Por favor, introduzca palabras clave para buscar

Global |EN

Elige tu país e idioma

Asia Pacífico

Australia y Nueva Zelanda
India
Indonesia
Corea
Malasia
Filipinas
Singapur
Singapur (luz del sol)
Vietnam

Oriente Medio y África

CHINT-EGEMAC
Arabia Saudita
Sudáfrica
Emiratos Árabes Unidos
CHINT AJLAN

Europa

España
Francia
Kazajstán
Italia
Netherlands
Pavo
Reino Unido

América del norte

México

América Latina

Brasil
Colombia
Ecuador
Perú
Baja tensión
Aparatos de conmutación de baja tensión y software
Carga de vehículos eléctricos
Telecomunicaciones y Data centers
Edificios
Centro de servicio
Contáctenos
Llámanos +57 (601) 712-5419
Envíenos un correo electrónico infoco@chintglobal.com
Acerca de CHINT
Centro de noticias
Carreras

Elige tu país e idioma

Australia y Nueva Zelanda
India
Indonesia
Corea
Malasia
Filipinas
Singapur
Singapur (luz del sol)
Vietnam
CHINT-EGEMAC
Arabia Saudita
Sudáfrica
Emiratos Árabes Unidos
CHINT AJLAN
España
Francia
Kazajstán
Italia
Netherlands
Pavo
Reino Unido
México
Brasil
Colombia
Ecuador
Perú

Por favor, introduzca palabras clave para buscar

Su término de búsqueda contiene palabras clave restringidas. Utilice otras palabras clave.

CHINT Helps Build Huaneng UK 99.8MW Minety Project

DEC 29, 2021

On December 15, CHINT was invited to attend the online commencement ceremony of battery energy storage project of British Stonehill (Minety phase II) developed by China Huaneng Group Co., Ltd.

Previously, CHINT provided a complete set of transformer products for phase I Minety project, which won the trust and recognition of Huaneng Group with high-quality products and professional services.

After the completion of Minety battery energy storage project, it will mainly participate in peak shaving and frequency modulation, fast frequency response, black start, capacity market and other services in the UK power market, which will help improve the UK Power Grid’s ability to accept renewable energy, effectively improve the resilience of the local power grid to cope with peak and valley shocks, improve the operation safety and stability of the power system, create jobs and contribute taxes for the local power market, bringing good social and economic benefits.

The designed installed capacity of Stonehill project is 49.9 MW and the energy storage capacity is 99.8 MW. During this cooperation, CHINT products will play an important role in transformer guarantee in Minety phase II battery energy storage project and jointly help the rapid layout and development of Huaneng battery energy storage project in the UK.

As a demonstration project of cooperation between China and the UK in the field of new energy, Stonehill project was listed as one of the 18 projects supporting green and low-carbon development in the UK at the UK Global Investment Summit, which will provide important support for the stable operation of West London power grid and help the UK achieve the goal of “2050 net zero emission”. British Prime Minister Boris Johnson said that these projects are the beginning of the establishment of a new partnership for green growth in Britain.

Lo último
JULY 14, 2025 CHINT Q2 2025 Product Highlights

Discover CHINT’s Q2 2025 innovations—9 new low-voltage solutions designed for safety, reliability, and global performance in power distribution.

JUNE 27, 2025 CHINT Shines at the AEF 2025, Shaping the Future of Energy

CHINT highlights cutting-edge power solutions at the Africa Energy Forum 2025, supporting Africa’s sustainable energy transformation through innovation and localization.

JUNE 26, 2025 Did you know CHINT?Global Reach, Local Impact

Discover how CHINT delivers tailored electrical solutions across 140+ countries, solving local infrastructure challenges with innovative, smart technology.

JUNE 24, 2025 Empowering Thailand’s Food Industry with Reliable Power Solutions

Discover how CHINT provided Prawit Farm with reliable low-voltage power distribution solutions, ensuring continuous and efficient operations for their new food processing factory in Thailand.

JUNE 18, 2025 Building a New Energy Ecosystem, CHINT Appeared at SNEC 2025

Discover CHINT’s smart microgrids, green tech innovations, and ESG strategy as they reshape the global energy landscape at SNEC 2025.

JUNE 17, 2025 Join the challenge! The 2025 CHINT Cup Global Youth Innovation Contest is now open!

Enter the CHINT Cup 2025 for a chance to showcase cutting-edge innovations in AI, energy, and technology. Global youth welcome. Attractive prizes await.

JUNE 15, 2025 CHINT Wraps Up SENDI 2025 Showcasing New Local Meter Factory

At SENDI 2025, CHINT unveiled its Manaus smart-meter plant, boosting Brazil’s grid with sustainable tech and 350+ new jobs.

JUNE 8, 2025 NOARK Electric has a new address in Czech Republic

NOARK Electric has relocated to Harfa Office Park in Prague 9. Learn about their expansion, new showroom, and upgraded workspace.

MAY 29, 2025 Building Smarter, Greener Data Centers Worldwide

Discover how CHINT is leading the way in constructing eco-friendly, high-efficiency data centers in the Philippines, Indonesia, and China with innovative, low-carbon solutions.

MAY 29, 2025 Beibei Zheng, Vice President of CHINT Global: Empower Europe's energy transformation and build a zero-carbon future

CHINT Global VP Beibei Zheng discusses full-lifecycle low-carbon solutions, smart grid innovations, and ESG commitments to support Europe's sustainable energy goals.