Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
Egypt
Kenya

Europe

France
Italy
Spain
Turkey
Kazakhstan
Netherlands

North America

Mexico

Latin America

Brazil
Peru
Ecuador

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
Egypt
Kenya
France
Italy
Spain
Turkey
Kazakhstan
Netherlands
Mexico
Brazil
Peru
Ecuador

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT T&D continuously create value in mining and metallurgical

JUL 20, 2020

Recently, CHINT T&D successfully delivered power to the copper cobalt hydrometallurgy project in Congo! This project is located in the copper-cobalt mining area of Katanga province in the southern part of Congo, the heartland of Africa, as a key project of the local mining industries. After the completion of the project, the local production line will be further improved, which largely boosts the recycling rate of copper-cobalt mines so as to alleviate the current global shortage of copper-cobalt mine resource and contributes to the domestic demand.

It is well known that customers want to choose excellent solutions among numerous equipment suppliers or service providers for the power problems in the mining and metallurgy industry. After several rounds of competition, CHINT T&D stands out with its professional system solutions, power equipment of the whole industrial chain and one-stop service. 

As a smart electricity and energy efficiency solution provider, CHINT T&D has been providing systematic power solutions around the characteristics and protection of The T-line, and has been providing customers with modular primary equipment integration of 120kV substation. HGIS has been recognized by customers as a highlight product, which combines the advantages of open-type and closed-type switching equipment to highly integrate high-voltage components and greatly save the product's floor space and installation time. Single bay H-GIS can be completed within 6 hours from installation and commissioning to final operation. 

Up to now, CHINT T&D has been deeply engaged in the mining and metallurgy industry for many years, from equipment supply to solutions, deep exploration of customer demand, not only to meet needs but also to satisfy customers.

In the future, CHINT T&D will continue to strive for perfection and create value for customers with its professional products and services. In the current complex situation, it will continue to work hard and move forward with determination to solve problems for customers.

The Latest
OCTOBER 11, 2025 CHINT Powers a Greener Future at Vietnamese International School

CHINT empowers a Vietnamese international school with an 86kWp solar rooftop system, cutting CO₂ emissions and inspiring eco-conscious education.

OCTOBER 11, 2025 Did you Know CHINT? When Manufacturing Meets ESG

Discover how CHINT leads sustainable manufacturing through ESG—advancing green factories, people-focused initiatives, and responsible governance.

SEPTEMBER 23, 2025 CHINT Signs MoU with Prince Sattam bin Abdulaziz University to Advance Smart Energy Research and Innovation

CHINT signs MoU with Prince Sattam bin Abdulaziz University to drive smart energy research, innovation, and sustainable solutions in Saudi Arabia’s Vision 2030.

SEPTEMBER 19, 2025 Lighting Up the Rooftop of Africa: CHINT Anneng’s Journey of Light and Hope

CHINT Anneng’s PVSTAR brings clean solar power to Kenya, lighting homes, powering shops, and driving Africa’s green, sustainable future.

SEPTEMBER 9, 2025 CHINT Electric Earns EcoVadis Gold, Making a Leap from Bronze to Gold in One Year

CHINT Electric earns EcoVadis Gold Medal, up from Bronze in a year—top 5% globally for Environment, Labor & Human Rights, Ethics and Sustainable Procurement.

SEPTEMBER 9, 2025 CHINT Semi-Annual Report of 2025

CHINT 2025 Semi-Annual Report: H1 revenue $4.14B (+2.2%) and net profit +32.9%, led by smart electrics, green energy, and global expansion. Released Aug 27.

AUGUST 29, 2025 CHINT Colombia: The evolution of a commitment to the energy of the future

CHINT Colombia opens its Bogotá office to boost innovation, clean energy, and sustainable growth, driving the country’s energy transition.

AUGUST 22, 2025 Did you know?People at CHINT Highlights the Voices of Progress

Did you know? Behind every innovation and every connection are people who make it happen.

AUGUST 14, 2025 CHINT Lights Up the Caribbean with Smart Metering

CHINT’s Wi-SUN smart metering transforms a Caribbean island’s power grid, boosting efficiency, cutting losses, and enabling real-time remote control.

AUGUST 5, 2025 Boîtiers STA & NOARK: Powering Reliability Across Public and Private Sectors

Boîtiers STA partners with NOARK to deliver safe, high-performance power solutions for hospitals, parks, and public sectors across Canada.