Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacífico

Australia y Nueva Zelanda
India
Indonesia
Corea
Malasia
Filipinas
Singapur
Singapur (luz del sol)
Vietnam

Oriente Medio y África

CHINT-EGEMAC
Arabia Saudita
Sudáfrica
Emiratos Árabes Unidos
CHINT AJLAN

Europa

España
Francia
Kazajstán
Italia
Netherlands
Pavo
Reino Unido

América del norte

México

América Latina

Brasil
Colombia
Ecuador
Perú
Baja tensión
Aparatos de conmutación de baja tensión y software
Carga de vehículos eléctricos
Telecomunicaciones y Data centers
Edificios
Centro de servicio
Contáctenos
Llámanos +57 (601) 712-5419
Envíenos un correo electrónico infoco@chintglobal.com
Acerca de CHINT
Centro de noticias
Carreras

Choose your country & Language

Australia y Nueva Zelanda
India
Indonesia
Corea
Malasia
Filipinas
Singapur
Singapur (luz del sol)
Vietnam
CHINT-EGEMAC
Arabia Saudita
Sudáfrica
Emiratos Árabes Unidos
CHINT AJLAN
España
Francia
Kazajstán
Italia
Netherlands
Pavo
Reino Unido
México
Brasil
Colombia
Ecuador
Perú

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

How to Install CJ19 Capacitor Contactor

FEB 11, 2025

Install CJ19 Capacitor Contactor
Install CJ19 Capacitor Contactor
Install CJ19 Capacitor Contactor

Table of Contents

  1. Preparation
  2. Installation Steps
  3. Wiring and Testing
  4. Fault Diagnosis and Troubleshooting
  5. Conclusion

The CJ19 Capacitor Contactor is a critical component in electrical systems. It’s designed for capacitor switching. They help optimize power factor and improve electrical system efficiency. This contactor type is typically used in industrial and commercial settings. It ensures smooth power distribution and energy conservation.

Proper installation of the CJ19 helps ensure optimal performance and safety. It’s recommended to carefully follow each installation step and adhere to all manufacturer guidelines.

Preparation

Installing a CJ19 Capacitor Contactor requires careful planning. Follow these preparation steps to ensure a safe, successful contactor installation:

1. Safety Measures

Disconnect the power supply before starting the installation of this contactor type. Switch the main circuit breaker off to eliminate any potential electrical current.

Wear insulated gloves and protective goggles. These protective equipment items can shield you from potential electrical arcs, short circuits, and accidental contact with live components.

2. Tool Preparation

Gathering the right tools beforehand streamlines the capacitor contactor installation process. The required tools include:

  • Wire crimping pliers
  • Wire stripping pliers
  • Appropriately sized wires and terminals
  • Screwdrivers (manual hexagon and flat-head)
  • Multimeter
  • Insulated gloves
  • Safety goggles

3. Initial Checks

Before installing this specific contactor type, conduct thorough preliminary assessments to guarantee compatibility and proper placement.

Verify that the CJ19 Capacitor Contactor’s specifications align perfectly with your system’s electrical requirements, voltage ratings, and current load.

Additionally, choose an installation site that complies with the required operating conditions. For example, the ambient temperature should be -5℃ ~+40℃ and the average during 24 hours should not exceed +35℃. Also, consider the altitude, pollution degree, etc.

Installation Steps

This section provides detailed guidance for the physical CJ19 contactor type installation. Make sure to follow all these steps in order:

1. Physical Installation

Align the bottom of the capacitor contactor with the DIN rail’s edge. Apply firm, even pressure or use mounting screws to secure the device.

If removal is required, use a flat-head screwdriver to release the DIN rail stopper. Carefully detach the device by tilting it forward at a slight angle to prevent damage.

2. Wire Preparation

Choose wire sizes that match the contactor’s rated current. For the CJ19-95 model, use copper wires with cross-sectional areas between 1-25 mm². Always refer to the specific product specifications.

Then, strip the wire insulation carefully. Here are the key recommendations:

  • Primary Circuits: Remove 15mm of insulation.
  • Secondary Circuits: Strip 9-11mm of insulation.

Make sure the stripping is clean and precise to facilitate secure connections.

3. Terminal Connections

Connect terminals systematically. Follow these guidelines for primary circuit connections:

  • 1/L1, 3/L2, 5/L3: Connect to upstream circuit breaker.
  • 2/T1, 4/T2, 6/T3: Connect to capacitor contactor bank.

Follow the specified configuration (normally open or normally closed). Connect the A1 and A2 terminals to the capacitor controller.

