Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN

Europe

France
Italy
Kazakhstan
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico

Latin America

Brazil
Colombia
Ecuador
Peru
Utility PV & ESS

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
France
Italy
Kazakhstan
Netherlands
Spain
Turkey
United Kingdom
Mexico
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

Power Knight—CHINT Mobile Substation | Next Stop: Honduras

SEP 5, 2024

Have You Ever Seen a Walking Substation?

It’s like a power knight, 

always ready to boost capacity 

wherever it’s needed. 

Or perhaps, 

it’s more like a hardcore RV, 

ready to hit the road at a moment’s notice.

Let’s go! Next stop, Honduras!

The mobile substation is equipped with mobile capabilities. By modularizing its key components and installing them on trailers, it becomes a flexible and reliable solution that can provide immediate, mobile power support for high, medium, and low-voltage applications.

To congratulate the successful delivery of the mobile substation to Honduras, the project team organized a grand farewell ceremony. The scorching weather seemed to amplify the anticipation, with pride and excitement written all over everyone’s faces. The atmosphere was electric, both on-site and for those tuning into the live streaming, with well-wishes pouring in from all around.

What lies behind this success?

Our answer is clear: 

a customer-centric value philosophy 

 and

a spirit of collaboration and mutual success 

The success of the mobile substation project is a powerful demonstration of CHINT’s commitment to a customer-centric value philosophy and a brilliant outcome of cross-departmental collaboration.

Adopting a customer-centric philosophy

Faced with client challenges and tight deadlines, CHINT didn’t back down but instead deepened its commitment to a customer-centric philosophy. The technical team tackled obstacles head-on, engaging closely with the client to continuously optimize the solution. The delivery team demonstrated exceptional execution and professionalism, delivering a flawless result that earned the client’s trust and praise.

Team collaboration and shared success

Meanwhile, the spirit of teamwork and shared success acted as a powerful engine, driving the design, manufacturing, and integrated delivery of the mobile substation. From concept to design refinement to precise manufacturing and delivery, this success was made possible by the expertise of CHINT Global EPC, the marketing department, the three manufacturing divisions (Transformers, High Voltage, Jiaxing Gas-Insulated Switchgear), as well as the supply chain and QA teams.

 

Believe in the power of belief

We believe that the mobile substation will provide stable and reliable power to local residents in Honduras, easing the power pressure. We also believe this will further solidify CHINT Global’s leadership position among global power solution providers.

Next stop, we’ll reach even further~

The Latest
AUGUST 5, 2025 CHINT Global Press Release - CHINT Appoint Legend as Master Distributor For Low Voltage Products in Australia and New Zealand

CHINT appoints Legend Corporation as master distributor of LV products in Australia & NZ, boosting access to quality electrical solutions via CABAC.

JULY 24, 2025 Countdown Begins: CHINT Cool Season 2025 Launches August 1!

Join CHINT Cool Season 2025 (Aug 1–Oct 31): global promos, new tech, rewards & events for electricians, installers & builders. Don’t miss out!

JULY 21, 2025 Did You Know? CHINT Global Manufacturing

Explore CHINT’s global manufacturing network with 30+ smart factories in 10+ countries, driving agile, localized power solutions worldwide.

JULY 14, 2025 CHINT Q2 2025 Product Highlights

Discover CHINT’s Q2 2025 innovations—9 new low-voltage solutions designed for safety, reliability, and global performance in power distribution.

JUNE 26, 2025 Did you know CHINT?Global Reach, Local Impact

Discover how CHINT delivers tailored electrical solutions across 140+ countries, solving local infrastructure challenges with innovative, smart technology.

JUNE 18, 2025 Building a New Energy Ecosystem, CHINT Appeared at SNEC 2025

Discover CHINT’s smart microgrids, green tech innovations, and ESG strategy as they reshape the global energy landscape at SNEC 2025.

JUNE 17, 2025 Join the challenge! The 2025 CHINT Cup Global Youth Innovation Contest is now open!

Enter the CHINT Cup 2025 for a chance to showcase cutting-edge innovations in AI, energy, and technology. Global youth welcome. Attractive prizes await.

JUNE 15, 2025 CHINT Wraps Up SENDI 2025 Showcasing New Local Meter Factory

At SENDI 2025, CHINT unveiled its Manaus smart-meter plant, boosting Brazil’s grid with sustainable tech and 350+ new jobs.

JUNE 8, 2025 NOARK Electric has a new address in Czech Republic

NOARK Electric has relocated to Harfa Office Park in Prague 9. Learn about their expansion, new showroom, and upgraded workspace.

MAY 29, 2025 Did you know CHINT?Every Role Has the Power to Shine

Discover the inspiring stories behind CHINT. Learn how our diverse team, from engineers to sales, drives innovation and proves that every role has the power to shine.