Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN

Europe

France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico

Latin America

Brazil
Colombia
Ecuador
Peru

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom
Mexico
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT Helps to Build a World-class Hydro-solar Hybrid PV Station

AUG 5, 2022

Recently, CHINT Solar won the bid for the first phase of the 523.1MW Yalong hydro-solar Hybrid project. The project will be the first million-kilowatt photovoltaic power station in Sichuan and the largest hydro-solar hybrid power station in the world. More than 900,000 ASTRO 5 double-sided double-glass modules (182) will be sent to Sichuan, capture the splendor of light on the vast plateau and convert it into clean energy power to help the China’s west-to-east power transmission strategy.

The hydro-solar power station is located as high as 4,000 to 4,600 meters above sea level, with an extreme lowest temperature of -30.6°C and a maximum snow depth of 24 cm. The high-altitude and cold environment place more stringent requirements on the reliability and environmental adaptability of photovoltaic modules. 

The winning ASTRO 5 double-sided double-glass module (182) was sent to PVEL, an authoritative third-party laboratory, for strict reliability testing. Hundreds of thermal cycle experiments and wet freezing experiments were performed in an extreme temperature environment of 85 °C, and the excellent low attenuation rate of less than 2% was still maintained, and the “Top Performer” test result was obtained.

The clean energy resources in the Yalong River Basin are uniquely endowed by nature, and it is a unique and rare high-quality super-large and complementary basin clean and renewable energy base in China. After the completion of the water-light complementation project between the two estuaries of the Yalong River, it will become the world’s highest-altitude water-solar complementation integration demonstration project.

The Latest
APRIL 14, 2025 Unlock Efficiency and Flexibility with CHINT NVF2L Drive

The mobile substation is equipped with mobile capabilities. It becomes a flexible and reliable solution that can provide immediate, mobile power support for high, medium, and low-voltage applications.

APRIL 8, 2025 CHINT JV with ATC

MARCH 28, 2025 CHINT Hosted Al Arabiya Business Partner Summit 2025

The mobile substation is equipped with mobile capabilities. It becomes a flexible and reliable solution that can provide immediate, mobile power support for high, medium, and low-voltage applications.

MARCH 27, 2025 CHINT Green Hour² global challenge highlight: Creativity Meets Sustainability

The mobile substation is equipped with mobile capabilities. It becomes a flexible and reliable solution that can provide immediate, mobile power support for high, medium, and low-voltage applications.

MARCH 18, 2025 CHINT Fuels Smart Living at Jinding Dongnan Garden

The mobile substation is equipped with mobile capabilities. It becomes a flexible and reliable solution that can provide immediate, mobile power support for high, medium, and low-voltage applications.

MARCH 13, 2025 CHINT Global and Itron Lead Industry with First Smart Meter Based on the DLMS Generic Companion Profile (GCP) Standard

The mobile substation is equipped with mobile capabilities. It becomes a flexible and reliable solution that can provide immediate, mobile power support for high, medium, and low-voltage applications.

MARCH 4, 2025 CHINT & RITTAL Sign MoU to Increase Collaboration

The mobile substation is equipped with mobile capabilities. It becomes a flexible and reliable solution that can provide immediate, mobile power support for high, medium, and low-voltage applications.

FEBRUARY 24, 2025 40 Years and Beyond Chapter 1

The mobile substation is equipped with mobile capabilities. It becomes a flexible and reliable solution that can provide immediate, mobile power support for high, medium, and low-voltage applications.

FEBRUARY 21, 2025 Spotlights in Media Coverage of CHINT ESG Strategy

The mobile substation is equipped with mobile capabilities. It becomes a flexible and reliable solution that can provide immediate, mobile power support for high, medium, and low-voltage applications.