Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN

Europe

France
Italy
Kazakhstan
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico

Latin America

Brazil
Colombia
Ecuador
Peru
Utility PV & ESS

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
France
Italy
Kazakhstan
Netherlands
Spain
Turkey
United Kingdom
Mexico
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

How to Install NXBLE-63 Residual Current Operated Circuit Breaker

FEB 12, 2025

Install NXBLE-63 Residual Current Operated Circuit Breaker
Install NXBLE-63 Residual Current Operated Circuit Breaker
Install NXBLE-63 Residual Current Operated Circuit Breaker

Table of Contents

  1. Preparing for Installation
  2. Pre-Installation Steps
  3. Installing the NXBLE-63 RCBO
  4. Wiring the Circuit Breaker
  5. Testing and Commissioning
  6. Conclusion

The NXBLE-63 Residual Current Operated Circuit Breaker(RCBO) is a sophisticated device. It protects electrical circuits from overcurrent. It’s also effective against ground fault conditions. The RCBO is a compact unit. It combines the functions of two devices in a single module. One is the overcurrent circuit breaker, and the other is the residual current device. This comprehensive guide presents the precise installation process. The purpose is to help you ensure the safe and efficient implementation of this critical electrical protection component.

Preparing for Installation

The NXBLE-63 Residual Current Operated Circuit Breaker installation requires attention to detail. Careful preparation and proper groundwork are essential. The following are crucial preparatory steps:

1. Safety Precautions

Power disconnection is the first and most critical safety measure. Turn off the main power supply before beginning. This step prevents potential electrical shock. It eliminates the risk of accidental energization. It brings peace of mind and safety for a residual current circuit breaker with overcurrent protection installation.

Personal protective equipment is also crucial. It’s recommended to wear insulating gloves. These provide good electrical protection. Protective goggles are also recommended. They shield your eyes from potential sparks or debris.

2. Required Tools and Materials

Successful residual current operated circuit breaker installation demands a specific set of tools and materials. These include:

  • Wire strippers
  • Crimping tools
  • Multimeter
  • Electric screwdriver
  • Flathead screwdriver
  • Wire lugs
  • Wires of appropriate specifications

Select wire specifications carefully. The cross-sectional area must match the RCBO’s current rating. Our recommended CHINT RCBO wire specifications range from 1 mm² to 16 mm², depending on the breaker’s amperage.

Pre-Installation Steps

Understanding the circuit breaker’s specifications is a key preparatory action. Selecting an appropriate installation location is equally important. These steps ensure optimal performance and safety of the residual current circuit breaker with overcurrent protection:

1. Reading the Instructions

Verify that the NXBLE-63 RCBO’s parameters precisely match your specific working conditions. Check CHINT RCBO voltage ratings, current capacity, and environmental specifications before proceeding.

Choose a residual current operated circuit breaker installation location that’s easily accessible. It should be well-ventilated and away from direct moisture or extreme temperatures. The location should allow convenient operation and maintenance.

2. Inspecting the Equipment

Carefully examine all components of the residual current circuit breaker with overcurrent protection for any damage or manufacturing defects. Ensure all parts are intact and meet quality standards before beginning installation.

Installing the NXBLE-63 RCBO

Mounting on the DIN Rail requires precision and careful alignment. Position the bottom edge of the residual current circuit breaker against the lower rail edge. Then, gently push upward until secure. Apply firm, even pressure to ensure the residual current operated circuit breaker locks into place. Verify that it’s firmly seated and cannot be easily dislodged.

NXBLE-63 Residual Current Operated Circuit Breaker
NXBLE-63 Residual Current Operated Circuit Breaker
NXBLE-63 Residual Current Operated Circuit Breaker

Wiring the Circuit Breaker

Proper wiring is the backbone of a successful CHINT RCBO installation. Follow these guidelines:

1. Choosing the Correct Wire

The wire’s cross-sectional area must precisely match the circuit breaker’s current rating. This ensures optimal residual current circuit breaker performance and prevents potential overheating or electrical failures. Use this reference table for optimal selection:

Rated Current (A)

Recommended Wire Cross-Section (mm²)

6 A

1

10 A

1.5

16 A

2.5

20 A

2.5

25 A

4

32 A

6

40 A

10

50 A

10

63 A

16

2. Wiring Process

Use high-quality wire strippers to remove 11-13mm of outer insulation. Ensure the exposed length is consistent and free from nicks or damage.

Wire lugs require secure crimping to establish reliable electrical connections. Position the wire lug carefully. Align it perfectly with the exposed copper. Use the crimping tool to create a tight, uniform connection that minimizes electrical resistance.

