Por favor, introduzca palabras clave para buscar

Global |EN

Elige tu país e idioma

Asia Pacífico

Australia y Nueva Zelanda
India
Indonesia
Corea
Malasia
Filipinas
Singapur
Singapur (luz del sol)
Vietnam

Oriente Medio y África

CHINT-EGEMAC
Arabia Saudita
Sudáfrica
Emiratos Árabes Unidos
CHINT AJLAN

Europa

España
Francia
Kazajstán
Italia
Netherlands
Pavo
Reino Unido

América del norte

México

América Latina

Brasil
Colombia
Ecuador
Perú
Baja tensión
Aparatos de conmutación de baja tensión y software
Carga de vehículos eléctricos
Telecomunicaciones y Data centers
Edificios
Centro de servicio
Contáctenos
Llámanos +57 (601) 712-5419
Envíenos un correo electrónico infoco@chintglobal.com
Acerca de CHINT
Centro de noticias
Carreras

Elige tu país e idioma

Australia y Nueva Zelanda
India
Indonesia
Corea
Malasia
Filipinas
Singapur
Singapur (luz del sol)
Vietnam
CHINT-EGEMAC
Arabia Saudita
Sudáfrica
Emiratos Árabes Unidos
CHINT AJLAN
España
Francia
Kazajstán
Italia
Netherlands
Pavo
Reino Unido
México
Brasil
Colombia
Ecuador
Perú

Por favor, introduzca palabras clave para buscar

Su término de búsqueda contiene palabras clave restringidas. Utilice otras palabras clave.

CHINT Helps to Build a World-class Hydro-solar Hybrid PV Station

AUG 5, 2022

Recently, CHINT Solar won the bid for the first phase of the 523.1MW Yalong hydro-solar Hybrid project. The project will be the first million-kilowatt photovoltaic power station in Sichuan and the largest hydro-solar hybrid power station in the world. More than 900,000 ASTRO 5 double-sided double-glass modules (182) will be sent to Sichuan, capture the splendor of light on the vast plateau and convert it into clean energy power to help the China’s west-to-east power transmission strategy.

The hydro-solar power station is located as high as 4,000 to 4,600 meters above sea level, with an extreme lowest temperature of -30.6°C and a maximum snow depth of 24 cm. The high-altitude and cold environment place more stringent requirements on the reliability and environmental adaptability of photovoltaic modules. 

The winning ASTRO 5 double-sided double-glass module (182) was sent to PVEL, an authoritative third-party laboratory, for strict reliability testing. Hundreds of thermal cycle experiments and wet freezing experiments were performed in an extreme temperature environment of 85 °C, and the excellent low attenuation rate of less than 2% was still maintained, and the “Top Performer” test result was obtained.

The clean energy resources in the Yalong River Basin are uniquely endowed by nature, and it is a unique and rare high-quality super-large and complementary basin clean and renewable energy base in China. After the completion of the water-light complementation project between the two estuaries of the Yalong River, it will become the world’s highest-altitude water-solar complementation integration demonstration project.

Lo último
JULY 14, 2025 CHINT Q2 2025 Product Highlights

Discover CHINT’s Q2 2025 innovations—9 new low-voltage solutions designed for safety, reliability, and global performance in power distribution.

JUNE 27, 2025 CHINT Shines at the AEF 2025, Shaping the Future of Energy

CHINT highlights cutting-edge power solutions at the Africa Energy Forum 2025, supporting Africa’s sustainable energy transformation through innovation and localization.

JUNE 26, 2025 Did you know CHINT?Global Reach, Local Impact

Discover how CHINT delivers tailored electrical solutions across 140+ countries, solving local infrastructure challenges with innovative, smart technology.

JUNE 24, 2025 Empowering Thailand’s Food Industry with Reliable Power Solutions

Discover how CHINT provided Prawit Farm with reliable low-voltage power distribution solutions, ensuring continuous and efficient operations for their new food processing factory in Thailand.

JUNE 18, 2025 Building a New Energy Ecosystem, CHINT Appeared at SNEC 2025

Discover CHINT’s smart microgrids, green tech innovations, and ESG strategy as they reshape the global energy landscape at SNEC 2025.

JUNE 17, 2025 Join the challenge! The 2025 CHINT Cup Global Youth Innovation Contest is now open!

Enter the CHINT Cup 2025 for a chance to showcase cutting-edge innovations in AI, energy, and technology. Global youth welcome. Attractive prizes await.

JUNE 15, 2025 CHINT Wraps Up SENDI 2025 Showcasing New Local Meter Factory

At SENDI 2025, CHINT unveiled its Manaus smart-meter plant, boosting Brazil’s grid with sustainable tech and 350+ new jobs.

JUNE 8, 2025 NOARK Electric has a new address in Czech Republic

NOARK Electric has relocated to Harfa Office Park in Prague 9. Learn about their expansion, new showroom, and upgraded workspace.

MAY 29, 2025 Building Smarter, Greener Data Centers Worldwide

Discover how CHINT is leading the way in constructing eco-friendly, high-efficiency data centers in the Philippines, Indonesia, and China with innovative, low-carbon solutions.

MAY 29, 2025 Beibei Zheng, Vice President of CHINT Global: Empower Europe's energy transformation and build a zero-carbon future

CHINT Global VP Beibei Zheng discusses full-lifecycle low-carbon solutions, smart grid innovations, and ESG commitments to support Europe's sustainable energy goals.