Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN

Europe

France
Italy
Kazakhstan
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico

Latin America

Brazil
Colombia
Ecuador
Peru
Utility PV & ESS

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
France
Italy
Kazakhstan
Netherlands
Spain
Turkey
United Kingdom
Mexico
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

How to Install NWK1-G Reactive Power Compensation Controller

FEB 18, 2025

Install NWK1-G Reactive Power Compensation Controller
Install NWK1-G Reactive Power Compensation Controller
Install NWK1-G Reactive Power Compensation Controller

Table of Contents

  1. Preparations for Installing NWK1-G
  2. Installation Steps
  3. How to Test the NWK1-G
  4. Troubleshooting
  5. Conclusion

What is reactive power compensation? It is the process of managing and adjusting reactive power within an electrical system by using power electronic devices like capacitors. The NWK1-G Reactive Power Compensation Controller is designed to adjust the capacity of these capacitors. It helps improve the power factor and ensures efficient energy use.

This guide explores the precise installation steps of NWK1-G. The objective is to help you set up the controller with confidence and technical precision.

Preparations for Installing NWK1-G

Follow these guidelines to prepare for the installation:

1. Safety Precautions

Disconnect the main power supply before beginning. It eliminates the risk of electrical shock. It hence ensures a safe working environment.

Wear insulating gloves and protective glasses. These will shield you from potential electrical hazards. They are your first line of defense during the installation process.

2. Tools and Materials

Gather the right tools and materials for a successful compensation controller installation. The essential tools include:

  • Wire strippers
  • Crimping pliers
  • Electric screwdriver
  • Multimeter
  • Measuring tape
  • Drill

The required materials include:

  • 1.5mm² wires for voltage and control output
  • 2.5mm² wires for current sampling
  • Wire lugs
  • Mounting accessories
NWK1-G Reactive Power Compensation Controller
NWK1-G Reactive Power Compensation Controller
NWK1-G Reactive Power Compensation Controller

Installation Steps

Follow these guidelines for installation:

1. Pre-Installation Checks

Read the instruction manual to understand the controller’s specifications and installation requirements. This step ensures you have comprehensive knowledge before beginning.

Then, confirm that the controller parameters match the specific working conditions of your electrical system.

2. Controller Mounting

Drill a precise 113x113mm hole in the cabinet. Ensure clean and accurate cutting. The location should provide easy access and proper ventilation.

Align the controller carefully and use the provided fastening accessories to secure it firmly. Make sure that the mounting is level and stable.

3. Wiring Procedure

Strip wires to 11-13mm and attach wire lugs using crimping pliers. Ensure clean, precise connections.

Accurate wiring is critical for the NWK1-G Reactive Power Compensation Controller’s optimal performance. Refer to these:

  • COM Terminal: Common terminal for internal relay operations, facilitating standardized signal routing.
  • J1-J10 Terminals: Dedicated control output connections for precise capacitor bank switching and reactive power compensation.
  • Fan and Alarm Terminals: Connect external monitoring components like cooling systems and warning notifications.
  • Wire Identification: Distinguish control and sampling wires carefully. Control and output wires should be 1.5mm². Current sampling wires should be 2.5mm²

How to Test the NWK1-G

After installation, comprehensive testing validates the NWK1-G Reactive Power Compensation Controller’s performance. The key tests include:

1. Power-On Test

This test confirms the controller’s basic operational capabilities and reactive power compensation performance.

Monitor power factor changes after powering on. Observe smooth transitions and automatic reactive power compensation based on system load.

Verify that the power factor reaches the set operational value. Confirm the system stabilizes within the expected performance range.

2. Voltage and Current Verification

Check voltage and current measurements against expected values to confirm stability.

Troubleshooting

Even with careful installation, unexpected issues can arise with the NWK1-G Reactive Power Compensation Controller. Refer to this table to identify the cause of common issues and how to solve them:

Symptom

Cause Analysis

Solution

Black Screen/No Display

Auxiliary power supply AC220V±20% is not connected

Measure voltage between power supply terminals, and ensure AC220V connection

The controller is faulty

Replace the controller if voltage measurements are not AC220V

COS Show “----” Constantly

(1)Sample <20mA blocking current with the display “----”

Sample <20mA blocking current with blocking activated

(2)Current transformer or controller is faulty

(1)Check load conditions, verify CT ratio is appropriate

(2)Check CT short-circuit bridge or open wiring

(3)Measure la phase sampling end

Activate some capacitors manually,

but the COSф value on the controller does not change

(1) The phase sequence or polarity of the sampled voltage Ubc and

current la is

wrong, and the voltage and current are connected across phases

(2) On-site compensation cabinets and auxiliary cabinets are used

(3) COSф shows negative value, such as: -0.87L

Wiring error or in power generation state

(1) Connect the wires correctly according to the wiring requirements

in 5.2

(2) Before debugging, disconnect the auxiliary cabinets first

(3) Activate capacitors manually, and compare the changes of the

COS

value and the reactive power value to determine the wiring

(4) Restart the controller power to automatically recognize the phase

again

*Check the full table for a more comprehensive troubleshooting guide

Conclusion

Installing the NWK1-G Reactive Power Compensation Controller requires precision and technical understanding. At CHINT, we provide comprehensive support to ensure successful implementation. Get in touch and explore our complete range of power solutions and innovative technologies.

The Latest
JUNE 12, 2025 What Is Motor Start Up Current and Why Is It So High?

Discover why motor start-up current is so high and how it affects electrical systems. Learn how to protect motors effectively with CHINT's solutions.

JUNE 12, 2025 Selecting the Right Air Circuit Breaker for Data Centers and Critical Power Distribution

Discover how to select the right air circuit breaker for data centers. Learn about CHINT’s NA8 features, certifications, and smart integration benefits.

JUNE 11, 2025 Everything You Should Know About Solar Pumping System

Understand the benefits, applications, and components of solar pumping systems including CHINT’s NVFPV drives for reliable water access.

JUNE 10, 2025 How Altitude Affects the Performance of Moulded Case Circuit Breakers

Learn the effects of altitude on circuit breakers and explore CHINT’s NM8N-HV MCCB built for extreme conditions with high performance and safety.

JUNE 9, 2025 What Is A Pulse Relay and How Does It Work?

Explore the energy-efficient pulse relay technology used in automation, lighting, and security systems. Featuring CHINT’s NJMC1 relay for reliable performance.

JUNE 7, 2025 Understanding AC Contactors: Uses and Warning Signs of Failure

Learn how to recognize signs of a failing AC contactor and get expert tips on resolving issues, performing maintenance, and ensuring electrical safety.

JUNE 6, 2025 What Are Harmonics and Total Harmonic Distortion (THD) in Power Systems

Discover the causes, impacts, and solutions for harmonics and THD in electrical networks. Enhance reliability with CHINT’s NZB379 controller.

JUNE 6, 2025 Types of Lightning Surge Arresters and Their Functions

Discover the essential types of lightning surge arresters and their working principles. Learn how to protect your electrical systems from voltage surges effectively.

JUNE 5, 2025 Thermal Magnetic Circuit Breakers vs Hydraulic Magnetic Circuit Breakers

A comprehensive comparison of thermal magnetic and hydraulic magnetic circuit breakers. Learn about their protection, environmental susceptibility, trip time, size, and cost with CHINT.

JUNE 5, 2025 Automatic Transfer Switch (ATS) Comprehensive Guide

Explore how ATS ensures uninterrupted power supply for critical applications. Learn about types, uses, performance, and CHINT solutions.