Wiring and Testing

This critical phase ensures the contactor’s proper integration and operational reliability.

1. Connection Guidelines

Tighten terminals to precise torque values:

  • Primary Circuit: 10 N.m.
  • Control Circuit: 0.8 N.m.

Use a calibrated torque screwdriver for the best accuracy during contactor installation.

Double-check all contactor wiring connections. Make sure to secure terminal attachments. There shouldn’t be any exposed wire segments. Ensure proper alignment of connections as well.

2. Preliminary Testing

Power the coil with rated control voltage. The goal is to verify smooth mechanical operation and that there are no unusual sounds or resistance. The electrical response of contactor wiring should be consistent, too.

Don’t forget to use a multimeter to confirm primary circuit continuity. Check for any unexpected resistance and validate electrical pathway integrity.

Fault Diagnosis and Troubleshooting

During electrical installations, various issues can potentially arise with the CJ19 Capacitor Contactor. Common issues and their respective troubleshooting steps include:

Symptom

Potential Causes

Troubleshooting Steps

No Action or Unreliable Action

Control power supply voltage mismatch with coil voltage

Use a control power supply matching the exact coil voltage

Insufficient power supply capacity or disconnected or incorrect wiring

Comprehensively check and correct all wiring connections

Burned-out coil or jammed mechanical moving parts

Replace the coil and remove foreign matter blocking movement. If unresolved, replace the entire product

Product Noise

Foreign objects on yoke and armature pole surfaces

Carefully clean core pole surfaces

Control power supply voltage too low

Ensure control voltage matches specified coil voltage

No Release or Slow Release

Contact meltdown

Replace the entire product

Oil or dust on core pole surface

Thoroughly clean core pole surface

 

Conclusion

Installing a CJ19 Capacitor Contactor requires precision and respect for electrical safety protocols. Following proper guidelines and operational best practices is crucial. At CHINT, we welcome consultation if you encounter uncertainties during installation. For additional assistance, feel free to get in touch with local support contacts.

Lo último
MAY 6, 2025 NGC5 Diseñado para la excelencia, fabricado para la fiabilidad

NGC5 Original Manufactured LV Switchgear es el nuevo tipo de montaje de prueba elaborado por CHINT. Establece un nuevo punto de referencia para la fiabilidad y la eficiencia.

APRIL 22, 2025 Cómo protege el magnetotérmico NM8N-HV las salidas de CA de los sistemas solares

El disyuntor de caja moldeada NM8N-HV proporciona una protección esencial para las salidas de CA en sistemas de energía solar contra cortocircuitos y sobrecargas.

APRIL 15, 2025 What is a New Energy Air Switch Disconnector: Facts You Need to Know

Discover how the new energy air switch disconnector (solar disconnector switch) plays a crucial role in ensuring safety and reliability in utility-scale solar and battery energy storage systems (BESS).

APRIL 2, 2025 Experience Smooth Motor Starting with CHINT’s NJRP5-D Soft Starter

This article focuses on CHINT’s NJRP5-D Soft Starter and explores its functionality and advantages.

MARCH 26, 2025 Celda de media tensión GIS RMU CHINT 36/40,5kV: Nuevas aplicaciones energéticas con soluciones innovadoras

La celda de media tensión RMU CHINT no sólo resuelve los retos técnicos y medioambientales, sino que también mejora la eficacia operativa y la rentabilidad de los clientes.

MARCH 21, 2025 Single Phase vs Three Phase Voltage Regulator

This article explains the differences between single phase voltage regulators and three phase voltage regulators.

MARCH 18, 2025 Miniature Circuit Breaker: Understanding UL 489 and UL 1077

This article specifies the key differences between UL 489 and UL 1077, helping choose suitable Miniature Circuit Breakers.

MARCH 17, 2025 IEC frente a UL: Comprender las normas de certificación de disyuntores de aire

Compare la certificación IEC frente a la UL para disyuntores de aire: normas regionales, cumplimiento de las normas de seguridad y soluciones con certificación mundial de CHINT para una protección eléctrica fiable.

MARCH 5, 2025 Guide to Air Circuit Breaker Maintenance

This guide discovers essential inspection, cleaning, and testing procedures of the air circuit breaker to prevent failures and extend equipment lifespan.

FEBRUARY 26, 2025 The Basics of NVF2L Compact Micro Drive

NVF2L Compact Micro Drive is designed to meet the growing demand for efficient, space-saving solutions in various industrial applications. Explore CHINT's industrial drive technology solutions.