Por favor, introduzca palabras clave para buscar

Global |EN

Elige tu país e idioma

Asia Pacífico

Australia y Nueva Zelanda
India
Indonesia
Corea
Malasia
Filipinas
Singapur
Singapur (luz del sol)
Vietnam

Oriente Medio y África

CHINT-EGEMAC
Arabia Saudita
Sudáfrica
Emiratos Árabes Unidos
CHINT AJLAN

Europa

España
Francia
Kazajstán
Italia
Netherlands
Pavo
Reino Unido

América del norte

México

América Latina

Brasil
Colombia
Ecuador
Perú
Baja tensión
Aparatos de conmutación de baja tensión y software
Carga de vehículos eléctricos
Telecomunicaciones y Data centers
Edificios
Centro de servicio
Contáctenos
Llámanos +57 (601) 712-5419
Envíenos un correo electrónico infoco@chintglobal.com
Acerca de CHINT
Centro de noticias
Carreras

Elige tu país e idioma

Australia y Nueva Zelanda
India
Indonesia
Corea
Malasia
Filipinas
Singapur
Singapur (luz del sol)
Vietnam
CHINT-EGEMAC
Arabia Saudita
Sudáfrica
Emiratos Árabes Unidos
CHINT AJLAN
España
Francia
Kazajstán
Italia
Netherlands
Pavo
Reino Unido
México
Brasil
Colombia
Ecuador
Perú

Por favor, introduzca palabras clave para buscar

Su término de búsqueda contiene palabras clave restringidas. Utilice otras palabras clave.

How to Install JKF8-12 Intelligent LV Reactive Power Auto Compensation Controller

JAN 14, 2025

JKF8-12 Compensation Controller
JKF8-12 Compensation Controller
JKF8-12 Compensation Controller

Table of Contents

  1. Necessary Tools for the Installation
  2. Installation Steps
  3. Observe Whether the Product is Working Normally
  4. Conclusion

The JKF8-12 is an intelligent low-voltage reactive power auto compensation controller. This sophisticated device helps improve power quality and reduce energy losses. It enhances overall electrical network efficiency. This article provides a comprehensive installation guide. It aims to help you safely install this device and troubleshoot it to ensure optimal performance and reliability.

Necessary Tools for the Installation

Installing the JKF8-12 compensation controller requires careful preparation and the right equipment. The essential tools include:

  • Insulated Gloves: They protect against electrical hazards and ensure personal safety.
  • Wire Strippers: These precisely remove insulation from electrical wires.
  • Wire Crimping Pliers: They securely attach wire noses and ensure reliable connections.
  • Wires of Appropriate Specifications: The goal is to match LV controller requirements for proper functionality.
  • Wire Noses: These facilitate clean and secure wire connections.
  • Screwdrivers (electric, hand): These enable precise screw tightening and terminal connections.
  • Multimeter: It helps to verify electrical connections and diagnose potential issues.

Installation Steps

Follow these guidelines for a successful installation of the JKF8-12 compensation controller:

1. Pre-Installation Check

Before starting, thoroughly review the specifications and compatibility of the LV controller with your existing electrical infrastructure. Verify that all system parameters align with the JKF8-12’s requirements.

2. Controller Mounting

Select an appropriate location within the electrical cabinet. Make sure there’s sufficient ventilation and protection from environmental factors. The mounting area should have a size of 113x113mm and provide easy access for future maintenance. The ambient temperatures should be between -10°C to +55°C. Relative humidity should not exceed 90% to prevent potential performance degradation.

3. Fastening the Controller

Use the provided mounting accessories to securely attach the controller. Ensure stable positioning using the designated mounting holes and fastening screws. Apply gentle torque to mounting screws to prevent over-tightening while maintaining secure attachment. Rotate the screw on the accessory clockwise.

4. Wiring Identification

Carefully identify and map out all necessary wire connections. Double-check each LV controller connection point to prevent potential errors during the installation process. Utilize the controller’s standard color-coding system for ease of wiring setup.

5. Wire Preparation

Strip wire ends with precision. Make sure that the copper length is appropriately exposed. The exposed copper wires should be 1.5mm² for voltage and control outputs and 2.5mm² for current sampling. Then, use wire crimping pliers to attach wire noses.

