a truly global enterprise with end-to-end industrial capabilities. Today, our business reaches over 140 countries and regions, supported by more than 30 manufacturing bases and 4 global R&D centers worldwide. With over 70% local talent across our overseas teams, we have built robust industrial resilience through global delivery and localized service, empowering comprehensive power system implementations with our full value-chain capabilities. Join us as we journey through some of CHINT's most remarkable moments across the globe.

JULY 7, 2026 Meeting Europe's Evolving Grid Needs: CHINT Highlights Its Resilient and Future-Ready Solutions for the AI Era at Intersolar Europe 2026

Munich, Germany, June 23–25 – As Europe continues to accelerate its energy transition, the industry's focus is increasingly shifting beyond renewable generation capacity toward grid resilience, system flexibility, and infrastructure modernization.

JULY 3, 2026 Meeting Europe's Evolving Grid Needs: CHINT Highlights Its Resilient and Future-Ready Solutions for the AI Era at Intersolar Europe 2026

这是一个新闻组件模板,创建新的news请右上角create,或者复制此模板后move重新编辑配置

JULY 3, 2026 CHINT Electrics Releases Its First Climate-Related Financial Information Disclosure Report, Delivering on Its "Dual Carbon" Commitments Through Reliable Action

CHINT Electrics released its first TCFD-aligned climate-related financial disclosure report, highlighting climate governance, risk management, carbon targets, and its commitment to sustainable development.

JULY 3, 2026 CHINT and Alibaba Cloud Forge Strategic Partnership: Driving Dual Empowerment in the AI Computing Era and Co-Expanding Global Markets

这是一个新闻组件模板,创建新的news请右上角create,或者复制此模板后move重新编辑配置

JULY 3, 2026 Invisible Assurance: The Reliable Backbone of a Training Centre

这是一个新闻组件模板,创建新的news请右上角create,或者复制此模板后move重新编辑配置

JUNE 4, 2026 Powering Innovation, Join the 3rd CHINT Cup Now

Apply for the 2026 CHINT Cup Youth Innovation Contest and compete in green development, smart electrical, and tech innovation tracks for global awards and incubation support.