Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam

Middle East & Africa

Saudi Arabia
South Africa
UAE
Egypt
Kenya

Europe

France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico
USA
Canada

Latin America

Brazil
Colombia
Ecuador
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam
Saudi Arabia
South Africa
UAE
Egypt
Kenya
France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom
Mexico
USA
Canada
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

Trace Course – Interface Brief of Electrical Software elec calc

APR 29, 2022

elec calcTM is a software package that enables the calculation of low voltage and high voltage electrical installations produced by TraceSoftware International (TSI), a France company established in 1987. It has the special functions of one line diagram model design, automatic sizing, power and load calculation, power protection option, manufacturer database, document output and printing, etc., providing accurate electrical system calculation and analysis solutions for domestic and foreign power bureau, power engineering companies, power design institutes, panel factories, as well as industrial users such as construction and ships.

It is the second tutorial of the Trace Course and the interface of the software will be introduced in detail.

The screenshot below shows the main sections of the software interface:

           1.Quick access bar

           2.Ribbon

           3.Drawing area

           4.Library

           5.Data area

1. Quick Access bar

It includes commands “New project”, “Open project”, “Save”, “Undo”, “Redo”.

2. Ribbon

It includes ribbons “EC” “Home” “Configuration” “BIM” and “Support”. “EC” ribbon opens the user interfaces From “Home” ribbon, main and generic actions can be done, relative to project design.

3. Drawing area

In this area, one-line diagram is created.

4. Library

It includes all saved standard schematics, available for all projects, without being specific to the current project.

5. Data area

This section shows all data of components inserted in drawing areas, as well as the results of the performed calculations. When activating the data entering view, the data area will have the following appearance:

The Latest
MARCH 2, 2026 Embedding Sustainability into Long-Term Growth: CHINT Group’s Key ESG Achievements of 2025

CHINT Group advances its 2030 ESG strategy in 2025 with SBTi targets, green supply chain innovation, top ESG ratings, and scalable zero-carbon solutions.

MARCH 2, 2026 CHINT Group 2026 New Year Conference : Green & Intelligent Synergy

CHINT’s 2026 New Year Conference highlights Green & Intelligent Synergy, AI First strategy, and 185B RMB revenue, driving global growth and innovation.

MARCH 2, 2026 Smart Low-voltage Distribution Project at Nha Trang College of Technology (NTCT)

CHINT delivers its first EMS project in Vietnam, upgrading NTCT with smart low-voltage distribution and digital energy management for scalable campus efficiency.

DECEMBER 25, 2025 CHINT Enhances EV Charging Safety with Advanced Protection Solution in France

CHINT boosts EV charging safety in France with protection solutions, raising short-circuit capacity to 30kA while cutting costs.

DECEMBER 23, 2025 Did you know - CHINT MCBs Deliver Compact Design with Global-Scale Performance

CHINT MCBs combine compact design with globally certified performance, delivering reliable safety and consistent quality for residential, commercial, and industrial use.

DECEMBER 4, 2025 CHINT Repeats Honor: Listed on The Watchlist 2026 as ESG Champion

CHINT Group is named an ESG Champion at Bloomberg Green’s Watchlist 2026, highlighting its innovation, clean energy achievements, and leadership in China’s green transition.

MARCH 28, 2025 CHINT Hosted Al Arabiya Business Partner Summit 2025

The mobile substation is equipped with mobile capabilities. It becomes a flexible and reliable solution that can provide immediate, mobile power support for high, medium, and low-voltage applications.

MARCH 27, 2025 CHINT Green Hour² global challenge highlight: Creativity Meets Sustainability

The mobile substation is equipped with mobile capabilities. It becomes a flexible and reliable solution that can provide immediate, mobile power support for high, medium, and low-voltage applications.