Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN

Europe

France
Italy
Kazakhstan
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico

Latin America

Brazil
Colombia
Ecuador
Peru
Utility PV & ESS

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
France
Italy
Kazakhstan
Netherlands
Spain
Turkey
United Kingdom
Mexico
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT T&D continuously create value in mining and metallurgical

JUL 20, 2020

Recently, CHINT T&D successfully delivered power to the copper cobalt hydrometallurgy project in Congo! This project is located in the copper-cobalt mining area of Katanga province in the southern part of Congo, the heartland of Africa, as a key project of the local mining industries. After the completion of the project, the local production line will be further improved, which largely boosts the recycling rate of copper-cobalt mines so as to alleviate the current global shortage of copper-cobalt mine resource and contributes to the domestic demand.

It is well known that customers want to choose excellent solutions among numerous equipment suppliers or service providers for the power problems in the mining and metallurgy industry. After several rounds of competition, CHINT T&D stands out with its professional system solutions, power equipment of the whole industrial chain and one-stop service. 

As a smart electricity and energy efficiency solution provider, CHINT T&D has been providing systematic power solutions around the characteristics and protection of The T-line, and has been providing customers with modular primary equipment integration of 120kV substation. HGIS has been recognized by customers as a highlight product, which combines the advantages of open-type and closed-type switching equipment to highly integrate high-voltage components and greatly save the product's floor space and installation time. Single bay H-GIS can be completed within 6 hours from installation and commissioning to final operation. 

Up to now, CHINT T&D has been deeply engaged in the mining and metallurgy industry for many years, from equipment supply to solutions, deep exploration of customer demand, not only to meet needs but also to satisfy customers.

In the future, CHINT T&D will continue to strive for perfection and create value for customers with its professional products and services. In the current complex situation, it will continue to work hard and move forward with determination to solve problems for customers.

The Latest
AUGUST 5, 2025 CHINT Global Press Release - CHINT Appoint Legend as Master Distributor For Low Voltage Products in Australia and New Zealand

CHINT appoints Legend Corporation as master distributor of LV products in Australia & NZ, boosting access to quality electrical solutions via CABAC.

JULY 24, 2025 Countdown Begins: CHINT Cool Season 2025 Launches August 1!

Join CHINT Cool Season 2025 (Aug 1–Oct 31): global promos, new tech, rewards & events for electricians, installers & builders. Don’t miss out!

JULY 21, 2025 Did You Know? CHINT Global Manufacturing

Explore CHINT’s global manufacturing network with 30+ smart factories in 10+ countries, driving agile, localized power solutions worldwide.

JULY 14, 2025 CHINT Q2 2025 Product Highlights

Discover CHINT’s Q2 2025 innovations—9 new low-voltage solutions designed for safety, reliability, and global performance in power distribution.

JUNE 26, 2025 Did you know CHINT?Global Reach, Local Impact

Discover how CHINT delivers tailored electrical solutions across 140+ countries, solving local infrastructure challenges with innovative, smart technology.

JUNE 18, 2025 Building a New Energy Ecosystem, CHINT Appeared at SNEC 2025

Discover CHINT’s smart microgrids, green tech innovations, and ESG strategy as they reshape the global energy landscape at SNEC 2025.

JUNE 17, 2025 Join the challenge! The 2025 CHINT Cup Global Youth Innovation Contest is now open!

Enter the CHINT Cup 2025 for a chance to showcase cutting-edge innovations in AI, energy, and technology. Global youth welcome. Attractive prizes await.

JUNE 15, 2025 CHINT Wraps Up SENDI 2025 Showcasing New Local Meter Factory

At SENDI 2025, CHINT unveiled its Manaus smart-meter plant, boosting Brazil’s grid with sustainable tech and 350+ new jobs.

JUNE 8, 2025 NOARK Electric has a new address in Czech Republic

NOARK Electric has relocated to Harfa Office Park in Prague 9. Learn about their expansion, new showroom, and upgraded workspace.

MAY 29, 2025 Did you know CHINT?Every Role Has the Power to Shine

Discover the inspiring stories behind CHINT. Learn how our diverse team, from engineers to sales, drives innovation and proves that every role has the power to shine.