Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam

Middle East & Africa

Saudi Arabia
South Africa
UAE
CHINT AJLAN
Egypt
Kenya

Europe

France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico
USA
Canada

Latin America

Brazil
Colombia
Ecuador
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam
Saudi Arabia
South Africa
UAE
CHINT AJLAN
Egypt
Kenya
France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom
Mexico
USA
Canada
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

165-ton Transformer Successfully Shipped: CHINT Sets a New Paradigm for Global Heavy-Duty Delivery

27 APR 2026

Delivering a 165-ton transformer is not just about transportation—it’s about redefining reliability, efficiency, and scalability in global project execution.

 

 

Recently, a 165-ton ultra-large transformer was successfully loaded and shipped via RoRo operations at Haitong Terminal, Shanghai Nangang Port, marking its official departure to a project site in Spain. The unit, rated at 400kV and 220MVA, represents a typical out-of-gauge cargo, placing extremely high demands on both manufacturing excellence and international logistics capabilities. This milestone not only demonstrates successful project delivery, but also marks a new breakthrough for CHINT in the global delivery of ultra-heavy electrical equipment.

chint 165-ton transformer secured on mafi trailer inside roro vessel
chint 165-ton transformer secured on mafi trailer inside roro vessel
chint-165-ton-transformer-roro-vessel-lashing
chint transformer moved by mafi trailer for roro shipping at port
chint transformer moved by mafi trailer for roro shipping at port
chint-transformer-mafi-trailer-roro-port-shipping
chint 165-ton transformer transported by heavy-duty truck at port terminal
chint 165-ton transformer transported by heavy-duty truck at port terminal
chint-165-ton-transformer-port-transport-heavy-duty-delivery

Industry Challenge: How to Deliver Oversized Equipment Safely and Efficiently?

Traditionally, ultra-heavy and oversized cargo has been transported by heavy-lift vessels. However, recent geopolitical shifts have highlighted several limitations:

  • Surging export demand has tightened vessel availability, leading to scheduling constraints and reduced reliability
  • Loading and lifting operations are high-risk and require precise planning, with strict environmental conditions
  • Multi-port calls often result in longer transit times and higher port-related costs

In high-standard, time-sensitive international projects, customers are no longer asking only “Can it be delivered?”—but rather, “Can it be delivered safely, efficiently, and with certainty?”

 

 

Innovative Solution: A Safer and More Efficient RoRo Model

To meet project requirements, CHINT, together with its partners, introduced an innovative MAFI trailer + RoRo (Roll-on/Roll-off) vessel solution for this 165-ton oversized transformer, enabling efficient transportation of ultra-heavy equipment.

This approach delivers three key advantages:

Safer

By replacing high-risk lifting operations with roll-on handling, structural stress and impact on the equipment are significantly reduced.

More Efficient

Optimized loading and unloading processes shorten the overall delivery cycle by approximately 20 days compared with conventional solutions.

More Controllable

Marine-grade lashing combined with end-to-end monitoring ensures full traceability and verifiable transport conditions throughout the journey.

The successful implementation of this solution validates the feasibility of RoRo transportation for 165-ton class transformers, setting an important benchmark for the industry.

chint transformer moved onto roro vessel ramp for heavy-duty shipping
chint transformer moved onto roro vessel ramp for heavy-duty shipping
chint-transformer-roro-vessel-ramp-loading
chint 165-ton transformer loaded into roro vessel by terminal tractor
chint 165-ton transformer loaded into roro vessel by terminal tractor
chint-165-ton-transformer-roro-vessel-loading
chint 165-ton transformer transported on mafi trailer inside roro vessel
chint 165-ton transformer transported on mafi trailer inside roro vessel
chint-165-ton-transformer-mafi-trailer-inside-roro-vessel

Beyond a Single Delivery: Building a Replicable Capability

This is not just a one-off innovation, but a scalable and replicable delivery model:

  • Applicable to even heavier equipment (150-ton class and above)
  • Capable of further cost optimization through scaled application

As use cases continue to expand, this model is expected to deliver increasingly competitive solutions in cost, efficiency, and reliability.

