Por favor, introduzca palabras clave para buscar

Global |EN

Elige tu país e idioma

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore

Middle East & Africa

Kenya
Saudi Arabia
South Africa
United Arab Emirates

Europe

France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom

Latin America

Brazil
Colombia
Ecuador
Peru

North America

Canada
Mexico
United States
Baja tensión
Aparatos de conmutación de baja tensión y software
Instrumentos y medidores
Telecomunicaciones y Data centers
Industria
Edificios
Centro de servicio
Contáctenos
Llámanos +52 55 8881 6127
Envíenos un correo electrónico info@chint-mexico.com
Acerca de CHINT
Centro de noticias
Carreras

Elige tu país e idioma

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Kenya
Saudi Arabia
South Africa
United Arab Emirates
France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom
Brazil
Colombia
Ecuador
Peru
Canada
Mexico
United States

Por favor, introduzca palabras clave para buscar

Su término de búsqueda contiene palabras clave restringidas. Utilice otras palabras clave.

CHINT Chile San Andres Hydropower Station Connected to Grid

JUN 16, 2022

Starting from June 2020, the reconstruction project of the 220kV Los Corrales substation in Chile has started, and CHINT is responsible for the supply and installation of a complete set of power station equipment.

The San Andres Hydropower Station is located in the Chilean Andes Mountains. It is covered with snow all year round, and the terrain is complex. The operating altitude reaches 3,000 meters, which brings great challenges to the cold resistance, transportation, and installation of our products.

In order to minimize the transportation risk, CHINT logistic team inspected the site three times and cooperated with customers to clear and reinforce dangerous spots before transportation. In the end, it took one day and night to overcome many difficulties and successfully escorted the product from the port to the site.

At present, the power station has been successfully connected to the grid and put into use. The one-year construction period is not short, and every day, we are in full swing to built the power grid in the snow-capped mountains.

Whether in the desert or in the snow-capped mountains, where there is electricity, there are people from CHINT. We are striving to connect the world with electricity and are committed to sending electricity to every corner of the world.

Lo último
JULY 14, 2025 CHINT Q2 2025 Product Highlights

Discover CHINT’s Q2 2025 innovations—9 new low-voltage solutions designed for safety, reliability, and global performance in power distribution.

JUNE 27, 2025 CHINT Shines at the AEF 2025, Shaping the Future of Energy

CHINT highlights cutting-edge power solutions at the Africa Energy Forum 2025, supporting Africa’s sustainable energy transformation through innovation and localization.

JUNE 26, 2025 Did you know CHINT?Global Reach, Local Impact

Discover how CHINT delivers tailored electrical solutions across 140+ countries, solving local infrastructure challenges with innovative, smart technology.

JUNE 24, 2025 Empowering Thailand’s Food Industry with Reliable Power Solutions

Discover how CHINT provided Prawit Farm with reliable low-voltage power distribution solutions, ensuring continuous and efficient operations for their new food processing factory in Thailand.

JUNE 18, 2025 Building a New Energy Ecosystem, CHINT Appeared at SNEC 2025

Discover CHINT’s smart microgrids, green tech innovations, and ESG strategy as they reshape the global energy landscape at SNEC 2025.

JUNE 17, 2025 Join the challenge! The 2025 CHINT Cup Global Youth Innovation Contest is now open!

Enter the CHINT Cup 2025 for a chance to showcase cutting-edge innovations in AI, energy, and technology. Global youth welcome. Attractive prizes await.

JUNE 15, 2025 CHINT Wraps Up SENDI 2025 Showcasing New Local Meter Factory

At SENDI 2025, CHINT unveiled its Manaus smart-meter plant, boosting Brazil’s grid with sustainable tech and 350+ new jobs.

JUNE 8, 2025 NOARK Electric has a new address in Czech Republic

NOARK Electric has relocated to Harfa Office Park in Prague 9. Learn about their expansion, new showroom, and upgraded workspace.

MAY 29, 2025 Did you know CHINT?Every Role Has the Power to Shine

Discover the inspiring stories behind CHINT. Learn how our diverse team, from engineers to sales, drives innovation and proves that every role has the power to shine.

MAY 29, 2025 Building Smarter, Greener Data Centers Worldwide

Discover how CHINT is leading the way in constructing eco-friendly, high-efficiency data centers in the Philippines, Indonesia, and China with innovative, low-carbon solutions.