Please enter keywords to search

Global |EN

Choose your country & Language

Asia Pacific

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam

Middle East & Africa

CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN

Europe

France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom

North America

Mexico

Latin America

Brazil
Colombia
Ecuador
Peru
Low-voltage
Power Transmission and Distribution
Low Voltage Switchgear and Software
Instruments and Meters
Telecom & Data Center
Buildings
Products
Solutions
Project References
Corporate Reports
CHINT Global
CHINT's Insights
Careers
Locate Us
Contact Us
Call Us +91 1202 9750 57
Email Us marketing@chint.co.in
Privacy Policy

Choose your country & Language

Australia & New Zealand
India
Indonesia
Korea
Malaysia
Philippines
Singapore
Singapore (Sunlight)
Vietnam
CHINT-EGEMAC
Saudi Arabia
South Africa
UAE
CHINT AJLAN
France
Kazakhstan
Italy
Netherlands
Spain
Turkey
United Kingdom
Mexico
Brazil
Colombia
Ecuador
Peru

Please enter keywords to search

Your search term contains restricted words. Please use different keywords.

CHINT’s Solar Milestone in Ecuador: Overcoming Adversity to Shine

AUG 12, 2023

CHINT-Solar-Milestone-in-Ecuador-4
CHINT-Solar-Milestone-in-Ecuador-4
CHINT-Solar-Milestone-in-Ecuador-4

On August 1st, the 9.65 MW rooftop distributed photovoltaic project for a renowned business group in Ecuador, undertaken by CHINT, was fully powered and connected to the grid in the city of Guayaquil. It passed inspections smoothly.

This project spans approximately 50,000 square meters of rooftop space, with an estimated annual power generation of 12.266 million kW·h, saving the client $1.2 million in electricity costs annually.

CHINT-Solar-Milestone-in-Ecuador-2.
CHINT-Solar-Milestone-in-Ecuador-2.
CHINT-Solar-Milestone-in-Ecuador-2.

After eight months of sales negotiations, CHINT finally secured the order. However, the journey was far from easy. The team faced numerous challenges including the global pandemic, local earthquakes, product losses due to client oversights and the need for restocking, structural reinforcements for many rooftops, and dispersed construction sites making project management difficult.

Nonetheless, with close collaboration between teams, the installation was completed in 1 year and 2 months without any additional costs, and the project was delivered on time and in full quality, earning high praise and recognition from the client.

At the project site located within the business intelligence park, rows of deep blue photovoltaic panels are visible. The project has a planned installation capacity of 9.6 MW, utilizing 450W bifacial mono-crystalline silicon modules and 60kW inverters.

It connects to the grid through low-voltage lines, achieving local power generation, grid connection, conversion, and usage. This approach effectively enhances the power output of photovoltaic stations of a similar size, addressing energy losses during voltage boosting and long-distance transportation

MW-rooftop-distributed-photovoltaic-project-1
MW-rooftop-distributed-photovoltaic-project-1
MW-rooftop-distributed-photovoltaic-project-1

In fact, as early as 2021, CHINT had already partnered with this Ecuadorian business group on a 7.75 MW photovoltaic project covering seven integrated rooftop facilities. Due to CHINT’s strengths, such as a specialized local team, comprehensive industrial chain, effective solutions, product quality, top-notch power station maintenance, and efficient technical support services, the client chose CHINT once again, deepening their collaboration on solar projects.

For this project, the client was driven by green, energy-saving, and eco-friendly principles. Supermarket rooftops with solar photovoltaic panels, rainwater siphoning systems, and glass curtain walls were all designed to maximize natural resource utilization and minimize energy consumption.

Hence, this project demanded high standards not just for power generation and grid connection, but also expertise and experience in electrical equipment installation and calibration.

MW-rooftop-distributed-photovoltaic-project-2
MW-rooftop-distributed-photovoltaic-project-2
MW-rooftop-distributed-photovoltaic-project-2

To meet these requirements, CHINT specially established a localized team in Ecuador comprising sales, electrical technology, project management, and civil construction management professionals. This laid a solid foundation for their future ventures in the region.

The CHINT Ecuador team possesses extensive experience in the installation of photovoltaic station electrical equipment and infrastructure construction. These strengths were fully showcased during the project execution.

From product quality control to installation standards, the team maintained stringent criteria, ensuring the system was not only aesthetically pleasing but also possessed high strength, rigidity, and reliability. Ultimately, thanks to the team’s dedication and collaboration, CHINT flawlessly delivered another “turnkey” project to the client.”

The Latest
AUGUST 22, 2025 Did you know?People at CHINT Highlights the Voices of Progress

Did you know? Behind every innovation and every connection are people who make it happen.

AUGUST 14, 2025 CHINT Lights Up the Caribbean with Smart Metering

CHINT’s Wi-SUN smart metering transforms a Caribbean island’s power grid, boosting efficiency, cutting losses, and enabling real-time remote control.

AUGUST 5, 2025 Boîtiers STA & NOARK: Powering Reliability Across Public and Private Sectors

Boîtiers STA partners with NOARK to deliver safe, high-performance power solutions for hospitals, parks, and public sectors across Canada.

AUGUST 5, 2025 Did you know - From Components to Integrated Systems

CHINT scales smart manufacturing globally—delivering high to low voltage solutions with localized production, digital innovation, and green factories.

AUGUST 5, 2025 CHINT Global Press Release - CHINT Appoint Legend as Master Distributor For Low Voltage Products in Australia and New Zealand

CHINT appoints Legend Corporation as master distributor of LV products in Australia & NZ, boosting access to quality electrical solutions via CABAC.

JULY 24, 2025 Countdown Begins: CHINT Cool Season 2025 Launches August 1!

Join CHINT Cool Season 2025 (Aug 1–Oct 31): global promos, new tech, rewards & events for electricians, installers & builders. Don’t miss out!

JULY 21, 2025 Did You Know? CHINT Global Manufacturing

Explore CHINT’s global manufacturing network with 30+ smart factories in 10+ countries, driving agile, localized power solutions worldwide.

JULY 21, 2025 CHINT Building the Power Backbone of Urban Transit in Malaysia

CHINT supports MRT Corp in Malaysia with scalable low-voltage solutions, ensuring reliable, future-ready power for over 100 urban rail stations.

JULY 21, 2025 CHINT CHINT Breaks South China Smart Tech Hub in Foshan

CHINT breaks ground on a $70M Smart Innovation Park in Foshan, China, driving green energy, smart grid tech, and next-gen manufacturing across South China.

JULY 14, 2025 CHINT Q2 2025 Product Highlights

Discover CHINT’s Q2 2025 innovations—9 new low-voltage solutions designed for safety, reliability, and global performance in power distribution.