 

 

Delivering Greater Reliability for Global Customers

Backed by deep integration across manufacturing, engineering, and global logistics resources, CHINT continues to strengthen its global delivery capabilities for ultra-heavy equipment.

From the earliest design stage—where transportability and delivery feasibility are already considered—to multi-party coordinated execution, CHINT delivers not only equipment, but integrated solutions for complex global projects.

 

Against the backdrop of accelerating global energy transition and infrastructure upgrades, the safe and efficient delivery of large-scale power equipment has become a critical factor in project success.The successful shipment of this 165-ton transformer not only showcases CHINT’s manufacturing strength in the heavy equipment domain, but also reflects its growing capabilities in complex global project execution and delivery innovation.

 

Looking ahead, CHINT will continue to empower global customers with safer, more efficient, and more competitive integrated solutions—enabling projects worldwide to move forward with confidence.

The Latest
JUNE 4, 2026 Powering Innovation, Join the 3rd CHINT Cup Now

Apply for the 2026 CHINT Cup Youth Innovation Contest and compete in green development, smart electrical, and tech innovation tracks for global awards and incubation support.

JUNE 2, 2026 Powering Clean Energy in the Andes | CHINT Supports Renewable Project in Peru

CHINT supports ENGIE’s Intipampa Wind Power Station in Peru with a 75MVA 138kV power transformer, enabling reliable clean energy delivery in the Andes.

MAY 26, 2026 CHINT Electrics: 2025 Sustainability Report

Explore CHINT Electrics’ 2025 Sustainability Report, highlighting ESG strategy, carbon neutrality goals, green innovation, responsible governance, and global sustainable development progress.

MAY 25, 2026 CHINT Electrics Releases Its First Climate-Related Financial Information Disclosure Report, Delivering on Its "Dual Carbon" Commitments Through Reliable Action

CHINT Electrics released its first TCFD-aligned climate-related financial disclosure report, highlighting climate governance, risk management, carbon targets, and its commitment to sustainable development.

MAY 13, 2026 Empowering the Next Generation of AI Infrastructure with Unmatched Speed

Discover how NOARK Electric delivered a same-day quote and fast-tracked transformers and switchboards for a major AI data center project in North America.

MAY 6, 2026 CHINT Electrics Q1 Report of 2026 & Annual Report of 2025

CHINT Electrics Q1 2026 report highlights growth in smart electrics and green energy, advancing digital and zero-carbon solutions while expanding global markets.

MAY 6, 2026 CHINT Validates Industry-Leading 60Hz 800kvar Capacitor Unit and 145kV GIS for High-Demand Grid Applications

CHINT’s 60Hz 800kvar capacitor unit and 145kV GIS pass KEMA & C2-class tests, proving reliable performance, superior switching, and technical strength for high-demand global power grids.

APRIL 30, 2026 Powering Central Asia’s Green Future: CHINT Delivers MV Skid Solution for MASDAR Bukhara 250MW Solar PV Plant

CHINT delivers an integrated MV skid solution for the MASDAR Bukhara 250MW Solar PV Plant, supporting reliable solar-plus-storage power in Uzbekistan.

APRIL 27, 2026 165-ton Transformer Successfully Shipped: CHINT Sets a New Paradigm for Global Heavy-Duty Delivery

CHINT successfully shipped a 165-ton 400kV transformer to Spain using an innovative MAFI trailer and RoRo vessel solution, setting a new benchmark for safe, efficient global heavy-duty equipment delivery.

APRIL 13, 2026 CHINT Showcased Its Largest Presence at FEICON 2026 and Announces Local Assembly of Air Circuit Breaker in Brazil

CHINT showcased its largest FEICON 2026 presence in Brazil, unveiling new power solutions and announcing local Air Circuit Breaker assembly for faster supply.