Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam

Middle East & Africa

Saudi Arabia
South Africa
UAE
Egypt
Kenya

Europe

France
Italy
Kazakhstan
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico
USA
Canada

Latin America

Brazil
Colombia
Ecuador
Peru
Instruments and Meters
Telecom & Data Center
Buildings
Products
Solutions
Project References
Corporate Reports
CHINT Global
CHINT's Insights
Careers
Locate Us
Contact Us
Call Us +61 1800 270 870
Email Us info.australia@CHINT.com
Privacy Policy
Online Services

Choose your country & Language

Australia & New Zealand
India
Indonesia
Malaysia
Philippines
Singapore
Vietnam
Saudi Arabia
South Africa
UAE
Egypt
Kenya
France
Italy
Kazakhstan
Netherlands
Spain
Turkey
United Kingdom
Mexico
USA
Canada
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT Helps Build Huaneng UK 99.8MW Minety Project

DEC 29, 2021

On December 15, CHINT was invited to attend the online commencement ceremony of battery energy storage project of British Stonehill (Minety phase II) developed by China Huaneng Group Co., Ltd.

Previously, CHINT provided a complete set of transformer products for phase I Minety project, which won the trust and recognition of Huaneng Group with high-quality products and professional services.

After the completion of Minety battery energy storage project, it will mainly participate in peak shaving and frequency modulation, fast frequency response, black start, capacity market and other services in the UK power market, which will help improve the UK Power Grid’s ability to accept renewable energy, effectively improve the resilience of the local power grid to cope with peak and valley shocks, improve the operation safety and stability of the power system, create jobs and contribute taxes for the local power market, bringing good social and economic benefits.

The designed installed capacity of Stonehill project is 49.9 MW and the energy storage capacity is 99.8 MW. During this cooperation, CHINT products will play an important role in transformer guarantee in Minety phase II battery energy storage project and jointly help the rapid layout and development of Huaneng battery energy storage project in the UK.

As a demonstration project of cooperation between China and the UK in the field of new energy, Stonehill project was listed as one of the 18 projects supporting green and low-carbon development in the UK at the UK Global Investment Summit, which will provide important support for the stable operation of West London power grid and help the UK achieve the goal of “2050 net zero emission”. British Prime Minister Boris Johnson said that these projects are the beginning of the establishment of a new partnership for green growth in Britain.

The Latest
MARCH 2, 2026 Embedding Sustainability into Long-Term Growth: CHINT Group’s Key ESG Achievements of 2025

CHINT Group advances its 2030 ESG strategy in 2025 with SBTi targets, green supply chain innovation, top ESG ratings, and scalable zero-carbon solutions.

MARCH 2, 2026 CHINT Group 2026 New Year Conference : Green & Intelligent Synergy

CHINT’s 2026 New Year Conference highlights Green & Intelligent Synergy, AI First strategy, and 185B RMB revenue, driving global growth and innovation.

MARCH 2, 2026 Smart Low-voltage Distribution Project at Nha Trang College of Technology (NTCT)

CHINT delivers its first EMS project in Vietnam, upgrading NTCT with smart low-voltage distribution and digital energy management for scalable campus efficiency.

DECEMBER 25, 2025 CHINT Enhances EV Charging Safety with Advanced Protection Solution in France

CHINT boosts EV charging safety in France with protection solutions, raising short-circuit capacity to 30kA while cutting costs.

DECEMBER 23, 2025 Did you know - CHINT MCBs Deliver Compact Design with Global-Scale Performance

CHINT MCBs combine compact design with globally certified performance, delivering reliable safety and consistent quality for residential, commercial, and industrial use.

DECEMBER 4, 2025 CHINT Repeats Honor: Listed on The Watchlist 2026 as ESG Champion

CHINT Group is named an ESG Champion at Bloomberg Green’s Watchlist 2026, highlighting its innovation, clean energy achievements, and leadership in China’s green transition.

SEPTEMBER 9, 2025 CHINT Semi-Annual Report of 2025

CHINT 2025 Semi-Annual Report: H1 revenue $4.14B (+2.2%) and net profit +32.9%, led by smart electrics, green energy, and global expansion. Released Aug 27.

SEPTEMBER 9, 2025 CHINT Electric Earns EcoVadis Gold, Making a Leap from Bronze to Gold in One Year

CHINT Electric earns EcoVadis Gold Medal, up from Bronze in a year—top 5% globally for Environment, Labor & Human Rights, Ethics and Sustainable Procurement.

AUGUST 29, 2025 CHINT Colombia: The evolution of a commitment to the energy of the future

CHINT Colombia opens its Bogotá office to boost innovation, clean energy, and sustainable growth, driving the country’s energy transition.

AUGUST 22, 2025 Did you know?People at CHINT Highlights the Voices of Progress

Did you know? Behind every innovation and every connection are people who make it happen.