Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Singapore (Sunlight)
Vietnam

West Asia and Africa

CHINT-EGEMAC
South Africa
UAE

Europe

Italy
Spain
Turkey

North America

Mexico

Latin America

Brazil
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
South Africa
UAE
Italy
Spain
Turkey
Mexico
Brazil
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT T&D continuously create value in mining and metallurgical

JULY 20, 2020

Recently, CHINT T&D successfully delivered power to the copper cobalt hydrometallurgy project in Congo! This project is located in the copper-cobalt mining area of Katanga province in the southern part of Congo, the heartland of Africa, as a key project of the local mining industries. After the completion of the project, the local production line will be further improved, which largely boosts the recycling rate of copper-cobalt mines so as to alleviate the current global shortage of copper-cobalt mine resource and contributes to the domestic demand.

It is well known that customers want to choose excellent solutions among numerous equipment suppliers or service providers for the power problems in the mining and metallurgy industry. After several rounds of competition, CHINT T&D stands out with its professional system solutions, power equipment of the whole industrial chain and one-stop service. 

As a smart electricity and energy efficiency solution provider, CHINT T&D has been providing systematic power solutions around the characteristics and protection of The T-line, and has been providing customers with modular primary equipment integration of 120kV substation. HGIS has been recognized by customers as a highlight product, which combines the advantages of open-type and closed-type switching equipment to highly integrate high-voltage components and greatly save the product's floor space and installation time. Single bay H-GIS can be completed within 6 hours from installation and commissioning to final operation. 

Up to now, CHINT T&D has been deeply engaged in the mining and metallurgy industry for many years, from equipment supply to solutions, deep exploration of customer demand, not only to meet needs but also to satisfy customers.

In the future, CHINT T&D will continue to strive for perfection and create value for customers with its professional products and services. In the current complex situation, it will continue to work hard and move forward with determination to solve problems for customers.

The Latest
DECEMBER 11, 2024 CHINT Electric France Demonstrates its Solutions for Innovation and Decarbonization at the Heart of EnerGaia 2024

CHINT reaffirms its commitment to energy transition by participating in the EnerGaia trade show in Montpellier on December 11 and 12, 2024.

DECEMBER 11, 2024 CHINT Supports China Unicom Data Center in Wuzhen②

Join us as we uncover the core technologies and unique advantages of CHINT’s solutions, revealing the driving force behind the “Super Brain”.

DECEMBER 11, 2024 CHINT is Listed on the ESG50 China 2025 Most Noteworthy List

On November 29, 2024, CHINT is listed on the “Bloomberg Green ESG50 China 2025 Most Noteworthy List: Leading Champion”.

DECEMBER 3, 2024 CHINT Supports China Unicom Data Center in Wuzhen ①

As a global leading smart energy solutions provider, CHINT leverages its integrated high-medium-low voltage solution to ensure stable power for the Wuzhen Intelligent Computing Center.

DECEMBER 3, 2024 CHINT Global Shines on Forbes Global Brand Top 30

The "2024 Forbes China Go-International Brands Top 30" results have been officially announced. CHINT Global has earned a spot on the prestigious list and is recognized for its outstanding performance and significant contributions on the global stage.

DECEMBER 3, 2024 CHINT Attended the 2nd China International Supply Chain Expo

CHINT brought the whole industrial chain solution of electric power and new energy to the 2nd China International Supply Chain Expo.

DECEMBER 3, 2024 CHINT and Qinghai Lihao Partner for Silicon Production

CHINT has partnered with Qinghai Lihao to build the world’s largest single-line production base for high-purity silicon in Xining, Qinghai Province.

DECEMBER 2, 2024 CHINT's Strategic Partnership in Renewable Energy Infrastructure

In the context of the global transition to renewable energy, CHINT has partnered with Tongwei Co., Ltd., a global leader in the high-purity polysilicon industry, to support large-scale energy projects.

DECEMBER 2, 2024 CHINT Industry Solution – Industrial OEM

Unveiling CHINT’s Industrial OEM solutions in our #IndustrySolutionSeries!

NOVEMBER 25, 2024 CHINT First Three Quarters Report of 2024

On the evening of October 30, 2024, we released the report of the first three quarters of 2024.