6. Connection of Ports and Terminals

Connect specific ports and terminals of the compensation controller according to the detailed wiring diagram. Pay close attention to voltage, control outputs, and current sampling requirements of compensating controls. Ensure connections to ports 1-12 for respective capacitor bank switching contactors. Also, ensure proper mapping of com, US2, and US1 to power supplies L1, L2, and L3 respectively.

7. Tightening

Finally, use a hand screwdriver to securely tighten all wire connections of the compensation controller. Tighten the wires until the screws reach the end.

Observe Whether the Product is Working Normally

After completing the installation, it’s critical to verify the operational status of the compensation controller. Carefully observe the system’s performance and monitor its initial functioning.

Should you encounter any issues, our comprehensive troubleshooting guide offers solutions to common problems. The following are a couple of common troubleshooting scenarios and suggestion solutions:

1. Undercurrent Status Display

Symptom: Controller consistently displays an undercurrent status "≡1.

Potential causes

Troubleshooting methods and precautions

The sampling current may be less than 150mA or the secondary circuit of the current transformer may be open

Check the sampling transformer and its secondary circuits for potential openings

Potential fault in sampling transformer or controller

If IS1 and IS2 sampling currents exceed 200mA, consider replacing the compensation controller

2. Frequent Capacitor Switching

Symptom: Rapid and excessive capacitor bank switching.

Potential causes

Troubleshooting methods and precautions

Rapid load current fluctuations and inappropriately low delay time settings (less than 10s)

Increase delay time to a minimum of 30 seconds

Low target power factor

Adjust target power factor to more appropriate levels

Low reactive power threshold

Raise reactive power switching threshold

 

For a more direct look into the installation process and troubleshooting guide of the JKF8-12 Compensation Controller, check out our YouTube video:

Conclusion

Installing the JKF8-12 Intelligent LV Reactive Power Auto Compensation Controller requires precision and careful execution. By following these detailed steps, you’ll ensure optimal performance and reliability. At CHINT, we are committed to providing top-tier technological solutions. Our expert technical support team offers services to assist you throughout the installation process.

Lo último
MAY 6, 2025 NGC5 Diseñado para la excelencia, fabricado para la fiabilidad

NGC5 Original Manufactured LV Switchgear es el nuevo tipo de montaje de prueba elaborado por CHINT. Establece un nuevo punto de referencia para la fiabilidad y la eficiencia.

APRIL 22, 2025 Cómo protege el magnetotérmico NM8N-HV las salidas de CA de los sistemas solares

El disyuntor de caja moldeada NM8N-HV proporciona una protección esencial para las salidas de CA en sistemas de energía solar contra cortocircuitos y sobrecargas.

APRIL 15, 2025 What is a New Energy Air Switch Disconnector: Facts You Need to Know

Discover how the new energy air switch disconnector (solar disconnector switch) plays a crucial role in ensuring safety and reliability in utility-scale solar and battery energy storage systems (BESS).

APRIL 2, 2025 Experience Smooth Motor Starting with CHINT’s NJRP5-D Soft Starter

This article focuses on CHINT’s NJRP5-D Soft Starter and explores its functionality and advantages.

MARCH 26, 2025 Celda de media tensión GIS RMU CHINT 36/40,5kV: Nuevas aplicaciones energéticas con soluciones innovadoras

La celda de media tensión RMU CHINT no sólo resuelve los retos técnicos y medioambientales, sino que también mejora la eficacia operativa y la rentabilidad de los clientes.

MARCH 21, 2025 Single Phase vs Three Phase Voltage Regulator

This article explains the differences between single phase voltage regulators and three phase voltage regulators.

MARCH 18, 2025 Miniature Circuit Breaker: Understanding UL 489 and UL 1077

This article specifies the key differences between UL 489 and UL 1077, helping choose suitable Miniature Circuit Breakers.

MARCH 17, 2025 IEC frente a UL: Comprender las normas de certificación de disyuntores de aire

Compare la certificación IEC frente a la UL para disyuntores de aire: normas regionales, cumplimiento de las normas de seguridad y soluciones con certificación mundial de CHINT para una protección eléctrica fiable.

MARCH 5, 2025 Guide to Air Circuit Breaker Maintenance

This guide discovers essential inspection, cleaning, and testing procedures of the air circuit breaker to prevent failures and extend equipment lifespan.

FEBRUARY 26, 2025 The Basics of NVF2L Compact Micro Drive

NVF2L Compact Micro Drive is designed to meet the growing demand for efficient, space-saving solutions in various industrial applications. Explore CHINT's industrial drive technology solutions.