Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacífico

Australia y Nueva Zelanda
India
Indonesia
Corea
Malasia
Filipinas
Singapur
Singapur (luz del sol)
Vietnam

Oriente Medio y África

CHINT-EGEMAC
Arabia Saudita
Sudáfrica
Emiratos Árabes Unidos
CHINT AJLAN

Europa

España
Francia
Kazajstán
Italia
Netherlands
Pavo
Reino Unido

América del norte

México

América Latina

Brasil
Colombia
Ecuador
Perú
Baja tensión
Aparatos de conmutación de baja tensión y software
Carga de vehículos eléctricos
Telecomunicaciones y Data centers
Edificios
Centro de servicio
Contáctenos
Llámanos +57 (601) 712-5419
Envíenos un correo electrónico infoco@chintglobal.com
Acerca de CHINT
Centro de noticias
Carreras

Choose your country & Language

Australia y Nueva Zelanda
India
Indonesia
Corea
Malasia
Filipinas
Singapur
Singapur (luz del sol)
Vietnam
CHINT-EGEMAC
Arabia Saudita
Sudáfrica
Emiratos Árabes Unidos
CHINT AJLAN
España
Francia
Kazajstán
Italia
Netherlands
Pavo
Reino Unido
México
Brasil
Colombia
Ecuador
Perú

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

How to Install NWK1-G Reactive Power Compensation Controller

FEB 18, 2025

Install NWK1-G Reactive Power Compensation Controller
Install NWK1-G Reactive Power Compensation Controller
Install NWK1-G Reactive Power Compensation Controller

Table of Contents

  1. Preparations for Installing NWK1-G
  2. Installation Steps
  3. How to Test the NWK1-G
  4. Troubleshooting
  5. Conclusion

What is reactive power compensation? It is the process of managing and adjusting reactive power within an electrical system by using power electronic devices like capacitors. The NWK1-G Reactive Power Compensation Controller is designed to adjust the capacity of these capacitors. It helps improve the power factor and ensures efficient energy use.

This guide explores the precise installation steps of NWK1-G. The objective is to help you set up the controller with confidence and technical precision.

Preparations for Installing NWK1-G

Follow these guidelines to prepare for the installation:

1. Safety Precautions

Disconnect the main power supply before beginning. It eliminates the risk of electrical shock. It hence ensures a safe working environment.

Wear insulating gloves and protective glasses. These will shield you from potential electrical hazards. They are your first line of defense during the installation process.

2. Tools and Materials

Gather the right tools and materials for a successful compensation controller installation. The essential tools include:

  • Wire strippers
  • Crimping pliers
  • Electric screwdriver
  • Multimeter
  • Measuring tape
  • Drill

The required materials include:

  • 1.5mm² wires for voltage and control output
  • 2.5mm² wires for current sampling
  • Wire lugs
  • Mounting accessories
NWK1-G Reactive Power Compensation Controller
NWK1-G Reactive Power Compensation Controller
NWK1-G Reactive Power Compensation Controller

Installation Steps

Follow these guidelines for installation:

1. Pre-Installation Checks

Read the instruction manual to understand the controller’s specifications and installation requirements. This step ensures you have comprehensive knowledge before beginning.

Then, confirm that the controller parameters match the specific working conditions of your electrical system.

2. Controller Mounting

Drill a precise 113x113mm hole in the cabinet. Ensure clean and accurate cutting. The location should provide easy access and proper ventilation.

Align the controller carefully and use the provided fastening accessories to secure it firmly. Make sure that the mounting is level and stable.

3. Wiring Procedure

Strip wires to 11-13mm and attach wire lugs using crimping pliers. Ensure clean, precise connections.

Accurate wiring is critical for the NWK1-G Reactive Power Compensation Controller’s optimal performance. Refer to these:

  • COM Terminal: Common terminal for internal relay operations, facilitating standardized signal routing.
  • J1-J10 Terminals: Dedicated control output connections for precise capacitor bank switching and reactive power compensation.
  • Fan and Alarm Terminals: Connect external monitoring components like cooling systems and warning notifications.
  • Wire Identification: Distinguish control and sampling wires carefully. Control and output wires should be 1.5mm². Current sampling wires should be 2.5mm²

How to Test the NWK1-G

After installation, comprehensive testing validates the NWK1-G Reactive Power Compensation Controller’s performance. The key tests include:

1. Power-On Test

This test confirms the controller’s basic operational capabilities and reactive power compensation performance.