Next, use an electric screwdriver set to the manufacturer’s recommended specifications, typically around 2.0 N.m. This precise tightening ensures secure residual current operated circuit breaker connections without damaging the terminal or wire.

3. Connecting Inlet and Outlet Ends

Carefully follow the product’s labeling and installation instructions when connecting electrical lines. Each residual current circuit breaker terminal is specifically designed for incoming or outgoing connections. Misplacement can lead to serious electrical hazards. Connect the incoming power lines to the appropriate input terminals and the load lines to the output terminals.

4. Compliance with Standards

Adherence to local electrical regulations is crucial during the residual current operated circuit breaker wiring process. Make sure your installation meets all relevant safety codes and municipal guidelines to guarantee a safe, compliant electrical setup.

Testing and Commissioning

The testing and commissioning phase validates the circuit breaker’s functionality. It ensures electrical safety and confirms proper installation.

1. Pre-Power Checks

Verify that the circuit breaker’s handle operates smoothly without resistance. Confirm all connections are tight, secure, and correctly positioned. Check that no loose wires or potential short-circuit risks exist in the installation area.

2. Testing After Power-On

Use a multimeter to perform detailed electrical testing. Measure the voltage across different terminals, checking for correct readings. Verify continuity to ensure uninterrupted electrical pathways. Confirm incoming line to neutral voltage is approximately 230 volts. The outgoing line to neutral should be below 20 volts.

Next, systematically test the residual current operated circuit breaker through multiple operational scenarios. Verify performance in OPEN, CLOSED, and TRIPPING states. Check that voltage drops appropriately when the breaker opens and returns to normal when closed.

3. Using the RCD Test Button

The residual current device (RCD) test button allows direct verification of automatic tripping functionality. Press the button to simulate a ground fault condition. Confirm the circuit breaker trips immediately and automatically.

Conclusion

Installing the NXBLE-63 RCBO requires attention to detail and strict adherence to safety protocols. Safety precautions, gathering the right tools, and pre-installation steps are crucial. Then, you can proceed with installation, wiring, and finally, testing and commissioning. At CHINT, we provide reliable electrical protection solutions that prioritize safety and performance. For comprehensive guidance and support, visit our website.

The Latest
JUNE 12, 2025 What Is Motor Start Up Current and Why Is It So High?

Discover why motor start-up current is so high and how it affects electrical systems. Learn how to protect motors effectively with CHINT's solutions.

JUNE 12, 2025 Selecting the Right Air Circuit Breaker for Data Centers and Critical Power Distribution

Discover how to select the right air circuit breaker for data centers. Learn about CHINT’s NA8 features, certifications, and smart integration benefits.

JUNE 11, 2025 Everything You Should Know About Solar Pumping System

Understand the benefits, applications, and components of solar pumping systems including CHINT’s NVFPV drives for reliable water access.

JUNE 10, 2025 How Altitude Affects the Performance of Moulded Case Circuit Breakers

Learn the effects of altitude on circuit breakers and explore CHINT’s NM8N-HV MCCB built for extreme conditions with high performance and safety.

JUNE 9, 2025 What Is A Pulse Relay and How Does It Work?

Explore the energy-efficient pulse relay technology used in automation, lighting, and security systems. Featuring CHINT’s NJMC1 relay for reliable performance.

JUNE 7, 2025 Understanding AC Contactors: Uses and Warning Signs of Failure

Learn how to recognize signs of a failing AC contactor and get expert tips on resolving issues, performing maintenance, and ensuring electrical safety.

JUNE 6, 2025 What Are Harmonics and Total Harmonic Distortion (THD) in Power Systems

Discover the causes, impacts, and solutions for harmonics and THD in electrical networks. Enhance reliability with CHINT’s NZB379 controller.

JUNE 6, 2025 Types of Lightning Surge Arresters and Their Functions

Discover the essential types of lightning surge arresters and their working principles. Learn how to protect your electrical systems from voltage surges effectively.

JUNE 5, 2025 Thermal Magnetic Circuit Breakers vs Hydraulic Magnetic Circuit Breakers

A comprehensive comparison of thermal magnetic and hydraulic magnetic circuit breakers. Learn about their protection, environmental susceptibility, trip time, size, and cost with CHINT.

JUNE 5, 2025 Automatic Transfer Switch (ATS) Comprehensive Guide

Explore how ATS ensures uninterrupted power supply for critical applications. Learn about types, uses, performance, and CHINT solutions.