Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore

Middle East & Africa

Kenya
Saudi Arabia
South Africa
United Arab Emirates

Europe

France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom

Latin America

Brazil
Colombia
Ecuador
Peru

North America

Canada
Mexico
United States
Low-voltage
Instruments and Meters
EV Charging
Telecom & Data Center
Buildings
Products
Solutions
Project References
Corporate Reports
CHINT Global
CHINT's Insights
Careers
Locate Us
Contact Us
Call Us +61 1800 270 870
Email Us info.australia@CHINT.com
Privacy Policy
Online Services

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Kenya
Saudi Arabia
South Africa
United Arab Emirates
France
Kazakhstan
Netherlands
Spain
Italy
Turkey
United Kingdom
Brazil
Colombia
Ecuador
Peru
Canada
Mexico
United States

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

Turning crises into opportunities: Saudi order winning

JUL 20, 2020

The year 2020 saw a challenge but remarkable journey. CHINT Middle East market, where global sales team is working hard, welcomed a major project breakthrough in Saudi Arabia, the State Grid smart meter project with MCCB after three years' continuous follow-up. The target product involved is the motor-integrated circuit breaker developed independently by CHINT, with the accumulative quantity of more than 100,000 and the amount of over $10mn.

United as one, we have one faith for win

The project of circuit breakers for smart meters was complex and involved a large number of end users. Due to the special climate of Saudi Arabia, the performance of circuit breakers not only need to meet the IEC standards and the setting temperature of 55℃, but also they needed to adopt the down-feed mode, especially it's strictly in the dimension change. Meanwhile, the project also encountered challenges of four upgrades of the product and difficulties in the project bidding negotiations.

The advantages of close cooperation and resource sharing in global business units of CHINT Global fully emerged. Within three years, our sales team, R&D team and PM worked round-the-clock in an iron triangle way. Centering on customer demand, we timely calibrated technical solutions and tried and summarized for months. Everyone was doing his best. Finally, we won the project through brand strength, R&D ability and customer response, as well as the perfect team cooperation of the company.

In the potential market, we determine to get steady growth

A good fighter is good at drawing on his strength. Behind the landmark order, it's the deep ploughing for more than a decade that matters. Since the first MCB entrance in the Saudi market in 2005, CHINT Global has been developing locally in Saudi Arabia for 15 years.

With high qualification and precision marketing, CHINT has successively completed a number of grid connection of products for key ministries, agencies, design institutes. Step by step, we won impressive Chinese EPC projects from Saudi Electricity Authority, Saudi Housing Ministry, Saudi Interior Ministry and Saudi Aramco, laying a solid foundation for future business development in local market.

The smart electricity meter project is one of the key projects of energy conservation and emission reduction and an important part of the smart grid, smart city construction in Saudi Arabia, empowering the implementation of the energy conservation and emission reduction goals of "Vision 2030". The project includes the deployment and installation of 5mn smart meters, head end systems and supporting terminals in the southwest of Saudi Arabia, which will be built by CLP as EPC and planned to be put into operation in 2021.

CHINT's successful winning of the project can be regarded as the epitome of turning the tide under the special period. For CHINT, which has been strengthening its global strategic and cultivating the Belt and Road initiative, this is not only the largest single project that the company has won overseas so far, but also we rank the key supplier list of the State Grid, and open a larger market development space. It has a great positive role in shaping the brand image of Chinese industrial electric enterprise and promoting "CHINT Manufacturing".

The Latest
MAY 26, 2026 CHINT Electrics: 2025 Sustainability Report

Explore CHINT Electrics’ 2025 Sustainability Report, highlighting ESG strategy, carbon neutrality goals, green innovation, responsible governance, and global sustainable development progress.

MAY 25, 2026 CHINT Electrics Releases Its First Climate-Related Financial Information Disclosure Report, Delivering on Its "Dual Carbon" Commitments Through Reliable Action

CHINT Electrics released its first TCFD-aligned climate-related financial disclosure report, highlighting climate governance, risk management, carbon targets, and its commitment to sustainable development.

MAY 13, 2026 Empowering the Next Generation of AI Infrastructure with Unmatched Speed

Discover how NOARK Electric delivered a same-day quote and fast-tracked transformers and switchboards for a major AI data center project in North America.

MAY 6, 2026 CHINT Electrics Q1 Report of 2026 & Annual Report of 2025

CHINT Electrics Q1 2026 report highlights growth in smart electrics and green energy, advancing digital and zero-carbon solutions while expanding global markets.

MAY 6, 2026 CHINT Validates Industry-Leading 60Hz 800kvar Capacitor Unit and 145kV GIS for High-Demand Grid Applications

CHINT’s 60Hz 800kvar capacitor unit and 145kV GIS pass KEMA & C2-class tests, proving reliable performance, superior switching, and technical strength for high-demand global power grids.

APRIL 30, 2026 Powering Central Asia’s Green Future: CHINT Delivers MV Skid Solution for MASDAR Bukhara 250MW Solar PV Plant

CHINT delivers an integrated MV skid solution for the MASDAR Bukhara 250MW Solar PV Plant, supporting reliable solar-plus-storage power in Uzbekistan.

APRIL 27, 2026 165-ton Transformer Successfully Shipped: CHINT Sets a New Paradigm for Global Heavy-Duty Delivery

CHINT successfully shipped a 165-ton 400kV transformer to Spain using an innovative MAFI trailer and RoRo vessel solution, setting a new benchmark for safe, efficient global heavy-duty equipment delivery.

APRIL 13, 2026 CHINT Showcased Its Largest Presence at FEICON 2026 and Announces Local Assembly of Air Circuit Breaker in Brazil

CHINT showcased its largest FEICON 2026 presence in Brazil, unveiling new power solutions and announcing local Air Circuit Breaker assembly for faster supply.

MARCH 31, 2026 Off-Grid Solar Street Lighting — Soran–Khlefan Tunnel and Mountain Road Safety Upgrade

Discover how an off-grid solar street lighting project in the Soran–Khlefan tunnel and mountain roads of Iraq improved visibility, road safety, and mobility with more than 20 solar-powered lighting poles built for remote, harsh environments.

MARCH 30, 2026 Powering the Future of Rotterdam’s EV Hub

NOARK ACBs ensure safe, reliable low-voltage protection for Rotterdam’s heavy-duty EV charging hub, delivering stable performance in harsh port environments.