Monitor power factor changes after powering on. Observe smooth transitions and automatic reactive power compensation based on system load.

Verify that the power factor reaches the set operational value. Confirm the system stabilizes within the expected performance range.

2. Voltage and Current Verification

Check voltage and current measurements against expected values to confirm stability.

Troubleshooting

Even with careful installation, unexpected issues can arise with the NWK1-G Reactive Power Compensation Controller. Refer to this table to identify the cause of common issues and how to solve them:

Symptom

Cause Analysis

Solution

Black Screen/No Display

Auxiliary power supply AC220V±20% is not connected

Measure voltage between power supply terminals, and ensure AC220V connection

The controller is faulty

Replace the controller if voltage measurements are not AC220V

COS Show “----” Constantly

(1)Sample <20mA blocking current with the display “----”

Sample <20mA blocking current with blocking activated

(2)Current transformer or controller is faulty

(1)Check load conditions, verify CT ratio is appropriate

(2)Check CT short-circuit bridge or open wiring

(3)Measure la phase sampling end

Activate some capacitors manually,

but the COSф value on the controller does not change

(1) The phase sequence or polarity of the sampled voltage Ubc and

current la is

wrong, and the voltage and current are connected across phases

(2) On-site compensation cabinets and auxiliary cabinets are used

(3) COSф shows negative value, such as: -0.87L

Wiring error or in power generation state

(1) Connect the wires correctly according to the wiring requirements

in 5.2

(2) Before debugging, disconnect the auxiliary cabinets first

(3) Activate capacitors manually, and compare the changes of the

COS

value and the reactive power value to determine the wiring

(4) Restart the controller power to automatically recognize the phase

again

*Check the full table for a more comprehensive troubleshooting guide

Conclusion

Installing the NWK1-G Reactive Power Compensation Controller requires precision and technical understanding. At CHINT, we provide comprehensive support to ensure successful implementation. Get in touch and explore our complete range of power solutions and innovative technologies.

Lo último
MAY 6, 2025 NGC5 Diseñado para la excelencia, fabricado para la fiabilidad

NGC5 Original Manufactured LV Switchgear es el nuevo tipo de montaje de prueba elaborado por CHINT. Establece un nuevo punto de referencia para la fiabilidad y la eficiencia.

APRIL 22, 2025 Cómo protege el magnetotérmico NM8N-HV las salidas de CA de los sistemas solares

El disyuntor de caja moldeada NM8N-HV proporciona una protección esencial para las salidas de CA en sistemas de energía solar contra cortocircuitos y sobrecargas.

APRIL 15, 2025 What is a New Energy Air Switch Disconnector: Facts You Need to Know

Discover how the new energy air switch disconnector (solar disconnector switch) plays a crucial role in ensuring safety and reliability in utility-scale solar and battery energy storage systems (BESS).

APRIL 2, 2025 Experience Smooth Motor Starting with CHINT’s NJRP5-D Soft Starter

This article focuses on CHINT’s NJRP5-D Soft Starter and explores its functionality and advantages.

MARCH 26, 2025 Celda de media tensión GIS RMU CHINT 36/40,5kV: Nuevas aplicaciones energéticas con soluciones innovadoras

La celda de media tensión RMU CHINT no sólo resuelve los retos técnicos y medioambientales, sino que también mejora la eficacia operativa y la rentabilidad de los clientes.

MARCH 21, 2025 Single Phase vs Three Phase Voltage Regulator

This article explains the differences between single phase voltage regulators and three phase voltage regulators.

MARCH 18, 2025 Miniature Circuit Breaker: Understanding UL 489 and UL 1077

This article specifies the key differences between UL 489 and UL 1077, helping choose suitable Miniature Circuit Breakers.

MARCH 17, 2025 IEC frente a UL: Comprender las normas de certificación de disyuntores de aire

Compare la certificación IEC frente a la UL para disyuntores de aire: normas regionales, cumplimiento de las normas de seguridad y soluciones con certificación mundial de CHINT para una protección eléctrica fiable.

MARCH 5, 2025 Guide to Air Circuit Breaker Maintenance

This guide discovers essential inspection, cleaning, and testing procedures of the air circuit breaker to prevent failures and extend equipment lifespan.

FEBRUARY 26, 2025 The Basics of NVF2L Compact Micro Drive

NVF2L Compact Micro Drive is designed to meet the growing demand for efficient, space-saving solutions in various industrial applications. Explore CHINT's industrial drive technology solutions.