Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore

Middle East & Africa

Kenya
Saudi Arabia
South Africa
United Arab Emirates

Europe

France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom

Latin America

Brazil
Colombia
Ecuador
Peru

North America

Canada
Mexico
United States

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Kenya
Saudi Arabia
South Africa
United Arab Emirates
France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom
Brazil
Colombia
Ecuador
Peru
Canada
Mexico
United States

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

Trace Course – Protections and Discrimination Study on elec calc

OCT 2, 2022

elec calcTM is a software package that enables the calculation of low voltage and high voltage electrical installations produced by Trace Software International (TSI), a France company established in 1987.

It has the special functions of single-line diagram model design, automatic sizing, power and load calculation, power protection option, manufacturer database, document output, and printing, etc., providing accurate electrical system calculation and analysis solutions for domestic and foreign power bureau, power engineering companies, power design institutes, panel factories, as well as industrial users such as construction and ships.

Cascading and selective protection are important in electrical systems. Cascade design can both meet the parameter requirements and reduce the design cost. When conducting electrical system design elec calcTM, users can set the component parameters to generate and save the curves, select the short-circuit points in the system, and generate the system cascading selective protection report based on the short circuit simulation calculation.

It is the fifth tutorial of the Trace Course and going to show you how to realize electrical protections and generate discrimination study.

  • 01 Protection setting
  • 02 Parameter adjustments with curve tool
  • 03 Discrimination Study
  • 04 Complete circuit analysis
  • 05 Saving the curve for editing
  • 06 Discrimination study with short-circuit simulation
  • 07 Edition of discrimination curves
The Latest
APRIL 13, 2026 CHINT Showcased Its Largest Presence at FEICON 2026 and Announces Local Assembly of Air Circuit Breaker in Brazil

CHINT showcased its largest FEICON 2026 presence in Brazil, unveiling new power solutions and announcing local Air Circuit Breaker assembly for faster supply.

MARCH 31, 2026 Off-Grid Solar Street Lighting — Soran–Khlefan Tunnel and Mountain Road Safety Upgrade

Discover how an off-grid solar street lighting project in the Soran–Khlefan tunnel and mountain roads of Iraq improved visibility, road safety, and mobility with more than 20 solar-powered lighting poles built for remote, harsh environments.

MARCH 30, 2026 Powering the Future of Rotterdam’s EV Hub

NOARK ACBs ensure safe, reliable low-voltage protection for Rotterdam’s heavy-duty EV charging hub, delivering stable performance in harsh port environments.

MARCH 26, 2026 Enhanced CHINT Customer Service Network: Available Now in Asia-Pacific Region

CHINT launches upgraded Asia-Pacific customer service network with end-to-end support, multilingual access, and expert technical service for efficient global operations.

MARCH 24, 2026 Be Yourself, Everyone is Boundless! A Look Back at International Women's Day from Headquarters

CHINT celebrated International Women’s Day with flowers, blind boxes, and heartfelt activities, reflecting its commitment to DEI and women’s empowerment globally.

MARCH 2, 2026 CHINT Successfully Delivers First EMS Project in Vietnam, Enabling Smart Energy Management at NTCT

CHINT delivers its first EMS project in Vietnam, upgrading NTCT with smart low-voltage distribution and digital energy management for scalable campus efficiency.

MARCH 2, 2026 Embedding Sustainability into Long-Term Growth: CHINT Group’s Key ESG Achievements of 2025

CHINT Group advances its 2030 ESG strategy in 2025 with SBTi targets, green supply chain innovation, top ESG ratings, and scalable zero-carbon solutions.

MARCH 2, 2026 CHINT Group 2026 New Year Conference : Green & Intelligent Synergy

CHINT’s 2026 New Year Conference highlights Green & Intelligent Synergy, AI First strategy, and 185B RMB revenue, driving global growth and innovation.

JANUARY 30, 2026 CHINT Secures SBTi Validation, Anchoring Global Climate Action in Science

CHINT earns SBTi validation, joining 10,000+ firms with science-based climate targets and advancing zero-carbon factories, green products, and PV+ solutions.

JANUARY 30, 2026 A Deep Dive into CHINT Green Energy Solutions White Paper 2025

Explore CHINT’s Green Energy Solutions White Paper 2025, highlighting decarbonization pathways, smart grids, energy storage, and zero-carbon solutions.